X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201103000

Well Details

Well ID: 0625201103000
Loading map...
Location: 00/03-11-062-20W5/0
Location Alias: 00/03-11-62-20 W5M
Location Alias 2: 00/03-11-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 11-14D KAYBOBS 3-11-62-20
Operator Name: Murphy Oil Company Ltd.
License Number: 0486014
License Date: 2017-10-25
License Status: Issued
Spud Date: 2017-12-10
Final Drill Date: 2018-02-16
Well Total Depth: 5738.00 m
Surface Hole Latitude: 54.364560
Surface Hole Longitude: -116.889692

For data sources see[1][2]

Well History

Date Event
2017-10-25 Obtained License
2017-12-10 Surface Casing Operation Performed
2017-12-22 Direction Drilling Operation Performed - Deviate
2017-12-24 Intermediate Casing Operation Performed
2017-12-24 Well Log Performed
2018-02-15 Direction Drilling Operation Performed - Horizontal
2018-02-16 Finished Drilling
2018-02-16 Well Log Performed
2018-02-16 Well Mode changed to Drilled and Cased
2018-02-18 Production Casing Operation Performed
2018-02-18 Rig Released
2018-04-17 Perforation Treatment Performed - Jet Perforation
2018-04-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-04 Perforation Treatment Performed - Jet Perforation
2018-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-05 Perforation Treatment Performed - Jet Perforation
2018-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-06 Perforation Treatment Performed - Jet Perforation
2018-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-07 Perforation Treatment Performed - Jet Perforation
2018-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-08 Perforation Treatment Performed - Jet Perforation
2018-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-10 Perforation Treatment Performed - Jet Perforation
2018-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-11 Perforation Treatment Performed - Jet Perforation
2018-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-12 Perforation Treatment Performed - Jet Perforation
2018-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-13 Perforation Treatment Performed - Jet Perforation
2018-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-14 Perforation Treatment Performed - Jet Perforation
2018-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-28 Well Began Production
2018-08-28 Well Fluid changed to Gas
2018-08-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-10 Precision Drilling Corporation 547 N/A Set Surface
2018-02-11 Precision Drilling Corporation 547 N/A Drill To LD
2017-12-21 Precision Drilling Corporation 547 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-22 687.80 Deviate (5 - 79 degrees)
2018-02-15 3309.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-17 Perforation 5642.00 5642.50 5
2018-05-04 Perforation 5630.00 5630.50 5
2018-05-08 Perforation 4730.00 4730.50 5
2018-05-08 Multi-Stage Fracture 4682.00 4730.50 0
2018-05-08 Perforation 4622.00 4622.50 5
2018-05-08 Perforation 4634.00 4634.50 5
2018-05-08 Perforation 4646.00 4646.50 5
2018-05-08 Perforation 4658.00 4658.50 5
2018-05-08 Perforation 4670.00 4670.50 5
2018-05-08 Multi-Stage Fracture 4622.00 4670.50 0
2018-05-08 Perforation 4562.00 4562.50 5
2018-05-08 Perforation 4574.00 4574.50 5
2018-05-04 Multi-Stage Fracture 5582.00 5630.50 0
2018-05-08 Perforation 4586.00 4586.50 5
2018-05-08 Perforation 4598.00 4598.50 5
2018-05-08 Perforation 4610.00 4610.50 5
2018-05-08 Multi-Stage Fracture 4562.00 4610.50 0
2018-05-08 Perforation 4502.00 4502.50 5
2018-05-08 Perforation 4514.00 4514.50 5
2018-05-08 Perforation 4526.00 4526.50 5
2018-05-08 Perforation 4538.00 4538.50 5
2018-05-08 Perforation 4550.00 4550.50 5
2018-05-08 Multi-Stage Fracture 4502.00 4550.50 0
2018-05-04 Perforation 5522.00 5522.50 5
2018-05-10 Perforation 4442.00 4442.50 5
2018-05-10 Perforation 4454.00 4454.50 5
2018-05-10 Perforation 4466.00 4466.50 5
2018-05-10 Perforation 4478.00 4478.50 5
2018-05-10 Perforation 4490.00 4490.50 5
2018-05-10 Multi-Stage Fracture 4442.00 4490.50 0
2018-05-10 Perforation 4382.00 4382.50 4
2018-05-10 Perforation 4394.00 4394.50 4
2018-05-10 Perforation 4406.00 4406.50 4
2018-05-10 Perforation 4418.00 4418.50 4
2018-05-04 Perforation 5534.00 5534.50 5
