X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616033404022

Well Details

Well ID: 0616033404022
Loading map...
Location: 02/04-34-061-03W6/2
Location Alias: 02/04-34-61-03 W6M
Location Alias 2: 02/04-34-061-03 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 03
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC 102 HZ JAYAR 4-34-61-3
Operator Name: XTO Energy Canada ULC
License Number: 0434572
License Date: 2011-06-23
License Status: Amended
Spud Date: 2011-07-22
Final Drill Date: 2011-09-25
Well Total Depth: 5130.00 m
Surface Hole Latitude: 54.299671
Surface Hole Longitude: -118.372216

For data sources see[1][2]

Well History

Date Event
2011-06-23 Obtained License
2011-07-20 Well Log Performed
2011-07-25 Surface Casing Operation Performed
2011-09-01 Direction Drilling Operation Performed - Horizontal
2011-09-12 Production Casing Operation Performed
2011-09-25 Finished Drilling
2011-09-25 Well Mode changed to Drilled and Cased
2011-09-26 Well Log Performed
2011-09-30 Liner Casing Operation Performed
2011-09-30 Perforation Treatment Performed - Open-Hole Completion
2011-10-01 Rig Released
2011-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-15 Well Fluid changed to Gas
2011-10-15 Well Mode changed to Testing
2011-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-23 Well Log Performed
2011-10-26 Perforation Treatment Performed - Jet Perforation
2011-10-27 Perforation Treatment Performed - Fractured
2012-02-28 Well Began Production
2012-02-28 Well Fluid changed to Gas
2012-02-28 Well Mode changed to Flowing
2016-06-01 Well Fluid changed to Gas
2016-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-01 3450.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-30 Open Hole/Barefoot Completion 5125.00 5130.00 0
2011-10-17 Multi-Stage Fracture 4339.80 4341.50 0
2011-10-17 Multi-Stage Fracture 4231.20 4232.80 0
2011-10-17 Multi-Stage Fracture 4133.40 4135.10 0
2011-10-17 Multi-Stage Fracture 4035.40 4037.10 0
2011-10-18 Multi-Stage Fracture 3926.20 3927.90 0
2011-10-18 Multi-Stage Fracture 3841.10 3842.80 0
2011-10-18 Multi-Stage Fracture 3734.00 3735.60 0
2011-10-18 Multi-Stage Fracture 3661.50 3663.10 0
2011-10-26 Perforation 3558.00 3560.00 13
2011-10-26 Perforation 3562.00 3564.00 13
2011-10-14 Multi-Stage Fracture 5115.10 5116.40 0
2011-10-27 Fracture 3558.00 3564.00 0
2011-10-14 Multi-Stage Fracture 5032.70 5034.30 0
2011-10-14 Multi-Stage Fracture 4944.10 4945.80 0
2011-10-14 Multi-Stage Fracture 4843.80 4845.50 0
2011-10-16 Multi-Stage Fracture 4743.50 4745.20 0
2011-10-16 Multi-Stage Fracture 4632.40 4634.10 0
2011-10-16 Multi-Stage Fracture 4542.10 4543.70 0
2011-10-17 Multi-Stage Fracture 4435.20 4436.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 127 0.0 0.0 0.0
2012 6145 0.0 0.0 0.0
2013 3173 0.0 0.0 0.0
2014 4878 0.0 0.0 0.0
2015 2870 0.0 0.0 0.0
2016 3661 0.0 0.0 0.0
2017 6285 0.0 0.0 0.0
2018 7706 0.0 0.0 0.0
2019 1871 0.0 0.0 0.0

For data sources see[6]

References