X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201101000

Well Details

Well ID: 0625201101000
Loading map...
Location: 00/01-11-062-20W5/0
Location Alias: 00/01-11-62-20 W5M
Location Alias 2: 00/01-11-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 11-14A KAYBOBS 1-11-62-20
Operator Name: Murphy Oil Company Ltd.
License Number: 0486011
License Date: 2017-10-25
License Status: Issued
Spud Date: 2017-12-07
Final Drill Date: 2018-01-19
Well Total Depth: 5815.00 m
Surface Hole Latitude: 54.364560
Surface Hole Longitude: -116.889231

For data sources see[1][2]

Well History

Date Event
2017-10-25 Obtained License
2018-01-07 Direction Drilling Operation Performed - Deviate
2018-01-08 Surface Casing Operation Performed
2018-01-10 Intermediate Casing Operation Performed
2018-01-15 Direction Drilling Operation Performed - Horizontal
2018-01-18 Well Log Performed
2018-01-19 Finished Drilling
2018-01-19 Well Log Performed
2018-01-19 Well Mode changed to Drilled and Cased
2018-01-20 Production Casing Operation Performed
2018-01-22 Rig Released
2018-04-20 Perforation Treatment Performed - Jet Perforation
2018-04-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-29 Perforation Treatment Performed - Jet Perforation
2018-04-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-30 Perforation Treatment Performed - Jet Perforation
2018-04-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-01 Perforation Treatment Performed - Jet Perforation
2018-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-02 Perforation Treatment Performed - Jet Perforation
2018-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-03 Perforation Treatment Performed - Jet Perforation
2018-05-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-13 Perforation Treatment Performed - Jet Perforation
2018-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-14 Perforation Treatment Performed - Jet Perforation
2018-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-15 Perforation Treatment Performed - Jet Perforation
2018-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-16 Perforation Treatment Performed - Jet Perforation
2018-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-17 Perforation Treatment Performed - Jet Perforation
2018-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-18 Perforation Treatment Performed - Jet Perforation
2018-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-19 Perforation Treatment Performed - Jet Perforation
2018-05-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-26 Well Began Production
2018-08-26 Well Fluid changed to Gas
2018-08-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-06 Precision Drilling Corporation 547 N/A Drill To LD
2017-12-07 Precision Drilling Corporation 547 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-07 718.70 Deviate (5 - 79 degrees)
2018-01-15 3387.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-20 Perforation 5682.50 5682.70 3
2018-04-29 Perforation 5582.50 5583.00 3
2018-05-16 Perforation 4582.50 4583.00 2
2018-05-16 Perforation 4595.00 4595.50 2
2018-05-16 Perforation 4607.50 4608.00 2
2018-05-16 Perforation 4620.00 4620.50 2
2018-05-16 Perforation 4632.50 4633.00 3
2018-05-16 Perforation 4654.00 4654.50 3
2018-05-16 Perforation 4657.50 4658.00 3
2018-05-16 Perforation 4670.00 4670.50 3