2018-05-10 Perforation 4430.00 4430.50 4
2018-05-10 Multi-Stage Fracture 4382.00 4430.50 0
2018-05-10 Perforation 4322.00 4322.50 4
2018-05-10 Perforation 4334.00 4334.50 4
2018-05-10 Perforation 4346.00 4346.50 4
2018-05-10 Perforation 4358.00 4358.50 4
2018-05-10 Perforation 4370.00 4370.50 4
2018-05-10 Multi-Stage Fracture 4322.00 4370.50 0
2018-05-10 Perforation 4262.00 4262.50 4
2018-05-10 Perforation 4274.00 4274.50 4
2018-05-04 Perforation 5546.00 5546.50 5
2018-05-10 Perforation 4286.00 4286.50 4
2018-05-10 Perforation 4298.00 4298.50 4
2018-05-10 Perforation 4310.00 4310.50 4
2018-05-10 Multi-Stage Fracture 4262.00 4310.50 0
2018-05-11 Perforation 4202.00 4202.50 4
2018-05-11 Perforation 4214.00 4214.50 4
2018-05-11 Perforation 4226.00 4226.50 4
2018-05-11 Perforation 4238.00 4238.50 4
2018-05-11 Perforation 4250.00 4250.50 4
2018-05-11 Multi-Stage Fracture 4202.00 4250.50 0
2018-05-04 Perforation 5558.00 5558.50 5
2018-05-11 Perforation 4142.00 4142.50 4
2018-05-11 Perforation 4154.00 4154.50 4
2018-05-11 Perforation 4166.00 4166.50 4
2018-05-11 Perforation 4178.00 4178.50 4
2018-05-11 Perforation 4190.00 4190.50 4
2018-05-11 Multi-Stage Fracture 4142.00 4190.50 0
2018-05-11 Perforation 4082.00 4082.50 4
2018-05-11 Perforation 4094.00 4094.50 4
2018-05-11 Perforation 4106.00 4106.50 4
2018-05-11 Perforation 4118.00 4118.50 4
2018-05-04 Perforation 5570.00 5570.50 5
2018-05-11 Perforation 4130.00 4130.50 4
2018-05-11 Multi-Stage Fracture 4082.00 4130.50 0
2018-05-11 Perforation 4022.00 4022.50 4
2018-05-11 Perforation 4034.00 4034.50 4
2018-05-11 Perforation 4046.00 4046.50 4
2018-05-11 Perforation 4058.00 4058.50 4
2018-05-11 Perforation 4070.00 4070.50 4
2018-05-11 Multi-Stage Fracture 4022.00 4070.50 0
2018-05-12 Perforation 3962.00 3962.50 4
2018-05-12 Perforation 3974.00 3974.50 4
2018-05-04 Multi-Stage Fracture 5522.00 5570.50 0
2018-05-12 Perforation 3986.00 3986.50 4
2018-05-12 Perforation 3998.00 3998.50 4
2018-05-12 Perforation 4010.00 4010.50 4
2018-05-12 Multi-Stage Fracture 3962.00 4010.50 0
2018-05-12 Perforation 3902.00 3902.50 4
2018-05-12 Perforation 3914.00 3914.50 4
2018-05-12 Perforation 3926.00 3926.50 4
2018-05-12 Perforation 3938.00 3938.50 4
2018-05-12 Perforation 3950.00 3950.50 4
2018-05-12 Multi-Stage Fracture 3902.00 3950.50 0
2018-05-05 Perforation 5462.00 5462.50 5
2018-05-12 Perforation 3842.00 3842.50 4
2018-05-12 Perforation 3854.00 3854.50 4
2018-05-12 Perforation 3866.00 3866.50 4
2018-05-12 Perforation 3878.00 3878.50 4
2018-05-12 Perforation 3890.00 3890.50 4
2018-05-12 Multi-Stage Fracture 3842.00 3890.50 0
2018-05-12 Perforation 3782.00 3782.50 4
2018-05-12 Perforation 3794.00 3794.50 4
2018-05-12 Perforation 3806.00 3806.50 4
2018-05-12 Perforation 3818.00 3818.50 4
2018-05-05 Perforation 5474.00 5474.50 5
2018-05-12 Perforation 3830.00 3830.50 4
2018-05-12 Multi-Stage Fracture 3782.00 3830.50 0
2018-05-12 Perforation 3722.00 3722.50 4
2018-05-12 Perforation 3734.00 3734.50 4
2018-05-12 Perforation 3746.00 3746.50 4
2018-05-12 Perforation 3758.00 3758.50 4
2018-05-12 Perforation 3770.00 3770.50 4
2018-05-12 Multi-Stage Fracture 3722.00 3770.50 0
2018-05-13 Perforation 3662.00 3662.50 4
2018-05-13 Perforation 3674.00 3674.50 4
2018-04-17 Perforation 5654.00 5654.50 5
2018-05-05 Perforation 5486.00 5486.50 5
2018-05-13 Perforation 3686.00 3686.50 4
2018-05-13 Perforation 3698.00 3698.50 4
2018-05-13 Perforation 3710.00 3710.50 4
2018-05-13 Multi-Stage Fracture 3662.00 3710.50 0
2018-05-13 Perforation 3602.00 3602.50 4
2018-05-13 Perforation 3614.00 3614.50 4
2018-05-13 Perforation 3626.00 3626.50 4
2018-05-13 Perforation 3638.00 3638.50 4
2018-05-13 Perforation 3650.00 3650.50 4
2018-05-13 Multi-Stage Fracture 3602.00 3650.50 0
2018-05-05 Perforation 5498.00 5498.50 5
2018-05-13 Perforation 3542.00 3542.50 4
2018-05-13 Perforation 3554.00 3554.50 4
2018-05-13 Perforation 3566.00 3566.50 4
2018-05-13 Perforation 3578.00 3578.50 4
2018-05-13 Perforation 3590.00 3590.50 4
2018-05-13 Multi-Stage Fracture 3542.00 3590.50 0
2018-05-14 Perforation 3482.00 3482.50 4
2018-05-14 Perforation 3494.00 3494.50 4
2018-05-14 Perforation 3506.00 3506.50 4
2018-05-14 Perforation 3518.00 3518.50 4
