X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626020804002

Well Details

Well ID: 0626020804002
Loading map...
Location: 00/04-08-062-02W6/2
Location Alias: 00/04-08-62-02 W6M
Location Alias 2: 00/04-08-062-02 W6/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 02
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: XTO HZ LATOR 4-8-62-2
Operator Name: XTO Energy Canada ULC
License Number: 0481728
License Date: 2016-12-02
License Status: Amended
Spud Date: 2017-01-30
Final Drill Date: 2017-03-26
Well Total Depth: 6054.00 m
Surface Hole Latitude: 54.366026
Surface Hole Longitude: -118.275276

For data sources see[1][2]

Well History

Date Event
2016-12-02 Obtained License
2017-02-01 Surface Casing Operation Performed
2017-02-10 Direction Drilling Operation Performed - Deviate
2017-02-23 Intermediate Casing Operation Performed
2017-02-25 Direction Drilling Operation Performed - Horizontal
2017-03-26 Finished Drilling
2017-03-26 Well Log Performed
2017-03-26 Well Mode changed to Drilled and Cased
2017-03-29 Production Casing Operation Performed
2017-03-31 Rig Released
2017-07-22 Perforation Treatment Performed - Jet Perforation
2017-08-01 Well Fluid changed to Gas
2017-08-01 Well Mode changed to Testing
2017-08-08 Perforation Treatment Performed - Fractured
2017-08-08 Perforation Treatment Performed - Jet Perforation
2017-08-09 Perforation Treatment Performed - Fractured
2017-08-09 Perforation Treatment Performed - Jet Perforation
2017-08-10 Perforation Treatment Performed - Fractured
2017-08-10 Perforation Treatment Performed - Jet Perforation
2017-08-11 Perforation Treatment Performed - Fractured
2017-08-11 Perforation Treatment Performed - Jet Perforation
2017-08-12 Perforation Treatment Performed - Fractured
2017-08-12 Perforation Treatment Performed - Jet Perforation
2017-08-13 Perforation Treatment Performed - Fractured
2017-08-13 Perforation Treatment Performed - Jet Perforation
2017-08-14 Perforation Treatment Performed - Fractured
2017-08-14 Perforation Treatment Performed - Jet Perforation
2017-08-15 Perforation Treatment Performed - Fractured
2017-08-15 Perforation Treatment Performed - Jet Perforation
2018-02-01 Well Fluid changed to Gas
2018-02-01 Well Mode changed to Test Completed
2018-03-01 Well Began Production
2018-03-01 Well Fluid changed to Gas
2018-03-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-02-10 2100.00 Deviate (5 - 79 degrees)
2017-02-25 3255.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-07-22 Perforation 6013.50 6014.00 20
2017-08-08 Perforation 5856.00 5856.50 20
2017-08-12 Perforation 4433.50 4434.00 20
2017-08-12 Perforation 4416.00 4416.50 20
2017-08-12 Perforation 4398.50 4399.00 20
2017-08-12 Perforation 4381.00 4381.50 20
2017-08-12 Perforation 4363.50 4364.00 20
2017-08-12 Fracture 4363.50 4434.00 0
2017-08-12 Perforation 4345.00 4345.50 20
2017-08-12 Perforation 4327.50 4328.00 20
2017-08-12 Perforation 4310.00 4310.50 20
2017-08-12 Perforation 4292.50 4293.00 20
2017-08-08 Perforation 5833.50 5834.00 20
2017-08-12 Perforation 4275.00 4275.50 20
