If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624231504002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.358653,"lon":-113.370577,"icon":""}]} |
Location: 00/04-15-062-23W4/2 | |
Location Alias: 00/04-15-62-23 W4M | |
Location Alias 2: 00/04-15-062-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 23 | |
Section: 15 | |
County/Municipality: Athabasca County | |
Well Name: Canlin ABEE 4-15-62-23 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0190343 | |
License Date: 1996-08-08 | |
License Status: Amended | |
Spud Date: 1996-08-31 | |
Final Drill Date: 1996-09-02 | |
Well Total Depth: 825.00 m | |
Surface Hole Latitude: 54.358653 | |
Surface Hole Longitude: -113.370577 |
Date | Event |
---|---|
1996-08-08 | Obtained License |
1996-09-01 | Surface Casing Operation Performed |
1996-09-02 | Finished Drilling |
1996-09-02 | Well Log Performed |
1996-09-02 | Well Mode changed to Drilled and Cased |
1996-09-03 | Drill Stem Test Performed |
1996-09-04 | Production Casing Operation Performed |
1996-09-04 | Rig Released |
1996-09-04 | Well Log Performed |
1996-10-13 | Well Log Performed |
1996-10-14 | Perforation Treatment Performed - Jet Perforation |
1996-10-14 | Well Log Performed |
1996-10-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-15 | Perforation Treatment Performed - Jet Perforation |
1996-10-15 | Plug Back Performed |
1996-10-15 | Well Log Performed |
1996-10-19 | Perforation Treatment Performed - Jet Perforation |
1996-10-19 | Perforation Treatment Performed - Selective Jet Perforations |
1996-10-19 | Well Log Performed |
1996-10-29 | Well Began Production |
1996-10-29 | Well Fluid changed to Gas |
1996-10-29 | Well Mode changed to Flowing |
1999-03-06 | Perforation Treatment Performed - Jet Perforation |
1999-03-06 | Well Log Performed |
1999-03-08 | Well Fluid changed to Gas |
1999-03-08 | Well Mode changed to Flowing |
1999-03-26 | Well Fluid changed to Gas |
1999-03-26 | Well Mode changed to Suspended |
2003-12-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-12-28 | Perforation Treatment Performed - Jet Perforation |
2003-12-28 | Plug Back Performed |
2003-12-28 | Well Log Performed |
2003-12-29 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2003-12-31 | Well Fluid changed to Gas |
2003-12-31 | Well Mode changed to Flowing |
2009-10-01 | Well Fluid changed to Gas |
2009-10-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-10-14 | Perforation | 798.00 | 799.50 | 13 |
2003-12-28 | Perforation | 659.00 | 660.50 | 17 |
2003-12-29 | Casing Patch | 649.50 | 652.00 | 0 |
2003-12-29 | Casing Patch | 169.50 | 173.50 | 0 |
1996-10-15 | Packing Device Capped w/Cement | 787.00 | 795.00 | 0 |
1996-10-15 | Perforation | 777.30 | 778.30 | 13 |
1996-10-19 | Selective Jet Perforations | 650.50 | 651.50 | 2 |
1996-10-19 | Perforation | 649.50 | 652.00 | 13 |
1999-03-06 | Perforation | 169.50 | 173.50 | 20 |
2003-12-28 | Packing Device Capped w/Cement | 761.00 | 769.00 | 0 |
2003-12-28 | Perforation | 741.00 | 742.00 | 17 |
2003-12-28 | Perforation | 655.00 | 657.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 1512 | 0.0 | 0.0 | 0.0 |
1997 | 8395 | 0.0 | 0.0 | 0.0 |
1998 | 8479 | 0.0 | 0.0 | 0.0 |
1999 | 1598 | 0.0 | 0.0 | 0.0 |
2003 | 16 | 0.0 | 0.0 | 0.0 |
2004 | 6962 | 0.0 | 0.0 | 0.0 |
For data sources see[5]