X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625122810000

Well Details

Well ID: 0625122810000
Loading map...
Location: 00/10-28-062-12W5/0
Location Alias: 00/10-28-62-12 W5M
Location Alias 2: 00/10-28-062-12 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 12
Section: 28
County/Municipality: Woodlands County
Well Name: TRI LINK ET AL CARSONN 10-28-62-12
Operator Name: Penn West Canadian Fuel Ltd.
License Number: 0084811
License Date: 1980-08-08
License Status: RecCertified
Spud Date: 1980-09-16
Final Drill Date: 1980-10-17
Well Total Depth: 2654.00 m
Surface Hole Latitude: 54.395966
Surface Hole Longitude: -115.733564

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-08 Obtained License
1980-09-27 Drill Stem Test Performed
1980-10-17 Finished Drilling
1980-10-17 Well Mode changed to Drilled and Cased
1980-10-25 Drill Stem Test Performed
1980-10-27 Drill Stem Test Performed
1980-10-29 Drill Stem Test Performed
1980-11-01 Production Casing Operation Performed
1981-01-23 Perforation Treatment Performed - Jet Perforation
1981-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-27 Well Began Production
1981-01-27 Well Fluid changed to Crude Oil
1981-01-27 Well Mode changed to Pumping
1981-11-06 Perforation Treatment Performed - Jet Perforation
1981-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-15 Well Fluid changed to Crude Oil
1981-11-15 Well Mode changed to Suspended
1990-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-06 Plug Back Performed
1990-02-06 Well Abandoned
1990-02-06 Well Fluid changed to Crude Oil
1990-02-06 Well Log Performed
1990-02-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-23 Perforation 2624.00 2626.00 7
1981-01-23 Perforation 2620.50 2622.50 7
1981-01-23 Perforation 2616.00 2617.50 7
1981-01-23 Perforation 2613.50 2615.50 7
1981-01-26 Acid Treatment 2613.50 2626.00 0
1981-11-06 Perforation 2629.50 2630.50 7
1981-11-06 Perforation 2632.00 2633.50 7
1981-11-08 Acid Treatment 2613.50 2633.50 0
1990-02-06 Packing Device Capped w/Cement 2603.00 2611.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 2176 0.0 0.0 0.0

For data sources see[5]

References