X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625191710002

Well Details

Well ID: 0625191710002
Loading map...
Location: 00/10-17-062-19W5/2
Location Alias: 00/10-17-62-19 W5M
Location Alias 2: 00/10-17-062-19 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOBS 10-17-62-19
Operator Name: Paramount Resources Ltd.
License Number: 0038566
License Date: 1970-08-13
License Status: Issued
Spud Date: 1970-08-22
Final Drill Date: 1970-09-13
Well Total Depth: 2127.50 m
Surface Hole Latitude: 54.365941
Surface Hole Longitude: -116.809194

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-08-13 Obtained License
1970-08-28 Drill Stem Test Performed
1970-08-29 Drill Stem Test Performed
1970-09-03 Drill Stem Test Performed
1970-09-04 Drill Stem Test Performed
1970-09-13 Finished Drilling
1970-09-13 Well Log Performed
1970-09-13 Well Mode changed to Drilled and Cased
1970-09-16 Drill Stem Test Performed
1970-09-17 Production Casing Operation Performed
1970-11-17 Perforation Treatment Performed - Jet Perforation
1970-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-23 Perforation Treatment Performed - Jet Perforation
1986-01-10 Well Log Performed
1986-01-11 Perforation Treatment Performed - Jet Perforation
1986-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-12 Well Log Performed
1987-01-21 Well Log Performed
1987-01-26 Well Log Performed
1987-01-27 Perforation Treatment Performed - Jet Perforation
1987-01-30 Well Log Performed
1987-02-06 Perforation Treatment Performed - Jet Perforation
1987-02-06 Well Log Performed
1987-02-07 Perforation Treatment Performed - Cement Squeeze
1987-02-10 Perforation Treatment Performed - Jet Perforation
1987-02-10 Well Log Performed
1987-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-13 Well Log Performed
1987-02-25 Well Log Performed
1987-02-27 Well Log Performed
1987-03-04 Well Log Performed
1987-03-06 Perforation Treatment Performed - Cement Squeeze
1987-03-06 Well Log Performed
1989-04-06 Well Log Performed
1989-04-08 Perforation Treatment Performed - Cement Squeeze
1989-04-11 Well Log Performed
1989-04-12 Perforation Treatment Performed - Jet Perforation
1989-04-12 Well Log Performed
1989-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-04-13 Perforation Treatment Performed - Jet Perforation
1990-12-17 Perforation Treatment Performed - Jet Perforation
1991-04-15 Well Began Production
1991-04-15 Well Fluid changed to Gas
1991-04-15 Well Mode changed to Flowing
1992-11-10 Well Log Performed
2000-04-03 Well Log Performed
2000-04-06 Perforation Treatment Performed - Jet Perforation
2000-04-08 Perforation Treatment Performed - Remedial Casing
2000-04-16 Perforation Treatment Performed - Remedial Casing
2000-04-20 Perforation Treatment Performed - Jet Perforation
2000-05-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-11-17 Perforation 2074.50 2078.70 7
1987-02-07 Cement Squeeze 2061.70 2098.00 0
1987-02-10 Perforation 2062.00 2076.00 13
1987-02-12 Acid Treatment 2062.00 2076.00 0
1987-03-06 Cement Squeeze 2071.00 2076.00 0
1989-04-08 Cement Squeeze 2062.00 2071.00 0
1989-04-12 Perforation 2061.00 2071.00 13
1989-04-13 Perforation 2079.00 2081.00 13
1989-04-13 Packing Device Capped w/Cement 2049.00 2059.00 0
1990-12-17 Perforation 1965.40 1973.90 20
2000-04-06 Perforation 1998.50 1998.80 72
1970-11-18 Acid Treatment 2074.50 2078.70 0
2000-04-08 Remedial Casing Cementing 1998.50 1998.80 0
2000-04-16 Remedial Casing Cementing 650.00 660.00 0
2000-04-20 Perforation 1965.40 1973.90 13
2000-04-20 Perforation 1975.10 1980.00 13
2000-05-06 Fracture 1965.40 1973.90 0
2000-05-06 Fracture 1975.10 1980.00 0
1975-10-23 Perforation 2068.70 2074.80 7
1975-10-23 Acid Treatment 2068.70 2078.70 0
1986-01-11 Perforation 2061.70 2069.70 13
1986-01-11 Perforation 2074.50 2078.40 13
1986-01-12 Acid Treatment 2061.70 2078.70 0
1987-01-27 Perforation 2106.00 2107.00 13
1987-02-06 Perforation 2097.00 2098.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1848 0.0 0.0 0.0
1992 7560 0.0 0.0 0.0
1993 8362 0.0 0.0 0.0
1994 8158 0.0 0.0 0.0
1995 8674 0.0 0.0 0.0
1996 8496 0.0 0.0 0.0
1997 4085 0.0 0.0 0.0
2000 5527 0.0 0.0 0.0
2001 8515 0.0 0.0 0.0
2002 8758 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 8731 0.0 0.0 0.0
2005 8736 0.0 0.0 0.0
2006 8732 0.0 0.0 0.0
2007 8669 0.0 0.0 0.0
2008 8327 0.0 0.0 0.0
2009 8020 0.0 0.0 0.0
2010 8740 0.0 0.0 0.0
2011 8750 0.0 0.0 0.0
2012 8779 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 7619 0.0 0.0 0.0
2015 8693 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8159 0.0 0.0 0.0
2018 6235 0.0 0.0 0.0
2019 6575 0.0 0.0 0.0
2020 1 0.0 0.0 0.0

For data sources see[5]

References