X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616031501002

Well Details

Well ID: 0616031501002
Loading map...
Location: 00/01-15-061-03W6/2
Location Alias: 00/01-15-61-03 W6M
Location Alias 2: 00/01-15-061-03 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 03
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ JAYAR 1-15-61-3
Operator Name: XTO Energy Canada ULC
License Number: 0439087
License Date: 2011-11-16
License Status: Amended
Spud Date: 2011-12-01
Final Drill Date: 2012-02-11
Well Total Depth: 5296.00 m
Surface Hole Latitude: 54.284537
Surface Hole Longitude: -118.353900

For data sources see[1][2]

Well History

Date Event
2011-11-16 Obtained License
2011-12-05 Conductor Casing Operation Performed
2011-12-17 Surface Casing Operation Performed
2012-01-16 Direction Drilling Operation Performed - Horizontal
2012-01-20 Production Casing Operation Performed
2012-01-20 Well Log Performed
2012-02-11 Finished Drilling
2012-02-11 Well Log Performed
2012-02-11 Well Mode changed to Drilled and Cased
2012-02-14 Liner Casing Operation Performed
2012-02-14 Perforation Treatment Performed - Open-Hole Completion
2012-02-16 Rig Released
2012-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-29 Well Began Production
2012-03-29 Well Fluid changed to Gas
2012-03-29 Well Mode changed to Flowing
2017-09-20 Well Fluid changed to Gas
2017-09-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-16 3364.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-14 Open Hole/Barefoot Completion 5289.00 5296.00 0
2012-03-24 Multi-Stage Fracture 4398.70 4400.40 0
2012-03-25 Multi-Stage Fracture 4262.30 4263.90 0
2012-03-25 Multi-Stage Fracture 4140.00 4141.70 0
2012-03-25 Multi-Stage Fracture 4047.50 4049.20 0
2012-03-25 Multi-Stage Fracture 3940.70 3942.40 0
2012-03-25 Multi-Stage Fracture 3820.20 3821.90 0
2012-03-25 Multi-Stage Fracture 3712.10 3713.70 0
2012-03-25 Multi-Stage Fracture 3636.50 3638.20 0
2012-03-22 Multi-Stage Fracture 5277.30 5279.90 0
2012-03-22 Multi-Stage Fracture 5213.50 5215.20 0
2012-03-22 Multi-Stage Fracture 5101.80 5103.50 0
2012-03-23 Multi-Stage Fracture 4977.70 4979.30 0
2012-03-23 Multi-Stage Fracture 4865.30 4866.90 0
2012-03-23 Multi-Stage Fracture 4728.80 4730.50 0
2012-03-23 Multi-Stage Fracture 4612.70 4614.30 0
2012-03-23 Multi-Stage Fracture 4476.30 4478.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5086 0.0 0.0 0.0
2013 7296 0.0 0.0 0.0
2014 7437 0.0 0.0 0.0
2015 6682 0.0 0.0 0.0
2016 8164 0.0 0.0 0.0
2017 7001 0.0 0.0 0.0
2018 6041 0.0 0.0 0.0
2019 36 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References