If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624240505004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.3314,"lon":-113.569931,"icon":""}]} |
Location: 00/05-05-062-24W4/4 | |
Location Alias: 00/05-05-62-24 W4M | |
Location Alias 2: 00/05-05-062-24 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Athabasca County | |
Well Name: RENAISSANCE ROCHESTER 5-5-62-24 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0184501 | |
License Date: 1996-01-12 | |
License Status: Suspension | |
Spud Date: 1996-02-12 | |
Final Drill Date: 1996-02-15 | |
Well Total Depth: 914.00 m | |
Surface Hole Latitude: 54.331400 | |
Surface Hole Longitude: -113.569931 |
Date | Event |
---|---|
1996-01-12 | Obtained License |
1996-02-13 | Surface Casing Operation Performed |
1996-02-15 | Finished Drilling |
1996-02-15 | Well Log Performed |
1996-02-15 | Well Mode changed to Drilled and Cased |
1996-02-16 | Production Casing Operation Performed |
1996-02-16 | Rig Released |
1996-02-25 | Perforation Treatment Performed - Jet Perforation |
1996-08-18 | Perforation Treatment Performed - Jet Perforation |
1996-10-08 | Perforation Treatment Performed - Jet Perforation |
1997-02-09 | Perforation Treatment Performed - Jet Perforation |
1997-11-04 | Perforation Treatment Performed - Jet Perforation |
1998-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-05-26 | Plug Back Performed |
2000-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-06-22 | Perforation Treatment Performed - Jet Perforation |
2000-06-22 | Plug Back Performed |
2001-01-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-01-28 | Perforation Treatment Performed - Jet Perforation |
2001-01-28 | Plug Back Performed |
2001-01-28 | Well Log Performed |
2001-01-28 | Well Mode changed to Drilled and Cased |
2001-02-01 | Well Began Production |
2001-02-01 | Well Fluid changed to Gas |
2001-02-01 | Well Mode changed to Flowing |
2004-05-29 | Perforation Treatment Performed - Fractured |
2005-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-02-17 | Perforation Treatment Performed - Jet Perforation |
2005-02-17 | Plug Back Performed |
2005-02-17 | Well Fluid changed to Gas |
2005-02-17 | Well Mode changed to Abandoned Zone |
2005-02-18 | Well Log Performed |
2005-03-03 | Perforation Treatment Performed - Fractured |
2005-04-04 | Well Fluid changed to Gas |
2005-04-04 | Well Mode changed to Suspended |
2017-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-01-19 | Plug Back Performed |
2017-01-19 | Well Fluid changed to Gas |
2017-01-19 | Well Mode changed to Abandoned Zone |
2018-10-21 | Perforation Treatment Performed - Jet Perforation |
2018-10-22 | Perforation Treatment Performed - Jet Perforation |
2018-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-10-25 | Perforation Treatment Performed - Cement Plug |
2018-10-25 | Perforation Treatment Performed - Remedial Casing |
2018-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-10-27 | Perforation Treatment Performed - Cement Plug |
2018-10-27 | Perforation Treatment Performed - Remedial Casing |
2018-10-28 | Well Log Performed |
2018-10-30 | Perforation Treatment Performed - Jet Perforation |
2018-11-05 | Perforation Treatment Performed - Jet Perforation |
2018-11-06 | Well Log Performed |
2018-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-07 | Perforation Treatment Performed - Cement Plug |
2018-11-07 | Perforation Treatment Performed - Remedial Casing |
2019-10-05 | Perforation Treatment Performed - Jet Perforation |
2019-10-06 | Perforation Treatment Performed - Jet Perforation |
2019-10-07 | Perforation Treatment Performed - Jet Perforation |
2019-10-10 | Perforation Treatment Performed - Jet Perforation |
2019-10-11 | Perforation Treatment Performed - Jet Perforation |
2019-10-11 | Well Log Performed |
2019-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-21 | Perforation Treatment Performed - Cement Plug |
2019-10-21 | Perforation Treatment Performed - Cement Squeeze |
2019-10-21 | Perforation Treatment Performed - Remedial Casing |
2019-10-21 | Plug Back Performed |
2019-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2019-10-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-28 | Perforation Treatment Performed - Cement Plug |
2019-10-28 | Perforation Treatment Performed - Cement Squeeze |
2019-10-28 | Plug Back Performed |
2019-10-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-30 | Perforation Treatment Performed - Cement Plug |
2019-10-30 | Perforation Treatment Performed - Cement Squeeze |
2019-10-30 | Plug Back Performed |
2019-11-02 | Well Log Performed |
2019-11-04 | Perforation Treatment Performed - Jet Perforation |
2019-11-04 | Well Log Performed |
