X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616011315022

Well Details

Well ID: 0616011315022
Loading map...
Location: 02/15-13-061-01W6/2
Location Alias: 02/15-13-61-01 W6M
Location Alias 2: 02/15-13-061-01 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 01
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: ANEGADA HZ 15D SMOKY 15-13-61-1
Operator Name: Anegada Oil Corp.
License Number: 0491055
License Date: 2018-09-21
License Status: Amended
Spud Date: 2018-10-31
Final Drill Date: 2018-11-27
Well Total Depth: 5774.00 m
Surface Hole Latitude: 54.260746
Surface Hole Longitude: -117.989768

For data sources see[1][2]

Well History

Date Event
2018-09-21 Obtained License
2018-10-31 Surface Casing Operation Performed
2018-11-02 Direction Drilling Operation Performed - Deviate
2018-11-13 Direction Drilling Operation Performed - Horizontal
2018-11-17 Well Log Performed
2018-11-27 Finished Drilling
2018-11-27 Well Log Performed
2018-11-27 Well Mode changed to Drilled and Cased
2018-11-29 Production Casing Operation Performed
2018-11-30 Rig Released
2018-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-14 Well Began Production
2019-01-14 Well Fluid changed to Crude Oil
2019-01-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-11-02 720.90 Deviate (5 - 79 degrees)
2018-11-13 3170.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-12-29 Multi-Stage Fracture 5707.20 5707.30 0
2018-12-30 Multi-Stage Fracture 5540.80 5540.90 0
2019-01-04 Multi-Stage Fracture 3888.50 3888.60 0
2019-01-04 Multi-Stage Fracture 3961.20 3961.30 0
2019-01-04 Multi-Stage Fracture 3870.50 3870.60 0
2019-01-04 Multi-Stage Fracture 3852.30 3852.40 0
2019-01-04 Multi-Stage Fracture 3834.10 3834.20 0
2019-01-04 Multi-Stage Fracture 3816.00 3816.10 0
2019-01-04 Multi-Stage Fracture 3797.80 3797.90 0
2019-01-04 Multi-Stage Fracture 3779.60 3779.70 0
2019-01-04 Multi-Stage Fracture 3761.40 3761.50 0
2019-01-04 Multi-Stage Fracture 3743.20 3743.30 0
2018-12-30 Multi-Stage Fracture 5522.60 5522.70 0
2019-01-04 Multi-Stage Fracture 3725.10 3725.20 0
2019-01-04 Multi-Stage Fracture 3706.90 3707.00 0
2019-01-04 Multi-Stage Fracture 3688.90 3689.00 0
2019-01-04 Multi-Stage Fracture 3670.70 3670.80 0
2019-01-04 Multi-Stage Fracture 3652.50 3652.60 0
2019-01-04 Multi-Stage Fracture 3634.50 3634.60 0
2019-01-04 Multi-Stage Fracture 3616.40 3616.50 0
2019-01-04 Multi-Stage Fracture 3598.30 3598.40 0
2019-01-04 Multi-Stage Fracture 3580.10 3580.20 0
2019-01-04 Multi-Stage Fracture 3562.00 3562.10 0
2018-12-30 Multi-Stage Fracture 5504.70 5504.80 0
2019-01-04 Multi-Stage Fracture 3543.80 3543.90 0
2019-01-05 Multi-Stage Fracture 3525.60 3525.70 0
2018-12-30 Multi-Stage Fracture 5486.50 5486.60 0
2018-12-30 Multi-Stage Fracture 5468.30 5468.40 0
2018-12-30 Multi-Stage Fracture 5450.20 5450.30 0
2018-12-30 Multi-Stage Fracture 5432.00 5432.10 0
2018-12-30 Multi-Stage Fracture 5413.80 5413.90 0
2018-12-30 Multi-Stage Fracture 5395.60 5395.70 0
2018-12-30 Multi-Stage Fracture 5377.40 5377.50 0
2018-12-29 Multi-Stage Fracture 5689.00 5689.10 0
2018-12-30 Multi-Stage Fracture 5359.20 5359.30 0
2018-12-30 Multi-Stage Fracture 5341.10 5341.20 0