2018-05-16 Multi-Stage Fracture 4582.50 4670.50 0
2018-05-16 Perforation 4482.50 4483.00 2
2018-04-29 Perforation 5595.00 5595.50 3
2018-05-16 Perforation 4495.00 4495.50 2
2018-05-16 Perforation 4507.50 4508.00 2
2018-05-16 Perforation 4520.00 4520.50 2
2018-05-16 Perforation 4532.50 4533.00 3
2018-05-16 Perforation 4545.00 4545.50 3
2018-05-16 Perforation 4557.50 4558.00 3
2018-05-16 Perforation 4570.00 4570.50 3
2018-05-16 Multi-Stage Fracture 4482.50 4570.50 0
2018-05-17 Perforation 4382.50 4383.00 2
2018-05-17 Perforation 4395.00 4395.50 2
2018-04-29 Perforation 5607.50 5608.00 3
2018-05-17 Perforation 4407.50 4408.00 2
2018-05-17 Perforation 4420.00 4420.50 2
2018-05-17 Perforation 4432.50 4433.00 3
2018-05-17 Perforation 4445.00 4445.50 3
2018-05-17 Perforation 4457.50 4458.00 3
2018-05-17 Perforation 4470.00 4470.50 3
2018-05-17 Multi-Stage Fracture 4382.50 4470.50 0
2018-05-17 Perforation 4282.50 4283.00 2
2018-05-17 Perforation 4295.00 4295.50 2
2018-05-17 Perforation 4307.50 4308.00 2
2018-04-29 Perforation 5620.00 5620.50 3
2018-05-17 Perforation 4320.00 4320.50 2
2018-05-17 Perforation 4332.50 4333.00 3
2018-05-17 Perforation 4345.00 4345.50 3
2018-05-17 Perforation 4357.50 4358.00 3
2018-05-17 Perforation 4370.00 4370.50 3
2018-05-17 Multi-Stage Fracture 4282.50 4370.50 0
2018-05-17 Perforation 4182.50 4183.00 2
2018-05-17 Perforation 4195.00 4195.50 2
2018-05-17 Perforation 4207.50 4208.00 2
2018-05-17 Perforation 4220.00 4220.50 2
2018-04-29 Perforation 5632.50 5633.00 3
2018-05-17 Perforation 4232.50 4233.00 3
2018-05-17 Perforation 4245.00 4245.50 3
2018-05-17 Perforation 4257.50 4258.00 3
2018-05-17 Perforation 4270.00 4270.50 3
2018-05-17 Multi-Stage Fracture 4182.50 4270.50 0
2018-05-17 Perforation 4082.50 4083.00 2
2018-05-17 Perforation 4095.00 4095.50 2
2018-05-17 Perforation 4107.50 4108.00 2
2018-05-17 Perforation 4120.00 4120.50 2
2018-05-17 Perforation 4132.50 4133.00 3
2018-04-29 Perforation 5645.00 5645.50 3
2018-05-17 Perforation 4145.00 4145.50 3
2018-05-17 Perforation 4157.50 4158.00 3
2018-05-17 Perforation 4170.00 4170.50 3
2018-05-17 Multi-Stage Fracture 4082.50 4170.50 0
2018-05-18 Perforation 3982.50 3983.00 2
2018-05-18 Perforation 3995.00 3995.50 2
2018-05-18 Perforation 4007.50 4008.00 2
2018-05-18 Perforation 4020.00 4020.50 2
2018-05-18 Perforation 4032.50 4033.00 3
2018-05-18 Perforation 4045.00 4045.50 3
2018-04-29 Perforation 5657.50 5658.00 3
2018-05-18 Perforation 4057.50 4058.00 3
2018-05-18 Perforation 4070.00 4070.50 3
2018-05-18 Multi-Stage Fracture 3982.50 4070.50 0
2018-05-18 Perforation 3882.50 3883.00 2
2018-05-18 Perforation 3895.00 3895.50 2
2018-05-18 Perforation 3907.50 3908.00 2
2018-05-18 Perforation 3920.00 3920.50 2
2018-05-18 Perforation 3932.50 3933.00 3
2018-05-18 Perforation 3945.00 3945.50 3
2018-05-18 Perforation 3957.50 3958.00 3
2018-04-29 Perforation 5670.00 5670.50 3
2018-05-18 Perforation 3970.00 3970.50 3
2018-05-18 Multi-Stage Fracture 3882.50 3970.50 0
2018-05-18 Perforation 3782.50 3783.00 2
2018-05-18 Perforation 3795.00 3795.50 2
2018-05-18 Perforation 3807.50 3808.00 2
2018-05-18 Perforation 3820.00 3820.50 2
2018-05-18 Perforation 3832.50 3833.00 3
2018-05-18 Perforation 3845.00 3845.50 3
2018-05-18 Perforation 3857.50 3858.00 3
2018-05-18 Perforation 3870.00 3870.50 3
2018-04-29 Multi-Stage Fracture 5582.50 5670.50 0
