X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625113212000

Well Details

Well ID: 0625113212000
Loading map...
Location: 00/12-32-062-11W5/0
Location Alias: 00/12-32-62-11 W5M
Location Alias 2: 00/12-32-062-11 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 11
Section: 32
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCKS 12-32-62-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0043549
License Date: 1972-09-14
License Status: Suspension
Spud Date: 1972-10-02
Final Drill Date: 1972-10-21
Well Total Depth: 2773.70 m
Surface Hole Latitude: 54.408267
Surface Hole Longitude: -115.624110

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-09-14 Obtained License
1972-10-21 Finished Drilling
1972-10-21 Well Mode changed to Drilled and Cased
1972-10-24 Drill Stem Test Performed
1972-10-25 Drill Stem Test Performed
1972-10-29 Production Casing Operation Performed
1972-11-25 Perforation Treatment Performed - Jet Perforation
1972-11-25 Well Began Production
1972-11-25 Well Fluid changed to Crude Oil
1972-11-25 Well Mode changed to Flowing
1980-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-19 Well Fluid changed to Crude Oil
1983-08-19 Well Mode changed to Pumping
1989-03-01 Well Log Performed
1989-03-02 Perforation Treatment Performed - Jet Perforation
1989-03-02 Well Log Performed
1989-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-06 Plug Back Performed
2012-01-06 Well Log Performed
2013-05-31 Well Fluid changed to Crude Oil
2013-05-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-11-25 Perforation 2738.00 2743.80 7
1972-11-25 Perforation 2728.00 2734.10 7
1980-11-05 Acid Treatment 2728.00 2743.80 0
1989-03-02 Perforation 2738.00 2743.80 13
1989-03-02 Perforation 2749.50 2751.30 13
1989-03-06 Acid Treatment 2738.00 2743.80 0
1989-03-10 Acid Treatment 2749.50 2751.30 0
2012-01-06 Packing Device Capped w/Cement 2708.00 2716.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 258 0.0 0.0 0.0
1973 5104 0.0 0.0 0.0
1974 2808 0.0 0.0 0.0
1975 5280 0.0 0.0 0.0
1976 5295 0.0 0.0 0.0
1977 4158 0.0 0.0 0.0
1978 6862 0.0 0.0 0.0
1979 6501 0.0 0.0 0.0
1980 6770 0.0 0.0 0.0
1981 2586 0.0 0.0 0.0
1982 944 0.0 0.0 0.0
1983 1494 0.0 0.0 0.0
1984 6508 0.0 0.0 0.0
1985 7883 0.0 0.0 0.0
1986 8402 0.0 0.0 0.0
1987 8300 0.0 0.0 0.0
1988 8391 0.0 0.0 0.0
1989 7758 0.0 0.0 0.0
1990 8302 0.0 0.0 0.0
1991 5185 0.0 0.0 0.0
1992 8070 0.0 0.0 0.0
1993 8638 0.0 0.0 0.0
1994 7879 0.0 0.0 0.0
1995 8220 0.0 0.0 0.0
1996 5669 0.0 0.0 0.0
1997 8183 0.0 0.0 0.0
1998 8218 0.0 0.0 0.0
1999 7493 0.0 0.0 0.0
2000 6835 0.0 0.0 0.0
2001 7166 0.0 0.0 0.0
2002 8016 0.0 0.0 0.0
2003 7660 0.0 0.0 0.0
2004 7386 0.0 0.0 0.0
2005 5842 0.0 0.0 0.0
2006 7673 0.0 0.0 0.0
2007 7909 0.0 0.0 0.0
2008 7753 0.0 0.0 0.0
2009 8706 0.0 0.0 0.0
2010 8497 0.0 0.0 0.0
2011 1780 0.0 0.0 0.0

For data sources see[5]

References