2018-12-31 Multi-Stage Fracture 5322.90 5323.00 0
2018-12-31 Multi-Stage Fracture 5304.70 5304.80 0
2018-12-31 Multi-Stage Fracture 5286.60 5286.70 0
2018-12-31 Multi-Stage Fracture 5268.40 5268.50 0
2018-12-31 Multi-Stage Fracture 5250.20 5250.30 0
2018-12-31 Multi-Stage Fracture 5232.00 5232.10 0
2018-12-31 Multi-Stage Fracture 5213.90 5214.00 0
2018-12-31 Multi-Stage Fracture 5195.70 5195.80 0
2018-12-29 Multi-Stage Fracture 5667.80 5667.90 0
2018-12-31 Multi-Stage Fracture 5177.50 5177.60 0
2018-12-31 Multi-Stage Fracture 5159.40 5159.50 0
2018-12-31 Multi-Stage Fracture 5141.20 5141.30 0
2018-12-31 Multi-Stage Fracture 5123.00 5123.10 0
2018-12-31 Multi-Stage Fracture 5104.90 5105.00 0
2018-12-31 Multi-Stage Fracture 5086.70 5086.80 0
2018-12-31 Multi-Stage Fracture 5068.70 5068.80 0
2019-01-01 Multi-Stage Fracture 5050.50 5050.60 0
2019-01-01 Multi-Stage Fracture 5032.40 5032.50 0
2019-01-01 Multi-Stage Fracture 5014.20 5014.30 0
2018-12-29 Multi-Stage Fracture 5649.80 5649.90 0
2019-01-01 Multi-Stage Fracture 4996.20 4996.30 0
2019-01-01 Multi-Stage Fracture 4978.00 4978.10 0
2019-01-01 Multi-Stage Fracture 4959.80 4959.90 0
2019-01-01 Multi-Stage Fracture 4942.00 4942.10 0
2019-01-01 Multi-Stage Fracture 4923.90 4924.00 0
2019-01-01 Multi-Stage Fracture 4905.70 4905.80 0
2019-01-01 Multi-Stage Fracture 4887.50 4887.60 0
2019-01-01 Multi-Stage Fracture 4869.30 4869.40 0
2019-01-01 Multi-Stage Fracture 4851.10 4851.20 0
2019-01-01 Multi-Stage Fracture 4833.20 4833.30 0
2018-12-30 Multi-Stage Fracture 5631.70 5631.80 0
2019-01-01 Multi-Stage Fracture 4815.00 4815.10 0
2019-01-01 Multi-Stage Fracture 4796.80 4796.90 0
2019-01-01 Multi-Stage Fracture 4778.60 4778.70 0
2019-01-01 Multi-Stage Fracture 4760.40 4760.50 0
2019-01-01 Multi-Stage Fracture 4742.20 4742.30 0
2019-01-01 Multi-Stage Fracture 4724.10 4724.20 0
2019-01-01 Multi-Stage Fracture 4705.90 4706.00 0
2019-01-01 Multi-Stage Fracture 4687.70 4687.80 0
2019-01-02 Multi-Stage Fracture 4669.50 4669.60 0
2019-01-02 Multi-Stage Fracture 4651.30 4651.40 0
2018-12-30 Multi-Stage Fracture 5613.50 5613.60 0
2019-01-02 Multi-Stage Fracture 4633.30 4633.40 0
2019-01-02 Multi-Stage Fracture 4615.20 4615.30 0
2019-01-02 Multi-Stage Fracture 4597.00 4597.10 0
2019-01-02 Multi-Stage Fracture 4578.80 4578.90 0
2019-01-02 Multi-Stage Fracture 4560.60 4560.70 0
2019-01-02 Multi-Stage Fracture 4542.40 4542.50 0
2019-01-02 Multi-Stage Fracture 4524.20 4524.50 0
2019-01-02 Multi-Stage Fracture 4506.10 4506.20 0
2019-01-02 Multi-Stage Fracture 4488.20 4488.30 0
2019-01-02 Multi-Stage Fracture 4470.00 4470.10 0
2018-12-30 Multi-Stage Fracture 5595.30 5595.40 0
2019-01-02 Multi-Stage Fracture 4451.80 4451.90 0
2019-01-02 Multi-Stage Fracture 4433.70 4433.80 0
2019-01-02 Multi-Stage Fracture 4415.50 4415.60 0
2019-01-02 Multi-Stage Fracture 4397.30 4397.40 0
2019-01-02 Multi-Stage Fracture 4379.30 4379.40 0
2019-01-03 Multi-Stage Fracture 4361.10 4361.20 0
2019-01-03 Multi-Stage Fracture 4343.00 4343.10 0
2019-01-03 Multi-Stage Fracture 4324.80 4324.90 0
2019-01-03 Multi-Stage Fracture 4306.60 4306.70 0
2019-01-03 Multi-Stage Fracture 4288.40 4288.50 0
2018-12-30 Multi-Stage Fracture 5577.20 5577.30 0
