If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624032012AC0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.379717,"lon":-110.424738,"icon":""}]} |
Location: AC/12-20-062-03W4/0 | |
Location Alias: AC/12-20-62-03 W4M | |
Location Alias 2: AC/12-20-062-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 03 | |
Section: 20 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: COPRC 1AC EX-5 KENT 12-20-62-3 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0050700F | |
License Date: 1974-08-01 | |
License Status: Abandoned | |
Spud Date: 1974-09-05 | |
Final Drill Date: 1974-09-07 | |
Well Total Depth: 435.20 m | |
Surface Hole Latitude: 54.379717 | |
Surface Hole Longitude: -110.424738 |
Date | Event |
---|---|
1974-08-01 | Obtained License |
1974-09-07 | Finished Drilling |
1974-09-07 | Well Log Performed |
1974-09-07 | Well Mode changed to Drilled and Cased |
1974-09-08 | Production Casing Operation Performed |
1975-12-15 | Perforation Treatment Performed - Jet Perforation |
1975-12-27 | Well Began Production |
1975-12-27 | Well Fluid changed to Crude Bitumen |
1975-12-27 | Well Type changed to Cyclical |
1977-03-22 | Well Log Performed |
1982-03-01 | Well Log Performed |
1983-11-30 | Well Fluid changed to Crude Bitumen |
1983-11-30 | Well Mode changed to Suspended |
1983-11-30 | Well Type changed to Cyclical |
1989-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-10-10 | Plug Back Performed |
1989-10-10 | Well Abandoned |
1989-10-10 | Well Fluid changed to Crude Bitumen |
1989-10-10 | Well Mode changed to Abandoned |
1989-10-10 | Well Type changed to Cyclical |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-12-15 | Perforation | 390.10 | 393.20 | 13 |
1989-10-10 | Packing Device Capped w/Cement | 335.00 | 385.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 4152 | 0.0 | 0.0 | 0.0 |
1977 | 6312 | 0.0 | 0.0 | 0.0 |
1978 | 7512 | 0.0 | 0.0 | 0.0 |
1979 | 4583 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]