X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625113303000

Well Details

Well ID: 0625113303000
Loading map...
Location: 00/03-33-062-11W5/0
Location Alias: 00/03-33-62-11 W5M
Location Alias 2: 00/03-33-062-11 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 11
Section: 33
County/Municipality: Woodlands County
Well Name: PRODECO ET AL JUDY CREEK 3-33-62-11
Operator Name: Prodeco Oil & Gas Co. Ltd.
License Number: 0111077
License Date: 1984-11-27
License Status: Re-Entered
Spud Date: 1984-12-09
Final Drill Date: 1985-01-05
Well Total Depth: 2850.00 m
Surface Hole Latitude: 54.402819
Surface Hole Longitude: -115.595000

For data sources see[1][2]

Well History

Date Event
1984-11-27 Obtained License
1984-12-09 Lost Circulation Occurred
1984-12-11 Surface Casing Operation Performed
1985-01-05 Finished Drilling
1985-01-05 Well Log Performed
1985-01-06 Well Log Performed
1985-01-08 Drill Stem Test Performed
1985-01-12 Drill Stem Test Performed
1985-01-15 Production Casing Operation Performed
1985-01-15 Rig Released
1985-02-02 Well Log Performed
1985-02-04 Perforation Treatment Performed - Jet Perforation
1985-02-04 Well Log Performed
1985-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-02-07 Plug Back Performed
1985-02-07 Well Log Performed
1985-02-08 Perforation Treatment Performed - Jet Perforation
1985-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-02-11 Plug Back Performed
1985-02-11 Well Log Performed
1985-02-12 Perforation Treatment Performed - Jet Perforation
1985-02-12 Well Log Performed
1985-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-02-14 Plug Back Performed
1985-02-14 Well Log Performed
1985-02-14 Well Mode changed to Abandoned and Re-entered
1985-02-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-04 Perforation 2760.50 2764.50 13
1985-02-07 Packing Device Capped w/Cement 2747.00 2755.00 0
1985-02-08 Perforation 2731.00 2735.00 13
1985-02-11 Packing Device Capped w/Cement 2718.00 2726.00 0
1985-02-12 Perforation 1792.50 1796.50 13
1985-02-14 Packing Device Capped w/Cement 1779.00 1787.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-12-09 Lost Circulation 119.00 224.00

For data sources see[5]

References