X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625120116002

Well Details

Well ID: 0625120116002
Loading map...
Location: 00/16-01-062-12W5/2
Location Alias: 00/16-01-62-12 W5M
Location Alias 2: 00/16-01-062-12 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 12
Section: 01
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 16-1-62-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0018282
License Date: 1959-12-10
License Status: Issued
Spud Date: 1959-12-16
Final Drill Date: 1960-02-06
Well Total Depth: 2760.00 m
Surface Hole Latitude: 54.339602
Surface Hole Longitude: -115.654713

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-10 Obtained License
1960-02-06 Finished Drilling
1960-02-06 Well Mode changed to Drilled and Cased
1960-02-11 Drill Stem Test Performed
1960-02-12 Drill Stem Test Performed
1960-02-14 Production Casing Operation Performed
1960-03-13 Perforation Treatment Performed - Jet Perforation
1960-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-06 Well Log Performed
1978-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-04 Perforation Treatment Performed - Jet Perforation
1978-07-04 Well Log Performed
1978-07-05 Well Log Performed
1979-07-06 Perforation Treatment Performed - Jet Perforation
1979-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-29 Well Log Performed
1984-11-01 Well Log Performed
1985-02-20 Well Log Performed
1985-02-23 Perforation Treatment Performed - Jet Perforation
1985-02-23 Well Log Performed
1985-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-03 Well Log Performed
1985-03-08 Well Began Production
1985-03-08 Well Fluid changed to Crude Oil
1985-03-08 Well Mode changed to Flowing
1988-09-18 Well Log Performed
1988-09-19 Well Structure changed to Commingled
1995-06-01 Well Log Performed
1995-06-08 Perforation Treatment Performed - Cement Squeeze
1995-06-12 Perforation Treatment Performed - Jet Perforation
1995-06-12 Well Log Performed
1995-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-18 Perforation Treatment Performed - Jet Perforation
2001-12-18 Well Log Performed
2001-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-23 Well Log Performed
2016-11-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-13 Perforation 2694.40 2699.30 13
1979-07-06 Perforation 2686.50 2688.00 13
1979-07-06 Perforation 2683.70 2684.70 13
1979-07-06 Perforation 2681.00 2682.50 13
1979-07-07 Acid Treatment 2681.00 2692.00 0
1985-02-23 Perforation 2672.20 2675.00 13
1985-02-28 Acid Treatment 2672.20 2675.00 0
1995-06-08 Cement Squeeze 2686.50 2692.00 0
1995-06-12 Perforation 2689.30 2692.00 13
1995-06-13 Acid Treatment 2689.30 2692.00 0
2001-12-18 Perforation 2728.30 2731.30 16
1960-03-13 Perforation 2700.80 2703.60 13
2001-12-18 Perforation 2732.80 2737.10 16
2001-12-18 Perforation 2724.30 2726.70 16
2001-12-18 Perforation 2706.90 2722.50 16
2001-12-18 Perforation 2699.30 2704.40 16
2001-12-18 Perforation 2692.00 2693.50 16
2001-12-18 Perforation 2686.20 2689.30 16
2001-12-18 Perforation 2679.80 2684.70 16
2001-12-18 Perforation 2674.90 2677.40 16
2001-12-19 Acid Treatment 2728.30 2731.30 0
2001-12-19 Acid Treatment 2724.30 2726.70 0
1960-03-13 Perforation 2710.00 2712.40 13
2001-12-19 Acid Treatment 2706.90 2722.50 0
2001-12-19 Acid Treatment 2701.10 2704.40 0
2001-12-19 Acid Treatment 2694.40 2699.30 0
2001-12-19 Acid Treatment 2686.20 2693.50 0
2001-12-19 Acid Treatment 2679.80 2684.70 0
2001-12-19 Acid Treatment 2672.20 2677.40 0
2001-12-19 Acid Treatment 2689.60 2691.60 0
2001-12-19 Acid Treatment 2672.50 2674.50 0
1960-03-13 Perforation 2714.20 2720.60 13
1960-03-15 Acid Treatment 2694.40 2720.60 0
1978-05-06 Acid Treatment 2694.40 2720.60 0
1978-07-04 Perforation 2701.10 2703.60 13
1978-07-04 Perforation 2695.00 2698.10 13
1979-07-06 Perforation 2689.30 2692.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 5980 0.0 0.0 0.0
1986 4482 0.0 0.0 0.0
1987 8243 0.0 0.0 0.0
1988 5592 0.0 0.0 0.0

For data sources see[5]

References