If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624032014AC0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.383257,"lon":-110.422227,"icon":""}]} |
Location: AC/14-20-062-03W4/0 | |
Location Alias: AC/14-20-62-03 W4M | |
Location Alias 2: AC/14-20-062-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 03 | |
Section: 20 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: COPRC 1AC EX-13 KENT 14-20-62-3 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0050701C | |
License Date: 1974-08-01 | |
License Status: Abandoned | |
Spud Date: 1974-09-30 | |
Final Drill Date: 1974-10-02 | |
Well Total Depth: 423.70 m | |
Surface Hole Latitude: 54.383257 | |
Surface Hole Longitude: -110.422227 |
Date | Event |
---|---|
1974-08-01 | Obtained License |
1974-10-02 | Finished Drilling |
1974-10-02 | Production Casing Operation Performed |
1974-10-02 | Well Log Performed |
1974-10-02 | Well Mode changed to Drilled and Cased |
1987-10-05 | Well Log Performed |
1987-10-06 | Perforation Treatment Performed - Jet Perforation |
1987-11-12 | Well Began Production |
1987-11-12 | Well Fluid changed to Crude Bitumen |
1987-11-12 | Well Type changed to Cyclical |
1989-10-18 | Well Log Performed |
1989-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-11-07 | Plug Back Performed |
1989-11-07 | Well Abandoned |
1989-11-07 | Well Fluid changed to Crude Bitumen |
1989-11-07 | Well Mode changed to Abandoned |
1989-11-07 | Well Type changed to Cyclical |
1990-09-11 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1990-09-11 | Perforation Treatment Performed - Remedial Casing |
1990-09-12 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1990-09-12 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-10-06 | Perforation | 386.50 | 391.40 | 7 |
1989-11-07 | Packing Device Capped w/Cement | 334.50 | 384.50 | 0 |
1990-09-11 | Hydra Jet Perforation | 260.00 | 260.00 | 0 |
1990-09-11 | Remedial Casing Cementing | 260.00 | 260.00 | 0 |
1990-09-12 | Hydra Jet Perforation | 120.00 | 120.00 | 0 |
1990-09-12 | Remedial Casing Cementing | 120.00 | 120.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 192 | 0.0 | 0.0 | 0.0 |
1988 | 995 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]