If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625262310030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.379352,"lon":-117.784888,"icon":""}]} |
Location: 03/10-23-062-26W5/0 | |
Location Alias: 03/10-23-62-26 W5M | |
Location Alias 2: 03/10-23-062-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 26 | |
Section: 23 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: OEI SIMON 10-23-62-26 | |
Operator Name: Gain Energy Ltd. | |
License Number: 0181941 | |
License Date: 1995-11-08 | |
License Status: Suspension | |
Spud Date: 1995-11-16 | |
Final Drill Date: 1996-01-01 | |
Well Total Depth: 3988.00 m | |
Surface Hole Latitude: 54.379352 | |
Surface Hole Longitude: -117.784888 |
Date | Event |
---|---|
1995-11-08 | Obtained License |
1995-11-19 | Surface Casing Operation Performed |
1995-12-23 | Well Log Performed |
1995-12-25 | Production Casing Operation Performed |
1996-01-01 | Finished Drilling |
1996-01-01 | Well Log Performed |
1996-01-01 | Well Mode changed to Drilled and Cased |
1996-01-03 | Plug Back Performed |
1996-01-03 | Well Log Performed |
1996-01-04 | Rig Released |
1996-02-29 | Well Log Performed |
1996-03-01 | Perforation Treatment Performed - Jet Perforation |
1996-03-01 | Well Log Performed |
1996-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-03-05 | Well Log Performed |
1996-03-06 | Perforation Treatment Performed - Jet Perforation |
1996-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-25 | Well Log Performed |
1996-08-31 | Well Log Performed |
1997-03-07 | Well Log Performed |
1997-08-01 | Well Began Production |
1997-08-01 | Well Fluid changed to Crude Oil |
1997-08-01 | Well Mode changed to Gas Lift |
2001-05-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-03 | Plug Back Performed |
2001-05-03 | Well Fluid changed to Crude Oil |
2001-05-03 | Well Log Performed |
2001-05-03 | Well Mode changed to Abandoned Zone |
2001-05-04 | Well Log Performed |
2001-05-16 | Well Log Performed |
2001-05-17 | Perforation Treatment Performed - Jet Perforation |
2001-05-17 | Well Log Performed |
2001-05-18 | Perforation Treatment Performed - Fractured |
2001-05-24 | Well Log Performed |
2001-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-25 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-01 | Perforation | 3635.00 | 3638.00 | 17 |
1996-03-03 | Acid Treatment | 3635.00 | 3638.00 | 0 |
1996-03-05 | Packing Device Capped w/Cement | 3625.00 | 3625.50 | 0 |
1996-03-06 | Perforation | 3595.00 | 3605.00 | 17 |
1996-03-07 | Acid Treatment | 3595.00 | 3605.00 | 0 |
2001-05-03 | Packing Device Capped w/Cement | 3565.00 | 3573.00 | 0 |
2001-05-17 | Perforation | 2080.00 | 2091.00 | 17 |
2001-05-18 | Fracture | 2080.00 | 2091.00 | 0 |
2001-05-25 | Packing Device Capped w/Cement | 2062.00 | 2070.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 2012 | 0.0 | 0.0 | 0.0 |
1998 | 1412 | 0.0 | 0.0 | 0.0 |
For data sources see[5]