2019-01-03 Multi-Stage Fracture 4270.20 4270.30 0
2019-01-03 Multi-Stage Fracture 4252.00 4252.10 0
2019-01-03 Multi-Stage Fracture 4233.90 4234.00 0
2019-01-03 Multi-Stage Fracture 4215.70 4215.80 0
2019-01-03 Multi-Stage Fracture 4197.50 4197.60 0
2019-01-03 Multi-Stage Fracture 4179.30 4179.40 0
2019-01-03 Multi-Stage Fracture 4161.10 4161.20 0
2019-01-03 Multi-Stage Fracture 4143.00 4143.10 0
2019-01-03 Multi-Stage Fracture 4124.80 4124.90 0
2019-01-03 Multi-Stage Fracture 4106.60 4106.70 0
2018-12-30 Multi-Stage Fracture 5559.00 5559.10 0
2019-01-03 Multi-Stage Fracture 4088.40 4088.50 0
2019-01-03 Multi-Stage Fracture 4070.20 4070.30 0
2019-01-03 Multi-Stage Fracture 4052.10 4052.20 0
2019-01-03 Multi-Stage Fracture 4033.90 4034.00 0
2019-01-03 Multi-Stage Fracture 4015.70 4015.80 0
2019-01-03 Multi-Stage Fracture 3997.60 3997.70 0
2019-01-03 Multi-Stage Fracture 3979.40 3979.50 0
2019-01-04 Multi-Stage Fracture 3943.00 3943.10 0
2019-01-04 Multi-Stage Fracture 3924.80 3924.90 0
2019-01-04 Multi-Stage Fracture 3906.60 3906.70 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-29 2019-01-05 3,307 20,418 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.5506 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.5486 N/A
Water 7732-18-5 100 92.9181 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 6.0391 N/A
50/140 Element Crystalline Silica (Quartz) 14808-60-7 100 1.0426 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0223 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0223 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0458 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0458 N/A
ELECI-4 Corrosion Inhibitor Element Corrosion Inhibitor 2-Propanol 67-63-0 100 0.0034 N/A
Acetic acid 64-19-7 100 0.0034 N/A
Cinnamaldehyde 104-55-2 100 0.0034 N/A
Ethylene glycol 107-21-1 100 0.0034 N/A
Formic acid 64-18-6 100 0.0034 N/A
Poly(oxy-1.2-ethanediyl). alpha-[tris(1-phenylethyl)phenyl]-
omega -hydroxy-
99734-09-5 100 0.0034 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0198 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0198 N/A
ELEIR-1 Iron Control Element Iron Control 2-Mercaptoethanol 60-24-2 100 0.0017 N/A
Ammonium chloride 12125-02-9 100 0.0017 N/A
Ammonium hydroxide 1336-21-6 100 0.0017 N/A
Copper(I) chloride 7758-89-6 100 0.0017 N/A
Ethanol. 2.2'-dithiodi 1892-29-1 100 0.0017 N/A
ELEScale-2 Element Scale Inhibitor Ethylene Glycol 107-21-1 100 0.0307 N/A
Methanol 67-56-1 100 0.0307 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0307 N/A
Organophosphonate 15827-60-8 100 0.0307 N/A
ELESurf-4 Element Surfactant Alkylbenzenesulfonic acid 27176-87-0 100 0.0907 N/A
Methanol 67-56-1 100 0.0907 N/A
Polyglycol 31694-55-0 100 0.0907 N/A
Polyol 52624-57-4 100 0.0907 N/A
Water 7732-18-5 100 0.0907 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-01 2018-10-19 Surface Water - River 35065
2018-12-05 2018-12-05 Municipal Water 25

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5643 0.0 0.0 0.0
2020 1577 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-30 No Incident Encountered 0.00 0.00
2019-01-11 No Incident Encountered 0.00 0.00

For data sources see[9]

References