2017-08-12 Fracture 4275.00 4345.50 0
2017-08-13 Perforation 4256.50 4257.00 20
2017-08-13 Perforation 4239.00 4239.50 20
2017-08-13 Perforation 4221.50 4222.00 20
2017-08-13 Perforation 4204.00 4204.50 20
2017-08-13 Perforation 4186.50 4187.00 20
2017-08-13 Fracture 4186.50 4257.00 0
2017-08-13 Perforation 4168.00 4168.50 20
2017-08-13 Perforation 4150.50 4151.00 20
2017-08-08 Perforation 5811.00 5811.50 20
2017-08-13 Perforation 4133.00 4133.50 20
2017-08-13 Perforation 4115.50 4116.00 20
2017-08-13 Perforation 4098.00 4098.50 20
2017-08-13 Fracture 4098.00 4168.50 0
2017-08-13 Perforation 4079.50 4080.00 20
2017-08-13 Perforation 4062.00 4062.50 20
2017-08-13 Perforation 4044.50 4045.00 20
2017-08-13 Perforation 4027.00 4027.50 20
2017-08-13 Perforation 4009.50 4010.00 20
2017-08-13 Fracture 4009.50 4080.00 0
2017-08-08 Perforation 5788.50 5789.00 20
2017-08-13 Perforation 3991.00 3991.50 20
2017-08-13 Perforation 3973.50 3974.00 20
2017-08-13 Perforation 3956.00 3956.50 20
2017-08-13 Perforation 3938.50 3939.00 20
2017-08-13 Perforation 3921.00 3921.50 20
2017-08-13 Fracture 3921.00 3991.50 0
2017-08-13 Perforation 3902.50 3903.00 20
2017-08-13 Perforation 3885.00 3885.50 20
2017-08-13 Perforation 3867.50 3868.00 20
2017-08-13 Perforation 3850.00 3850.50 20
2017-08-08 Fracture 5788.50 5856.50 0
2017-08-13 Perforation 3832.50 3833.00 20
2017-08-13 Fracture 3832.50 3903.00 0
2017-08-13 Perforation 3814.00 3814.50 20
2017-08-13 Perforation 3796.50 3797.00 20
2017-08-13 Perforation 3779.00 3779.50 20
2017-08-13 Perforation 3761.50 3762.00 20
2017-08-13 Perforation 3744.00 3744.50 20
2017-08-14 Fracture 3744.00 3814.50 0
2017-08-14 Perforation 3725.50 3726.00 20
2017-08-14 Perforation 3708.00 3708.50 20
2017-08-08 Perforation 5766.00 5766.50 20
2017-08-14 Perforation 3690.50 3691.00 20
2017-08-14 Perforation 3673.00 3673.50 20
2017-08-14 Perforation 3655.50 3656.00 20
2017-08-14 Fracture 3655.50 3726.00 0
2017-08-14 Perforation 3637.00 3637.50 20
2017-08-14 Perforation 3619.50 3620.00 20
2017-08-14 Perforation 3602.00 3602.50 20
2017-08-14 Perforation 3584.50 3585.00 20
2017-08-14 Perforation 3567.00 3567.50 20
2017-08-15 Fracture 3567.00 3637.50 0
2017-08-08 Perforation 5743.50 5744.00 20
2017-08-15 Perforation 3548.50 3549.00 20
2017-08-15 Perforation 3531.00 3531.50 20
2017-08-15 Perforation 3513.50 3514.00 20
2017-08-15 Perforation 3496.00 3496.50 20
2017-08-15 Perforation 3478.50 3479.00 20
2017-08-15 Fracture 3478.50 3549.00 0
2017-08-08 Perforation 5721.00 5721.50 20
2017-08-08 Perforation 5698.50 5699.00 20
2017-08-09 Fracture 5698.50 5766.50 0
2017-07-22 Perforation 5991.00 5991.50 20
2017-08-09 Perforation 5676.00 5676.50 20
2017-08-09 Perforation 5653.50 5654.00 20
2017-08-09 Perforation 5631.00 5631.50 20
2017-08-09 Perforation 5608.50 5909.00 20
2017-08-09 Fracture 5608.50 5676.50 0
2017-08-09 Perforation 5586.00 5586.50 20
2017-08-09 Perforation 5563.50 5564.00 20
2017-08-09 Perforation 5541.00 5541.50 20
2017-08-09 Perforation 5518.50 5519.00 20
2017-08-09 Fracture 5518.50 5586.50 0
