X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624241301000

Well Details

Well ID: 0624241301000
Loading map...
Location: 00/01-13-062-24W4/0
Location Alias: 00/01-13-62-24 W4M
Location Alias 2: 00/01-13-062-24 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 24
Section: 13
County/Municipality: Athabasca County
Well Name: CNRES ROCHESTER 1-13-62-24
Operator Name: Canadian Natural Resources Limited
License Number: 0188194
License Date: 1996-05-30
License Status: RecCertified
Spud Date: 1996-06-01
Final Drill Date: 1996-06-05
Well Total Depth: 828.50 m
Surface Hole Latitude: 54.358310
Surface Hole Longitude: -113.452644

For data sources see[1][2]

Well History

Date Event
1996-05-30 Obtained License
1996-06-01 Well Log Performed
1996-06-02 Surface Casing Operation Performed
1996-06-03 Direction Drilling Operation Performed - Deviate
1996-06-05 Finished Drilling
1996-06-05 Well Log Performed
1996-06-05 Well Mode changed to Drilled and Cased
1996-06-07 Production Casing Operation Performed
1996-06-07 Rig Released
1996-06-08 Well Log Performed
1996-06-09 Well Log Performed
1996-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-10 Perforation Treatment Performed - Jet Perforation
1996-06-10 Well Log Performed
1996-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-11 Perforation Treatment Performed - Jet Perforation
1996-06-11 Plug Back Performed
1996-06-11 Well Log Performed
1996-06-13 Perforation Treatment Performed - Jet Perforation
1996-06-13 Perforation Treatment Performed - Remedial Casing
1996-06-15 Perforation Treatment Performed - Jet Perforation
1996-06-15 Well Log Performed
1996-06-19 Well Log Performed
1996-08-08 Well Began Production
1996-08-08 Well Fluid changed to Gas
1996-08-08 Well Mode changed to Flowing
1997-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-22 Plug Back Performed
1997-06-22 Well Fluid changed to Gas
1997-06-22 Well Log Performed
1997-06-22 Well Mode changed to Abandoned Zone
1997-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-23 Perforation Treatment Performed - Jet Perforation
1997-06-23 Plug Back Performed
1997-06-23 Well Log Performed
1998-07-22 Well Log Performed
1998-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-23 Perforation Treatment Performed - Cement Plug
1998-07-23 Perforation Treatment Performed - Cement Squeeze
1998-07-23 Plug Back Performed
1998-09-29 Well Log Performed
1998-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-30 Perforation Treatment Performed - Jet Perforation
1998-09-30 Perforation Treatment Performed - Remedial Casing
1998-09-30 Well Log Performed
1998-10-07 Perforation Treatment Performed - Cement Plug
1998-10-07 Perforation Treatment Performed - Jet Perforation
1998-10-07 Perforation Treatment Performed - Remedial Casing
1998-10-07 Well Log Performed
2000-07-26 Perforation Treatment Performed - Jet Perforation
2000-07-26 Well Log Performed
2000-07-27 Perforation Treatment Performed - Remedial Casing
2000-08-03 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-03 302.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-10 Perforation 820.50 822.00 13
1997-06-22 Packing Device Capped w/Cement 782.00 790.00 0
1997-06-23 Packing Device Capped w/Cement 732.00 740.00 0
1997-06-23 Perforation 627.50 629.00 13
1997-06-23 Perforation 583.50 585.00 13
1998-07-23 Acid Treatment 583.50 585.00 0
1998-07-23 Cement Squeeze 583.50 585.00 0
1998-07-23 Cement Plug 582.50 600.00 0
1998-09-30 Perforation 377.00 377.30 14
1998-09-30 Perforation 425.00 425.30 14
1998-09-30 Acid Treatment 425.00 425.30 0
1996-06-10 Perforation 824.00 826.00 13
1998-09-30 Remedial Casing Cementing 425.00 425.30 0
1998-09-30 Packing Device Capped w/Cement 418.50 424.50 0
1998-10-07 Perforation 398.00 399.00 14
1998-10-07 Remedial Casing Cementing 398.00 399.00 0
1998-10-07 Remedial Casing Cementing 377.00 377.30 0
1998-10-07 Cement Plug 343.00 377.90 0
2000-07-26 Perforation 272.00 275.00 17
2000-07-27 Remedial Casing Cementing 272.00 275.00 0
1996-06-10 Acid Treatment 820.50 826.00 0
1996-06-11 Packing Device Capped w/Cement 810.00 818.00 0
1996-06-11 Perforation 798.00 799.00 13
1996-06-11 Perforation 800.00 801.50 13
1996-06-13 Perforation 375.00 376.00 13
1996-06-13 Remedial Casing Cementing 375.00 376.00 0
1996-06-15 Perforation 745.00 746.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3558 0.0 0.0 0.0
1997 3965 0.0 0.0 0.0

For data sources see[6]

References