If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625122810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.395966,"lon":-115.733564,"icon":""}]} |
Location: 00/10-28-062-12W5/0 | |
Location Alias: 00/10-28-62-12 W5M | |
Location Alias 2: 00/10-28-062-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 12 | |
Section: 28 | |
County/Municipality: Woodlands County | |
Well Name: TRI LINK ET AL CARSONN 10-28-62-12 | |
Operator Name: Penn West Canadian Fuel Ltd. | |
License Number: 0084811 | |
License Date: 1980-08-08 | |
License Status: RecCertified | |
Spud Date: 1980-09-16 | |
Final Drill Date: 1980-10-17 | |
Well Total Depth: 2654.00 m | |
Surface Hole Latitude: 54.395966 | |
Surface Hole Longitude: -115.733564 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-08 | Obtained License |
1980-09-27 | Drill Stem Test Performed |
1980-10-17 | Finished Drilling |
1980-10-17 | Well Mode changed to Drilled and Cased |
1980-10-25 | Drill Stem Test Performed |
1980-10-27 | Drill Stem Test Performed |
1980-10-29 | Drill Stem Test Performed |
1980-11-01 | Production Casing Operation Performed |
1981-01-23 | Perforation Treatment Performed - Jet Perforation |
1981-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-27 | Well Began Production |
1981-01-27 | Well Fluid changed to Crude Oil |
1981-01-27 | Well Mode changed to Pumping |
1981-11-06 | Perforation Treatment Performed - Jet Perforation |
1981-11-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-11-15 | Well Fluid changed to Crude Oil |
1981-11-15 | Well Mode changed to Suspended |
1990-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-02-06 | Plug Back Performed |
1990-02-06 | Well Abandoned |
1990-02-06 | Well Fluid changed to Crude Oil |
1990-02-06 | Well Log Performed |
1990-02-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-01-23 | Perforation | 2624.00 | 2626.00 | 7 |
1981-01-23 | Perforation | 2620.50 | 2622.50 | 7 |
1981-01-23 | Perforation | 2616.00 | 2617.50 | 7 |
1981-01-23 | Perforation | 2613.50 | 2615.50 | 7 |
1981-01-26 | Acid Treatment | 2613.50 | 2626.00 | 0 |
1981-11-06 | Perforation | 2629.50 | 2630.50 | 7 |
1981-11-06 | Perforation | 2632.00 | 2633.50 | 7 |
1981-11-08 | Acid Treatment | 2613.50 | 2633.50 | 0 |
1990-02-06 | Packing Device Capped w/Cement | 2603.00 | 2611.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[5]