If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624171709000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/09-17-062-17W4/0 | |
Location Alias: 00/09-17-62-17 W4M | |
Location Alias 2: 00/09-17-062-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 17 | |
Section: 17 | |
County/Municipality: Smoky Lake County | |
Well Name: ACL FIGURE LAKE 9-17-62-17 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0168201 | |
License Date: 1994-06-28 | |
License Status: Suspension | |
Spud Date: 1994-08-16 | |
Final Drill Date: 1994-08-20 | |
Well Total Depth: 701.50 m | |
Surface Hole Latitude: 54.365308 | |
Surface Hole Longitude: -112.500105 |
Date | Event |
---|---|
1994-06-28 | Obtained License |
1994-08-16 | Surface Casing Operation Performed |
1994-08-18 | Direction Drilling Operation Performed - Deviate |
1994-08-20 | Finished Drilling |
1994-08-20 | Well Log Performed |
1994-08-20 | Well Mode changed to Drilled and Cased |
1994-08-21 | Production Casing Operation Performed |
1994-08-21 | Rig Released |
1994-09-07 | Perforation Treatment Performed - Open-Hole Completion |
1994-10-31 | Well Log Performed |
1994-12-10 | Well Began Production |
1994-12-10 | Well Fluid changed to Gas |
1994-12-10 | Well Mode changed to Flowing |
1995-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-01-06 | Perforation Treatment Performed - Jet Perforation |
1995-01-06 | Plug Back Performed |
1995-01-06 | Well Fluid changed to Gas |
1995-01-06 | Well Mode changed to Abandoned Zone |
2020-01-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-01-22 | Plug Back Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-08-18 | 320.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-09-07 | Open Hole/Barefoot Completion | 696.00 | 701.50 | 0 |
1995-01-06 | Packing Device Capped w/Cement | 687.00 | 695.00 | 0 |
1995-01-06 | Perforation | 552.00 | 555.00 | 26 |
1995-01-06 | Perforation | 664.00 | 665.00 | 13 |
2020-01-22 | Packing Device Capped w/Cement | 649.00 | 657.00 | 0 |
2020-01-22 | Packing Device Capped w/Cement | 537.00 | 545.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 120 | 0.0 | 0.0 | 0.0 |
1995 | 547 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-01-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]