2018-05-05 Perforation 5410.00 5510.50 5
2018-05-14 Perforation 3530.00 3530.50 4
2018-05-14 Multi-Stage Fracture 3482.00 3530.50 0
2018-05-14 Perforation 3422.00 3422.50 4
2018-05-14 Perforation 3434.00 3434.50 4
2018-05-14 Perforation 3446.00 3446.50 4
2018-05-14 Perforation 3458.00 3458.50 4
2018-05-14 Perforation 3470.00 3470.50 4
2018-05-14 Multi-Stage Fracture 3422.00 3470.50 0
2018-05-14 Perforation 3362.00 3362.50 4
2018-05-14 Perforation 3374.00 3374.50 4
2018-05-05 Multi-Stage Fracture 5462.00 5510.50 0
2018-05-14 Perforation 3386.00 3386.50 4
2018-05-14 Perforation 3398.00 3398.50 4
2018-05-14 Perforation 3410.00 3410.50 4
2018-05-14 Multi-Stage Fracture 3362.00 3410.50 0
2018-05-05 Perforation 5402.00 5402.50 5
2018-05-05 Perforation 5414.00 5414.50 5
2018-05-05 Perforation 5426.00 5426.50 5
2018-05-05 Perforation 5438.00 5438.50 5
2018-05-05 Perforation 5450.00 5450.50 5
2018-05-05 Multi-Stage Fracture 5402.00 5450.50 0
2018-04-17 Perforation 5666.00 5666.50 5
2018-05-05 Perforation 5342.00 5342.50 5
2018-05-05 Perforation 5354.00 5354.50 5
2018-05-05 Perforation 5366.00 5366.50 5
2018-05-05 Perforation 5378.00 5378.50 5
2018-05-05 Perforation 5390.00 5390.50 5
2018-05-05 Multi-Stage Fracture 5342.00 5390.50 0
2018-05-05 Perforation 5282.00 5282.50 5
2018-05-05 Perforation 5294.00 5294.50 5
2018-05-05 Perforation 5306.00 5306.50 5
2018-05-05 Perforation 5318.00 5318.50 5
2018-04-17 Perforation 5678.00 5678.50 5
2018-05-05 Perforation 5330.00 5330.50 5
2018-05-05 Multi-Stage Fracture 5282.00 5330.50 0
2018-05-06 Perforation 5222.00 5222.50 5
2018-05-06 Perforation 5234.00 5234.50 5
2018-05-06 Perforation 5246.00 5246.50 5
2018-05-06 Perforation 5258.00 5258.50 5
2018-05-06 Perforation 5270.00 5270.50 5
2018-05-06 Multi-Stage Fracture 5222.00 5270.50 0
2018-05-06 Perforation 5162.00 5162.50 5
2018-05-06 Perforation 5174.00 5174.50 5
2018-04-17 Multi-Stage Fracture 5642.00 5703.10 0
2018-05-06 Perforation 5186.00 5186.50 5
2018-05-06 Perforation 5198.00 5198.50 5
2018-05-06 Perforation 5210.00 5210.50 5
2018-05-06 Multi-Stage Fracture 5162.00 5210.50 0
2018-05-06 Perforation 5102.00 5102.50 5
2018-05-06 Perforation 5114.00 5114.50 5
2018-05-06 Perforation 5126.00 5126.50 5
2018-05-06 Perforation 5138.00 5138.50 5
2018-05-06 Perforation 5150.00 5150.50 5
2018-05-06 Multi-Stage Fracture 5102.00 5150.50 0
2018-05-04 Perforation 5582.00 5582.50 5
2018-05-06 Perforation 5042.00 5042.50 5
2018-05-06 Perforation 5054.00 5054.50 5
2018-05-06 Perforation 5066.00 5066.50 5
2018-05-06 Perforation 5078.00 5078.50 5
2018-05-06 Perforation 5090.00 5090.50 5
2018-05-06 Multi-Stage Fracture 5042.00 5090.50 0
2018-05-07 Perforation 4982.00 4982.50 5
2018-05-07 Perforation 4994.00 4994.50 5
2018-05-07 Perforation 5006.00 5006.50 5
2018-05-07 Perforation 5018.00 5018.50 5
2018-05-04 Perforation 5594.00 5594.50 5
2018-05-07 Perforation 5030.00 5030.50 5
2018-05-07 Multi-Stage Fracture 4982.00 5030.50 0
2018-05-07 Perforation 4922.00 4922.50 5
2018-05-07 Perforation 4934.00 4934.50 5
2018-05-07 Perforation 4946.00 4946.50 5
2018-05-07 Perforation 4958.00 4958.50 5
2018-05-07 Perforation 4970.00 4970.50 5
2018-05-07 Multi-Stage Fracture 4922.00 4970.50 0
2018-05-07 Perforation 4862.00 4862.50 5
2018-05-07 Perforation 4874.00 4874.50 5
2018-05-04 Perforation 5606.00 5606.50 5
2018-05-07 Perforation 4886.00 4886.50 5
2018-05-07 Perforation 4898.00 4898.50 5
2018-05-07 Perforation 4910.00 4910.50 5
2018-05-07 Multi-Stage Fracture 4862.00 4910.50 0
2018-05-07 Perforation 4802.00 4802.50 5
2018-05-07 Perforation 4814.00 4814.50 5
2018-05-07 Perforation 4826.00 4826.50 5
2018-05-07 Perforation 4838.00 4838.50 5
2018-05-07 Perforation 4850.00 4850.50 5
2018-05-07 Multi-Stage Fracture 4802.00 4850.50 0
2018-05-04 Perforation 5618.00 5618.50 5
2018-05-07 Perforation 4742.00 4742.50 5
2018-05-07 Perforation 4754.00 4754.50 5
2018-05-07 Perforation 4766.00 4766.50 5
2018-05-07 Perforation 4778.00 4778.50 5
2018-05-07 Perforation 4790.00 4790.50 5
2018-05-07 Multi-Stage Fracture 4742.00 4790.50 0
2018-05-08 Perforation 4682.00 4682.50 5
2018-05-08 Perforation 4694.00 4694.50 5
2018-05-08 Perforation 4706.00 4706.50 5
2018-05-08 Perforation 4718.00 4718.50 5

