X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625120216002

Well Details

Well ID: 0625120216002
Loading map...
Location: 00/16-02-062-12W5/2
Location Alias: 00/16-02-62-12 W5M
Location Alias 2: 00/16-02-062-12 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 12
Section: 02
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 16-2-62-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0021600
License Date: 1961-10-27
License Status: Issued
Spud Date: 1961-12-07
Final Drill Date: 1962-01-31
Well Total Depth: 2718.80 m
Surface Hole Latitude: 54.339574
Surface Hole Longitude: -115.679636

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-27 Obtained License
1962-01-31 Finished Drilling
1962-01-31 Well Mode changed to Drilled and Cased
1962-02-02 Production Casing Operation Performed
1962-02-04 Perforation Treatment Performed - Jet Perforation
1962-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-09 Perforation Treatment Performed - Jet Perforation
1962-03-17 Well Began Production
1962-03-17 Well Fluid changed to Crude Oil
1962-03-17 Well Mode changed to Flowing
1962-09-07 Perforation Treatment Performed - Cement Squeeze
1962-09-10 Perforation Treatment Performed - Jet Perforation
1962-09-13 Perforation Treatment Performed - Acid Wash - No Pressure
1962-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-14 Perforation Treatment Performed - Cement Squeeze
1975-08-17 Perforation Treatment Performed - Jet Perforation
1975-08-17 Well Fluid changed to Crude Oil
1975-08-17 Well Mode changed to Flowing
1975-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-31 Perforation Treatment Performed - Jet Perforation
1986-10-31 Well Fluid changed to Crude Oil
1986-10-31 Well Log Performed
1986-10-31 Well Mode changed to Suspended
1986-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-28 Perforation Treatment Performed - Fractured
1987-04-02 Perforation Treatment Performed - Jet Perforation
1987-04-02 Well Log Performed
1987-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-31 Perforation Treatment Performed - Chemical Squeeze
1990-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-12 Perforation Treatment Performed - Chemical Squeeze
1993-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-21 Well Fluid changed to Crude Oil
1993-07-21 Well Mode changed to Pumping
1994-11-16 Well Log Performed
1994-11-17 Perforation Treatment Performed - Jet Perforation
1994-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-23 Well Log Performed
1995-08-12 Perforation Treatment Performed - Cement Squeeze
1995-08-15 Perforation Treatment Performed - Jet Perforation
1995-08-15 Well Log Performed
1995-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-24 Perforation Treatment Performed - Cement Squeeze
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Suspended
1999-12-13 Perforation Treatment Performed - Jet Perforation
1999-12-13 Well Log Performed
1999-12-14 Perforation Treatment Performed - Jet Perforation
1999-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-20 Well Log Performed
2007-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-23 Well Log Performed
2016-12-03 Well Log Performed
2016-12-07 Perforation Treatment Performed - Jet Perforation
2016-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-02-04 Perforation 2642.30 2644.70 7
1962-09-14 Acid Treatment 2658.50 2660.90 0
1975-08-14 Cement Squeeze 2642.30 2670.70 0
1975-08-17 Perforation 2636.20 2636.80 20
1975-08-18 Acid Treatment 2636.20 2636.80 0
1986-10-31 Perforation 2665.80 2667.60 13
1986-10-31 Perforation 2669.50 2670.70 13
1986-10-31 Perforation 2683.70 2687.40 13
1986-10-31 Perforation 2689.00 2693.00 13
1986-11-01 Acid Treatment 2665.80 2693.00 0
1987-01-28 Fracture 2665.80 2693.00 0
1962-02-04 Perforation 2665.80 2667.60 7
1987-04-02 Perforation 2658.50 2660.00 13
1987-04-03 Acid Treatment 2658.50 2660.00 0
1990-08-31 Chemical Squeeze 2658.50 2693.00 0
1990-09-01 Acid Treatment 2658.50 2693.00 0
1993-07-12 Chemical Squeeze 2658.50 2693.00 0
1993-07-16 Acid Treatment 2658.50 2693.00 0
1994-11-17 Perforation 2636.70 2646.70 13
1994-11-18 Acid Treatment 2636.70 2646.70 0
1995-08-12 Cement Squeeze 2636.10 2647.70 0
1995-08-15 Perforation 2646.90 2649.30 13
1962-02-04 Perforation 2669.40 2670.70 7
1995-08-16 Acid Treatment 2642.00 2649.30 0
1995-08-24 Cement Squeeze 2636.10 2645.00 0
1999-12-13 Perforation 2695.80 2698.40 16
1999-12-13 Perforation 2700.20 2701.80 16
1999-12-14 Perforation 2642.60 2646.30 16
1999-12-14 Perforation 2646.80 2649.30 16
1999-12-17 Acid Treatment 2642.60 2701.80 0
2007-03-27 Acid Treatment 2642.60 2701.80 0
2008-08-25 Acid Treatment 2642.60 2701.80 0
2009-08-19 Acid Treatment 2642.60 2701.80 0
1962-02-06 Acid Treatment 2642.30 2670.70 0
2010-05-28 Acid Treatment 2642.60 2701.80 0
2011-08-10 Acid Treatment 2642.60 2701.80 0
2012-03-07 Acid Treatment 2642.60 2701.80 0
2015-10-23 Packing Device Capped w/Cement 2626.80 2627.20 0
2016-12-07 Perforation 2636.10 2641.00 14
2016-12-08 Acid Treatment 2636.10 2701.80 0
1962-03-09 Perforation 2658.80 2660.00 7
1962-09-07 Cement Squeeze 2642.30 2670.70 0
1962-09-10 Perforation 2642.30 2644.70 7
1962-09-10 Perforation 2658.50 2660.90 7
1962-09-13 Acid Wash 2642.30 2644.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 88 0.0 0.0 0.0
1968 48 0.0 0.0 0.0
1970 578 0.0 0.0 0.0
1971 48 0.0 0.0 0.0
1972 888 0.0 0.0 0.0
1973 3034 0.0 0.0 0.0
1974 892 0.0 0.0 0.0
1975 3120 0.0 0.0 0.0
1976 425 0.0 0.0 0.0
1977 48 0.0 0.0 0.0
1978 2261 0.0 0.0 0.0
1979 425 0.0 0.0 0.0
1980 8 0.0 0.0 0.0
1986 425 0.0 0.0 0.0
1993 3752 0.0 0.0 0.0
1994 8175 0.0 0.0 0.0
1995 7022 0.0 0.0 0.0
1996 6962 0.0 0.0 0.0
1997 7796 0.0 0.0 0.0
1998 3638 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-07 No Incident Encountered 0.00 0.00
2015-10-23 No Incident Encountered 0.00 0.00
2016-12-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References