If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624011910032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.379598,"lon":-110.140653,"icon":""}]} |
Location: 03/10-19-062-01W4/2 | |
Location Alias: 03/10-19-62-01 W4M | |
Location Alias 2: 03/10-19-062-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 01 | |
Section: 19 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: BOW RIVER BEAVRDM 10-19-62-1 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0395781 | |
License Date: 2008-04-07 | |
License Status: Suspension | |
Spud Date: 2008-07-02 | |
Final Drill Date: 2008-07-03 | |
Well Total Depth: 549.00 m | |
Surface Hole Latitude: 54.379598 | |
Surface Hole Longitude: -110.140653 |
Date | Event |
---|---|
2008-04-07 | Obtained License |
2008-07-03 | Finished Drilling |
2008-07-03 | Surface Casing Operation Performed |
2008-07-03 | Well Mode changed to Drilled and Cased |
2008-07-04 | Production Casing Operation Performed |
2008-07-04 | Rig Released |
2008-07-04 | Well Log Performed |
2008-07-23 | Perforation Treatment Performed - Jet Perforation |
2008-07-23 | Well Log Performed |
2008-09-11 | Perforation Treatment Performed - Jet Perforation |
2008-09-11 | Well Log Performed |
2008-09-12 | Well Began Production |
2008-09-12 | Well Fluid changed to Crude Oil |
2008-09-12 | Well Mode changed to Pumping |
2008-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-23 | Plug Back Performed |
2008-10-23 | Well Fluid changed to Crude Oil |
2008-10-23 | Well Mode changed to Abandoned Zone |
2008-10-24 | Perforation Treatment Performed - Jet Perforation |
2008-10-24 | Well Log Performed |
2011-02-23 | Well Log Performed |
2011-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-18 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-07-23 | Perforation | 384.00 | 388.00 | 26 |
2008-09-11 | Perforation | 368.50 | 373.00 | 26 |
2008-10-23 | Packing Device Capped w/Cement | 373.90 | 381.90 | 0 |
2008-10-23 | Packing Device Capped w/Cement | 358.30 | 366.30 | 0 |
2008-10-24 | Perforation | 335.50 | 338.00 | 26 |
2011-08-18 | Packing Device Capped w/Cement | 319.50 | 327.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 974 | 0.0 | 0.0 | 0.0 |
For data sources see[5]