X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625262612020

Well Details

Well ID: 0625262612020
Loading map...
Location: 02/12-26-062-26W5/0
Location Alias: 02/12-26-62-26 W5M
Location Alias 2: 02/12-26-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI SIMON 12-26-62-26
Operator Name: Gain Energy Ltd.
License Number: 0165650
License Date: 1994-03-04
License Status: Suspension
Spud Date: 1994-05-27
Final Drill Date: 1994-06-15
Well Total Depth: 2501.00 m
Surface Hole Latitude: 54.392969
Surface Hole Longitude: -117.795516

For data sources see[1][2]

Well History

Date Event
1994-03-04 Obtained License
1994-05-27 Well Log Performed
1994-05-29 Surface Casing Operation Performed
1994-06-15 Finished Drilling
1994-06-15 Well Log Performed
1994-06-15 Well Mode changed to Drilled and Cased
1994-06-18 Production Casing Operation Performed
1994-06-19 Rig Released
1994-07-09 Well Log Performed
1994-07-10 Perforation Treatment Performed - Fractured
1994-07-10 Perforation Treatment Performed - Jet Perforation
1994-07-13 Perforation Treatment Performed - Jet Perforation
1994-07-13 Well Log Performed
1994-07-16 Perforation Treatment Performed - Fractured
1994-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-23 Plug Back Performed
1994-11-23 Well Log Performed
1994-11-25 Perforation Treatment Performed - Jet Perforation
1994-11-25 Well Log Performed
1994-11-26 Perforation Treatment Performed - Fractured
1997-08-15 Well Log Performed
1997-12-04 Well Began Production
1997-12-04 Well Fluid changed to Crude Oil
1997-12-04 Well Mode changed to Pumping
2001-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-08 Plug Back Performed
2001-12-08 Well Fluid changed to Crude Oil
2001-12-08 Well Log Performed
2001-12-08 Well Mode changed to Abandoned Zone
2001-12-09 Perforation Treatment Performed - Jet Perforation
2001-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-12 Plug Back Performed
2001-12-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-10 Perforation 2447.00 2459.00 13
2001-12-09 Perforation 880.00 883.00 20
2001-12-10 Acid Treatment 880.00 883.00 0
2001-12-12 Packing Device Capped w/Cement 861.00 870.00 0
1994-07-10 Fracture 2447.00 2459.00 0
1994-07-13 Perforation 2429.50 2435.00 13
1994-07-13 Perforation 2437.00 2441.50 13
1994-07-16 Fracture 2429.50 2441.50 0
1994-11-23 Packing Device Capped w/Cement 2412.00 2420.00 0
1994-11-25 Perforation 1875.50 1885.30 13
1994-11-26 Fracture 1875.50 1885.30 0
2001-12-08 Packing Device Capped w/Cement 1854.00 1865.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 744 0.0 0.0 0.0
1998 3971 0.0 0.0 0.0

For data sources see[5]

References