If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0615241014002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.25326,"lon":-117.509397,"icon":""}]} |
| Location: 00/14-10-061-24W5/2 | |
| Location Alias: 00/14-10-61-24 W5M | |
| Location Alias 2: 00/14-10-061-24 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 10 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ECA 102 HZ PLACID 5-11-61-24 | |
| Operator Name: Ovintiv Canada ULC | |
| License Number: 0452372 | |
| License Date: 2012-12-18 | |
| License Status: Amended | |
| Spud Date: 2012-12-20 | |
| Final Drill Date: 2013-02-06 | |
| Well Total Depth: 4700.00 m | |
| Surface Hole Latitude: 54.253260 | |
| Surface Hole Longitude: -117.509397 |
| Date | Event |
|---|---|
| 2012-12-18 | Obtained License |
| 2012-12-24 | Surface Casing Operation Performed |
| 2012-12-28 | Direction Drilling Operation Performed - Deviate |
| 2013-01-10 | Direction Drilling Operation Performed - Horizontal |
| 2013-01-17 | Intermediate Casing Operation Performed |
| 2013-02-06 | Finished Drilling |
| 2013-02-06 | Well Log Performed |
| 2013-02-06 | Well Mode changed to Drilled and Cased |
| 2013-02-07 | Well Log Performed |
| 2013-02-09 | Well Log Performed |
| 2013-02-11 | Liner Casing Operation Performed |
| 2013-02-11 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-02-14 | Rig Released |
| 2013-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-12-08 | Well Fluid changed to Gas |
| 2013-12-08 | Well Mode changed to Testing |
| 2014-02-07 | Well Fluid changed to Gas |
| 2014-02-07 | Well Mode changed to Test Completed |
| 2017-02-26 | Well Fluid changed to Gas |
| 2017-02-26 | Well Mode changed to Testing |
| 2017-05-27 | Well Fluid changed to Gas |
| 2017-05-27 | Well Mode changed to Test Completed |
| 2018-12-15 | Well Fluid changed to Gas |
| 2018-12-15 | Well Mode changed to Testing |
| 2019-01-29 | Well Fluid changed to Gas |
| 2019-01-29 | Well Mode changed to Test Completed |
| 2019-01-30 | Well Began Production |
| 2019-01-30 | Well Fluid changed to Gas |
| 2019-01-30 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-12-28 | 1628.00 | Deviate (5 - 79 degrees) |
| 2013-01-10 | 3224.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-02-11 | Open Hole/Barefoot Completion | 4671.00 | 4700.00 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 3811.90 | 3813.20 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 3713.30 | 3714.60 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 3615.50 | 3616.70 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 3516.50 | 3517.70 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 3429.40 | 3430.60 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 3342.30 | 3343.50 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 4606.40 | 4607.40 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 4504.10 | 4505.30 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 4416.90 | 4418.10 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 4316.10 | 4317.30 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 4215.10 | 4216.30 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 4114.90 | 4116.10 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 4013.90 | 4015.10 | 0 |
| 2013-03-01 | Multi-Stage Fracture | 3912.90 | 3914.10 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-02-28 | 2013-03-01 | 2,789 | 6,179 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 89.75 | N/A | |||
| Proppant | Preferred Sands | Crystalline silica. quartz | 14808-60-7 | 100 | 5.0922 | N/A | ||
| ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0654 | N/A | |
| Non-Hazardous | Not Available | 100 | 0.0654 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-02-12 | 2013-03-04 | Municipal Water | 208 |
| 2013-02-22 | 2013-03-01 | Surface Water - Runoff | 6309 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 36 | 0.0 | 0.0 | 0.0 |
| 2017 | 98 | 0.0 | 0.0 | 0.0 |
| 2018 | 6 | 0.0 | 0.0 | 0.0 |
| 2019 | 4 | 0.0 | 0.0 | 0.0 |
| 2020 | 3 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-02-14 | No Incident Encountered | 0.00 | 0.00 |
| 2013-03-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]