2019-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2019-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-06 | Plug Back Performed |
2019-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-07 | Perforation Treatment Performed - Cement Plug |
2019-11-07 | Perforation Treatment Performed - Remedial Casing |
2019-11-07 | Plug Back Performed |
2019-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-26 | Perforation Treatment Performed - Jet Perforation |
2019-11-26 | Well Log Performed |
2019-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-12-04 | Perforation Treatment Performed - Cement Plug |
2019-12-04 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-02-25 | Perforation | 850.00 | 850.50 | 13 |
2000-06-22 | Perforation | 683.00 | 687.00 | 13 |
2001-01-28 | Packing Device Capped w/Cement | 668.00 | 676.00 | 0 |
2001-01-28 | Perforation | 635.00 | 640.00 | 13 |
2001-01-28 | Perforation | 629.00 | 632.00 | 13 |
2004-05-29 | Fracture | 629.00 | 632.00 | 0 |
2005-02-17 | Packing Device Capped w/Cement | 617.00 | 625.00 | 0 |
2005-02-17 | Perforation | 489.00 | 493.00 | 17 |
2005-03-03 | Fracture | 489.00 | 493.00 | 0 |
2017-01-19 | Packing Device Capped w/Cement | 472.00 | 480.00 | 0 |
2018-10-21 | Perforation | 489.00 | 493.00 | 17 |
1996-08-18 | Perforation | 844.50 | 845.50 | 13 |
2018-10-22 | Perforation | 629.00 | 632.00 | 13 |
2018-10-25 | Remedial Casing Cementing | 629.00 | 632.00 | 0 |
2018-10-25 | Cement Plug | 623.00 | 632.00 | 0 |
2018-10-25 | Packing Device Capped w/Cement | 603.00 | 622.50 | 0 |
2018-10-27 | Remedial Casing Cementing | 489.00 | 493.00 | 0 |
2018-10-27 | Cement Plug | 480.50 | 493.00 | 0 |
2018-10-27 | Packing Device Capped w/Cement | 470.00 | 480.00 | 0 |
2018-10-30 | Perforation | 425.00 | 427.00 | 1 |
2018-11-05 | Perforation | 424.00 | 427.00 | 20 |
2018-11-05 | Perforation | 424.00 | 427.00 | 17 |
1996-10-08 | Perforation | 837.00 | 838.00 | 13 |
2018-11-07 | Remedial Casing Cementing | 424.00 | 427.00 | 0 |
2018-11-07 | Packing Device Capped w/Cement | 411.30 | 420.30 | 0 |
2018-11-07 | Cement Plug | 420.70 | 427.00 | 0 |
2019-10-05 | Perforation | 424.00 | 427.00 | 20 |
2019-10-06 | Perforation | 489.00 | 493.00 | 17 |
2019-10-06 | Perforation | 629.00 | 632.00 | 13 |
2019-10-07 | Perforation | 635.00 | 640.00 | 13 |
2019-10-07 | Perforation | 683.00 | 687.00 | 13 |
2019-10-10 | Perforation | 807.00 | 807.50 | 13 |
2019-10-10 | Perforation | 784.00 | 787.00 | 13 |
1996-10-08 | Perforation | 838.00 | 838.50 | 13 |
2019-10-10 | Perforation | 850.00 | 850.50 | 13 |
2019-10-10 | Perforation | 837.00 | 838.00 | 13 |
2019-10-10 | Perforation | 838.00 | 838.50 | 13 |
2019-10-10 | Perforation | 844.50 | 845.50 | 13 |
2019-10-11 | Perforation | 836.00 | 838.00 | 20 |
2019-10-21 | Cement Squeeze | 838.00 | 850.50 | 0 |
2019-10-21 | Cement Plug | 830.40 | 851.00 | 0 |
2019-10-21 | Remedial Casing Cementing | 836.00 | 838.00 | 0 |
2019-10-21 | Packing Device Capped w/Cement | 820.50 | 830.00 | 0 |
2019-10-23 | Acid Treatment | 784.00 | 787.00 | 0 |
1997-02-09 | Perforation | 807.00 | 807.50 | 13 |
2019-10-24 | Packing Device Capped w/Cement | 789.00 | 797.00 | 0 |
2019-10-28 | Cement Squeeze | 784.00 | 787.00 | 0 |
2019-10-28 | Cement Plug | 780.00 | 787.50 | 0 |
2019-10-28 | Packing Device Capped w/Cement | 771.00 | 780.00 | 0 |
2019-10-30 | Packing Device Capped w/Cement | 649.00 | 678.00 | 0 |
2019-10-30 | Cement Squeeze | 683.00 | 687.00 | 0 |
2019-10-30 | Cement Plug | 678.00 | 687.50 | 0 |
2019-11-04 | Perforation | 574.00 | 576.00 | 26 |
2019-11-05 | Acid Treatment | 574.00 | 576.00 | 0 |
2019-11-06 | Packing Device Capped w/Cement | 617.00 | 625.00 | 0 |
1997-11-04 | Perforation | 784.00 | 787.00 | 13 |
2019-11-07 | Packing Device Capped w/Cement | 560.00 | 570.00 | 0 |
2019-11-07 | Cement Plug | 570.00 | 577.00 | 0 |
2019-11-07 | Remedial Casing Cementing | 574.00 | 576.00 | 0 |
2019-11-26 | Packing Device Capped w/Cement | 471.00 | 479.00 | 0 |
2019-11-26 | Perforation | 345.00 | 348.00 | 20 |
2019-11-26 | Packing Device Capped w/Cement | 405.00 | 413.00 | 0 |
2019-12-04 | Packing Device Capped w/Cement | 333.00 | 341.00 | 0 |
2019-12-04 | Cement Plug | 341.00 | 349.00 | 0 |
2019-12-04 | Remedial Casing Cementing | 345.00 | 348.00 | 0 |
1998-05-26 | Packing Device Capped w/Cement | 828.00 | 836.00 | 0 |
2000-06-22 | Packing Device Capped w/Cement | 794.00 | 802.00 | 0 |
2000-06-22 | Packing Device Capped w/Cement | 771.00 | 779.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 5508 | 0.0 | 0.0 | 0.0 |
2002 | 3014 | 0.0 | 0.0 | 0.0 |
2003 | 3229 | 0.0 | 0.0 | 0.0 |
2004 | 734 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-20 | No Incident Encountered | 0.00 | 0.00 |
2018-11-07 | No Incident Encountered | 0.00 | 0.00 |
2019-12-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]