2018-05-18 Multi-Stage Fracture 3782.50 3870.50 0
2018-05-19 Perforation 3682.50 3683.00 2
2018-05-19 Perforation 3695.00 3695.50 2
2018-05-19 Perforation 3707.50 3708.00 2
2018-05-19 Perforation 3720.00 3720.50 2
2018-05-19 Perforation 3732.50 3773.00 3
2018-05-19 Perforation 3745.00 3745.50 3
2018-05-19 Perforation 3757.50 3758.00 3
2018-05-19 Perforation 3770.00 3770.50 3
2018-05-19 Multi-Stage Fracture 3682.50 3770.50 0
2018-04-30 Perforation 5482.50 5483.00 3
2018-05-19 Perforation 3582.50 3583.00 2
2018-05-19 Perforation 3595.00 3595.50 2
2018-05-19 Perforation 3607.50 3608.00 2
2018-05-19 Perforation 3620.00 3620.50 2
2018-05-19 Perforation 3632.50 3633.00 3
2018-05-19 Perforation 3645.00 3645.50 3
2018-05-19 Perforation 2657.50 3658.00 3
2018-05-19 Perforation 3670.00 3670.50 3
2018-05-19 Multi-Stage Fracture 3582.50 3670.50 0
2018-05-19 Perforation 3482.50 3483.00 3
2018-04-20 Perforation 5695.00 5695.20 3
2018-04-30 Perforation 5495.00 5495.50 3
2018-05-19 Perforation 3495.00 3495.50 3
2018-05-19 Perforation 3507.50 3508.00 3
2018-05-19 Perforation 3520.00 3520.50 3
2018-05-19 Perforation 3532.50 3533.00 2
2018-05-19 Perforation 3545.00 3545.50 2
2018-05-19 Perforation 3557.50 3558.00 2
2018-05-19 Perforation 3570.00 3570.50 2
2018-05-19 Multi-Stage Fracture 3482.50 3570.50 0
2018-04-30 Perforation 5507.50 5508.00 3
2018-04-30 Perforation 5520.00 5520.50 3
2018-04-30 Perforation 5532.50 5533.00 3
2018-04-30 Perforation 5545.00 5545.50 3
2018-04-30 Perforation 5557.50 5558.00 3
2018-04-30 Perforation 5570.00 5570.50 3
2018-04-30 Multi-Stage Fracture 5482.50 5570.50 0
2018-05-01 Perforation 5382.50 5383.00 3
2018-05-01 Perforation 5395.00 5395.50 3
2018-04-20 Perforation 5707.50 5707.70 3
2018-05-01 Perforation 5407.50 5408.00 3
2018-05-01 Perforation 5420.00 5420.50 3
2018-05-01 Perforation 5432.50 5433.00 3
2018-05-01 Perforation 5445.00 5445.50 3
2018-05-01 Perforation 5457.50 5458.00 3
2018-05-01 Perforation 5470.00 5470.50 3
2018-05-01 Multi-Stage Fracture 5382.50 5470.50 0
2018-05-02 Perforation 5282.50 5283.00 3
2018-05-02 Perforation 5295.00 5295.50 3
2018-05-02 Perforation 5307.50 5308.00 3
2018-04-20 Perforation 5720.00 5720.20 3
2018-05-02 Perforation 5320.00 5320.50 3
2018-05-02 Perforation 5332.50 5333.00 3
2018-05-02 Perforation 5345.00 5345.50 3
2018-05-02 Perforation 5357.50 5358.00 3
2018-05-02 Perforation 5370.00 5370.50 3
2018-05-02 Multi-Stage Fracture 5282.50 5370.50 0
2018-05-03 Perforation 5182.50 5183.00 3
2018-05-03 Perforation 5195.00 5195.50 3
2018-05-03 Perforation 5207.50 5208.00 3
2018-05-03 Perforation 5220.00 5220.50 3
2018-04-20 Perforation 5732.50 5732.70 3
2018-05-03 Perforation 5232.50 5233.00 3
2018-05-03 Perforation 5245.00 5245.50 3
2018-05-03 Perforation 5257.50 5258.00 3
2018-05-03 Perforation 5270.00 5270.50 3
2018-05-03 Multi-Stage Fracture 5182.50 5270.50 0
2018-05-03 Perforation 5082.50 5083.00 3
2018-05-03 Perforation 5095.00 5095.50 3
2018-05-03 Perforation 5107.50 5108.00 3
2018-05-03 Perforation 5120.00 5120.50 3
2018-05-03 Perforation 5132.50 5133.00 3
2018-04-20 Perforation 5745.00 5745.20 3
2018-05-03 Perforation 5145.00 5145.50 3
2018-05-03 Perforation 5157.50 5158.00 3
2018-05-03 Perforation 5170.00 5170.50 3
2018-05-03 Multi-Stage Fracture 5082.50 5170.50 0
2018-05-13 Perforation 4982.50 4983.00 2
