X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624032011AB0

Well Details

Well ID: 0624032011AB0
Loading map...
Location: AB/11-20-062-03W4/0
Location Alias: AB/11-20-62-03 W4M
Location Alias 2: AB/11-20-062-03 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 03
Section: 20
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: COPRC 1AB EX-1 KENT 11-20-62-3
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0050700A
License Date: 1974-08-01
License Status: Abandoned
Spud Date: 1974-09-23
Final Drill Date: 1974-09-25
Well Total Depth: 422.10 m
Surface Hole Latitude: 54.379921
Surface Hole Longitude: -110.419857

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-08-01 Obtained License
1974-09-25 Finished Drilling
1974-09-25 Production Casing Operation Performed
1974-09-25 Well Log Performed
1974-09-25 Well Mode changed to Drilled and Cased
1974-10-10 Well Log Performed
1975-07-24 Perforation Treatment Performed - Jet Perforation
1975-10-20 Well Began Production
1975-10-20 Well Fluid changed to Crude Bitumen
1975-10-20 Well Type changed to Cyclical
1976-01-13 Perforation Treatment Performed - Cement Squeeze
1976-01-15 Perforation Treatment Performed - Cement Squeeze
1976-01-15 Perforation Treatment Performed - Jet Perforation
1976-01-16 Perforation Treatment Performed - Jet Perforation
1976-03-11 Perforation Treatment Performed - Jet Perforation
1979-12-06 Well Fluid changed to Crude Bitumen
1979-12-06 Well Mode changed to Suspended
1979-12-06 Well Type changed to Cyclical
1985-01-28 Well Log Performed
1985-02-25 Perforation Treatment Performed - Jet Perforation
1985-02-25 Well Log Performed
1985-02-28 Perforation Treatment Performed - Cement Squeeze
1985-03-01 Well Fluid changed to Crude Bitumen
1985-03-01 Well Type changed to Cyclical
1985-03-07 Well Log Performed
1989-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-04 Plug Back Performed
1989-10-04 Well Fluid changed to Crude Bitumen
1989-10-04 Well Mode changed to Abandoned Zone
1989-10-04 Well Type changed to Cyclical
1990-08-31 Perforation Treatment Performed - Abrasa-Jet Perforation
1990-08-31 Perforation Treatment Performed - Remedial Casing
1990-09-05 Perforation Treatment Performed - Abrasa-Jet Perforation
1990-09-05 Perforation Treatment Performed - Remedial Casing
1991-08-22 Perforation Treatment Performed - Jet Perforation
1991-09-10 Perforation Treatment Performed - Cement Squeeze
1992-07-06 Well Abandoned
1992-07-06 Well Fluid changed to Crude Bitumen
1992-07-06 Well Mode changed to Abandoned
1992-07-06 Well Type changed to Cyclical
2015-09-29 Perforation Treatment Performed - Jet Perforation
2015-09-29 Well Log Performed
2015-10-01 Perforation Treatment Performed - Cement Plug
2015-10-01 Perforation Treatment Performed - Jet Perforation
2015-10-01 Well Log Performed
2015-10-02 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-24 Perforation 385.30 388.30 7
1989-10-04 Packing Device Capped w/Cement 332.00 382.00 0
1990-08-31 Hydra Jet Perforation 260.00 260.00 0
1990-08-31 Remedial Casing Cementing 260.00 260.00 0
1990-09-05 Hydra Jet Perforation 120.00 120.00 0
1990-09-05 Remedial Casing Cementing 120.00 120.00 0
1991-08-22 Perforation 94.00 96.00 18
1991-09-10 Cement Squeeze 94.00 96.00 0
2015-09-29 Perforation 277.00 286.00 18
2015-09-29 Perforation 277.00 286.00 18
2015-10-01 Perforation 277.00 286.00 18
1975-07-24 Perforation 389.50 392.60 7
2015-10-01 Perforation 277.00 286.00 18
2015-10-01 Cement Plug 295.90 296.20 0
2015-10-02 Remedial Casing Cementing 245.00 292.20 0
1976-01-13 Cement Squeeze 385.30 388.30 0
1976-01-15 Perforation 396.50 397.10 18
1976-01-15 Cement Squeeze 396.50 397.10 0
1976-01-16 Perforation 387.10 390.10 7
1976-03-11 Perforation 385.90 388.90 13
1985-02-25 Perforation 396.30 396.60 18
1985-02-28 Cement Squeeze 396.30 396.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 432 0.0 0.0 0.0
1976 5327 0.0 0.0 0.0
1977 4308 0.0 0.0 0.0
1978 7344 0.0 0.0 0.0
1979 5304 0.0 0.0 0.0
1985 3288 0.0 0.0 0.0
1986 3672 0.0 0.0 0.0
1987 8571 0.0 0.0 0.0
1988 6946 0.0 0.0 0.0
1989 3412 0.0 0.0 0.0

For data sources see[5]

References