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-17 2018-05-14 3,191 44,712 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 91.6434 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.6389 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.7255 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.5529 N/A
Water 7732-18-5 100 0.5529 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0086 N/A
Dibromoacetonitrile 3252-43-5 100 0.0086 N/A
Polyethylene Glycol 25322-68-3 100 0.0086 N/A
Sodium Bromide 7647-15-6 100 0.0086 N/A
Water 7732-18-5 100 0.0086 N/A
Breaker HP BJ Services Breaker Ethylene glycol 107-21-1 100 0.0099 N/A
Non-hazardous Not Available 100 0.0099 N/A
tert-Butyl hydroperoxide 75-91-2 100 0.0099 N/A
Water 7732-18-5 100 0.0099 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0265 N/A
Potassium hydroxide 1310-58-3 100 0.0265 N/A
Water 7732-18-5 100 0.0265 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0972 N/A
Non-hazardous Not Available 100 0.0972 N/A
Water 7732-18-5 100 0.0972 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0043 N/A
Methanol 67-56-1 100 0.0043 N/A
Modified thiourea polymer 68527-49-1 100 0.0043 N/A
Olefin 64743-02-8 100 0.0043 N/A
Polyoxyalkylenes 68951-67-7 100 0.0043 N/A
Propargyl alcohol 107-19-7 100 0.0043 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0232 N/A
Ethylene glycol 107-21-1 100 0.0231 N/A
Inorganic Borates 1319-33-1 100 0.0231 N/A
Polysaccharide 11138-66-2 100 0.0231 N/A
Water 7732-18-5 100 0.0231 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0011 N/A
Isopropanol 67-63-0 100 0.0011 N/A
Methanol 67-56-1 100 0.0011 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.1073 N/A
Oxyalkylated alcohol 9014 100 0.1073 N/A
Petroleum distillates 64742-47-8 100 0.1073 N/A
Polyacrylate 9014 100 0.1073 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0265 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0048 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0107 N/A
Water 7732-18-5 100 0.0107 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-27 2018-05-20 Surface Water - Lake 40592

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3127 0.0 0.0 0.0
2019 8586 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-18 No Incident Encountered 0.00 0.00
2018-06-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References