X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625263604000

Well Details

Well ID: 0625263604000
Loading map...
Location: 00/04-36-062-26W5/0
Location Alias: 00/04-36-62-26 W5M
Location Alias 2: 00/04-36-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI SIMON 4-36-62-26
Operator Name: Gain Energy Ltd.
License Number: 0020945
License Date: 1961-06-20
License Status: Abandoned
Spud Date: 1961-06-28
Final Drill Date: 1961-08-22
Well Total Depth: 3543.90 m
Surface Hole Latitude: 54.401348
Surface Hole Longitude: -117.772626

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-20 Obtained License
1961-08-22 Finished Drilling
1961-08-22 Well Mode changed to Drilled and Cased
1961-08-27 Production Casing Operation Performed
1961-08-28 Perforation Treatment Performed - Open-Hole Completion
1961-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-03 Well Began Production
1961-09-03 Well Fluid changed to Crude Oil
1961-09-03 Well Mode changed to Flowing
1978-07-20 Perforation Treatment Performed - Jet Perforation
1978-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-01 Well Fluid changed to Crude Oil
1985-12-01 Well Mode changed to Gas Lift
1999-09-05 Well Log Performed
1999-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-06 Perforation Treatment Performed - Cement Squeeze
1999-10-06 Plug Back Performed
1999-10-12 Well Abandoned
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-28 Open Hole/Barefoot Completion 3530.80 3543.90 0
1961-08-30 Acid Treatment 3530.80 3543.90 0
1978-07-20 Perforation 3522.90 3532.00 7
1978-07-27 Acid Treatment 3522.90 3543.90 0
1999-10-06 Cement Squeeze 3522.90 3543.90 0
1999-10-06 Packing Device Capped w/Cement 2950.00 3094.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 367 0.0 0.0 0.0
1968 1127 0.0 0.0 0.0
1969 5188 0.0 0.0 0.0
1970 5877 0.0 0.0 0.0
1971 4895 0.0 0.0 0.0
1972 3095 0.0 0.0 0.0
1973 6151 0.0 0.0 0.0
1974 6690 0.0 0.0 0.0
1975 7920 0.0 0.0 0.0
1976 7988 0.0 0.0 0.0
1977 6046 0.0 0.0 0.0
1978 3779 0.0 0.0 0.0
1979 7652 0.0 0.0 0.0
1980 7972 0.0 0.0 0.0
1981 7591 0.0 0.0 0.0
1982 7193 0.0 0.0 0.0
1983 6521 0.0 0.0 0.0
1984 8484 0.0 0.0 0.0
1985 6998 0.0 0.0 0.0
1986 6862 0.0 0.0 0.0
1987 8045 0.0 0.0 0.0
1988 8644 0.0 0.0 0.0
1989 7529 0.0 0.0 0.0
1990 8558 0.0 0.0 0.0
1991 7468 0.0 0.0 0.0
1992 6373 0.0 0.0 0.0
1993 8098 0.0 0.0 0.0
1994 8203 0.0 0.0 0.0
1995 5286 0.0 0.0 0.0
1996 6840 0.0 0.0 0.0
1997 6683 0.0 0.0 0.0
1998 7858 0.0 0.0 0.0
1999 5471 0.0 0.0 0.0

For data sources see[5]

References