2018-05-13 Perforation 4995.00 4995.50 2
2018-05-13 Perforation 5007.50 5008.00 2
2018-05-13 Perforation 5020.00 5020.50 2
2018-05-13 Perforation 5032.50 5033.00 3
2018-05-13 Perforation 5045.00 5045.50 3
2018-04-20 Perforation 5757.50 5757.70 3
2018-05-13 Perforation 5057.50 5058.00 3
2018-05-13 Perforation 5070.00 5070.50 3
2018-05-13 Multi-Stage Fracture 4982.50 5070.50 0
2018-05-13 Perforation 4882.50 4883.00 2
2018-05-13 Perforation 4895.00 4895.50 2
2018-05-13 Perforation 4907.50 4908.00 2
2018-05-13 Perforation 4920.00 4920.50 2
2018-05-13 Perforation 4932.50 4933.00 3
2018-05-13 Perforation 4945.00 4945.50 3
2018-05-13 Perforation 4957.50 4958.00 3
2018-04-20 Perforation 5773.00 5773.20 3
2018-05-13 Perforation 4970.00 4970.50 3
2018-05-13 Multi-Stage Fracture 4882.50 4970.50 0
2018-05-14 Perforation 4782.50 4783.00 3
2018-05-14 Perforation 4795.00 4795.50 3
2018-05-14 Perforation 4807.50 4808.00 3
2018-05-14 Perforation 4820.00 4820.50 3
2018-05-14 Perforation 4832.50 4833.00 2
2018-05-14 Perforation 4845.00 4845.50 2
2018-05-14 Perforation 4857.50 4858.00 2
2018-05-14 Perforation 4870.00 4870.50 2
2018-04-20 Multi-Stage Fracture 5682.50 5773.20 0
2018-05-14 Multi-Stage Fracture 4782.50 4870.50 0
2018-05-15 Perforation 4682.50 4683.00 2
2018-05-15 Perforation 4695.00 4695.50 2
2018-05-15 Perforation 4707.50 4708.00 2
2018-05-15 Perforation 4720.00 4720.50 2
2018-05-15 Perforation 4732.50 4733.00 3
2018-05-15 Perforation 4745.00 4745.50 3
2018-05-15 Perforation 4757.50 4758.00 3
2018-05-15 Perforation 4770.00 4770.50 3
2018-05-15 Multi-Stage Fracture 4682.50 4770.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-20 2018-05-19 3,177 42,933 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 91.9705 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.7073 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.7073 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.256 N/A
Water 7732-18-5 100 0.256 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0086 N/A
Dibromoacetonitrile 3252-43-5 100 0.0086 N/A
Polyethylene Glycol 25322-68-3 100 0.0086 N/A
Sodium Bromide 7647-15-6 100 0.0086 N/A
Water 7732-18-5 100 0.0086 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.1 N/A
Non-hazardous Not Available 100 0.1 N/A
Water 7732-18-5 100 0.1 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.002 N/A
Methanol 67-56-1 100 0.002 N/A
Modified thiourea polymer 68527-49-1 100 0.002 N/A
Olefin 64743-02-8 100 0.002 N/A
Polyoxyalkylenes 68951-67-7 100 0.002 N/A
Propargyl alcohol 107-19-7 100 0.002 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0005 N/A
Isopropanol 67-63-0 100 0.0005 N/A
Methanol 67-56-1 100 0.0005 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.1275 N/A
Oxyalkylated alcohol 9014 100 0.1275 N/A
Petroleum distillates 64742-47-8 100 0.1275 N/A
Polyacrylate 9014 100 0.1275 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0022 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0116 N/A
Water 7732-18-5 100 0.0116 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-27 2018-05-20 Surface Water - Lake 39363

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3085 0.0 0.0 0.0
2019 8519 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-22 No Incident Encountered 0.00 0.00
2018-06-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References