X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616122711002

Well Details

Well ID: 0616122711002
Loading map...
Location: 00/11-27-061-12W6/2
Location Alias: 00/11-27-61-12 W6M
Location Alias 2: 00/11-27-061-12 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 12
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: CONOCO 100 STETSON 11-27-61-12
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0318965
License Date: 2004-11-16
License Status: Abandoned
Spud Date: 2005-02-14
Final Drill Date: 2005-03-14
Well Total Depth: 2630.00 m
Surface Hole Latitude: 54.308253
Surface Hole Longitude: -119.712868

For data sources see[1][2]

Well History

Date Event
2004-11-16 Obtained License
2005-02-20 Surface Casing Operation Performed
2005-03-14 Finished Drilling
2005-03-14 Well Mode changed to Drilled and Cased
2005-03-15 Well Log Performed
2005-03-18 Production Casing Operation Performed
2005-03-18 Rig Released
2006-01-09 Well Log Performed
2006-01-10 Perforation Treatment Performed - Jet Perforation
2006-01-10 Well Log Performed
2006-01-14 Perforation Treatment Performed - Fractured
2006-01-15 Perforation Treatment Performed - Jet Perforation
2006-01-15 Well Log Performed
2006-01-16 Perforation Treatment Performed - Fractured
2006-01-16 Well Log Performed
2006-01-19 Well Log Performed
2006-01-20 Perforation Treatment Performed - Jet Perforation
2006-01-20 Well Log Performed
2006-01-21 Perforation Treatment Performed - Fractured
2006-01-21 Well Fluid changed to Gas
2006-01-21 Well Mode changed to Testing
2006-03-26 Well Began Production
2006-03-26 Well Fluid changed to Gas
2006-03-26 Well Mode changed to Flowing
2006-03-27 Well Structure changed to Commingled
2011-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-25 Perforation Treatment Performed - Jet Perforation
2011-02-25 Plug Back Performed
2011-02-25 Well Log Performed
2011-02-25 Well Mode changed to Abandoned Zone
2011-02-25 Well Structure changed to Commingled
2011-02-26 Perforation Treatment Performed - Remedial Casing
2011-03-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-10 Perforation 2572.00 2577.00 20
2011-02-25 Perforation 674.00 675.00 17
2011-02-26 Remedial Casing Cementing 674.00 675.00 0
2006-01-14 Fracture 2572.00 2577.00 0
2006-01-15 Perforation 2558.00 2562.00 20
2006-01-16 Fracture 2558.00 2562.00 0
2006-01-20 Perforation 2144.50 2149.50 20
2006-01-20 Perforation 2139.50 2144.50 20
2006-01-21 Fracture 2139.50 2149.50 0
2011-02-25 Packing Device Capped w/Cement 2540.00 2548.00 0
2011-02-25 Packing Device Capped w/Cement 2127.00 2135.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 83 0.0 0.0 0.0

For data sources see[5]

References