2017-07-22 Perforation 5968.50 5969.00 20
2017-08-09 Perforation 5496.00 5496.50 20
2017-08-09 Perforation 5473.50 5474.00 20
2017-08-09 Perforation 5451.00 5451.50 20
2017-08-09 Perforation 5428.50 5429.00 20
2017-08-09 Fracture 5428.50 5496.50 0
2017-08-10 Perforation 5406.00 5406.50 20
2017-08-10 Perforation 5383.50 5384.00 20
2017-08-10 Perforation 5361.00 5361.50 20
2017-08-10 Perforation 5338.50 5339.00 20
2017-08-10 Fracture 5338.50 5406.50 0
2017-08-08 Fracture 5968.50 6014.00 0
2017-08-10 Perforation 5316.00 5316.50 20
2017-08-10 Perforation 5293.50 5294.00 20
2017-08-10 Perforation 5271.00 5271.50 20
2017-08-10 Perforation 5248.50 5249.00 20
2017-08-10 Fracture 5248.50 5316.50 0
2017-08-11 Perforation 5230.50 5231.00 20
2017-08-11 Perforation 5213.00 5213.50 20
2017-08-11 Perforation 5195.50 5196.00 20
2017-08-11 Perforation 5178.00 5178.50 20
2017-08-11 Perforation 5160.00 5160.50 20
2017-08-08 Perforation 5946.00 5946.50 20
2017-08-11 Fracture 5160.00 5231.00 0
2017-08-11 Perforation 5141.50 5142.00 20
2017-08-11 Perforation 5124.00 5124.50 20
2017-08-11 Perforation 5106.50 5107.00 20
2017-08-11 Perforation 5089.00 5089.50 20
2017-08-11 Perforation 5071.50 5072.00 20
2017-08-11 Fracture 5071.50 5142.00 0
2017-08-11 Perforation 5053.00 5053.50 20
2017-08-11 Perforation 5035.50 5036.00 20
2017-08-11 Perforation 5018.00 5018.50 20
2017-08-08 Perforation 5923.50 5924.00 20
2017-08-11 Perforation 5000.50 5001.00 20
2017-08-11 Perforation 4983.00 4983.50 20
2017-08-11 Fracture 4983.00 5053.50 0
2017-08-11 Perforation 4964.50 4965.00 20
2017-08-11 Perforation 4947.00 4947.50 20
2017-08-11 Perforation 4929.50 4930.00 20
2017-08-11 Perforation 4912.00 4912.50 20
2017-08-11 Perforation 4894.50 4895.00 20
2017-08-11 Fracture 4894.50 4965.00 0
2017-08-11 Perforation 4876.00 4876.50 20
2017-08-08 Perforation 5901.00 5901.50 20
2017-08-11 Perforation 4858.50 4859.00 20
2017-08-11 Perforation 4841.00 4841.50 20
2017-08-11 Perforation 4823.50 4824.00 20
2017-08-11 Perforation 4806.00 4806.50 20
2017-08-11 Fracture 4806.00 4876.50 0
2017-08-11 Perforation 4787.50 4788.00 20
2017-08-11 Perforation 4770.00 4770.50 20
2017-08-11 Perforation 4752.50 4753.00 20
2017-08-11 Perforation 4735.00 4735.50 20
2017-08-11 Perforation 4717.50 4718.00 20
2017-08-08 Perforation 5878.50 5879.00 20
2017-08-11 Fracture 4717.50 4788.00 0
2017-08-12 Perforation 4699.00 4699.50 20
2017-08-12 Perforation 4681.50 4682.00 20
2017-08-12 Perforation 4664.00 4664.50 20
2017-08-12 Perforation 4646.50 4647.00 20
2017-08-12 Perforation 4629.00 4629.50 20
2017-08-12 Fracture 4629.00 4699.50 0
2017-08-12 Perforation 4610.50 4611.00 20
2017-08-12 Perforation 4593.00 4593.50 20
2017-08-12 Perforation 4575.50 4576.00 20
2017-08-08 Fracture 5878.50 5946.50 0
2017-08-12 Perforation 4558.00 4558.50 20
2017-08-12 Perforation 4540.50 4541.00 20
2017-08-12 Fracture 4540.50 4611.00 0
2017-08-12 Perforation 4522.50 4523.00 20
2017-08-12 Perforation 4508.00 4508.50 20
2017-08-12 Perforation 4493.50 4494.00 20
2017-08-12 Perforation 4479.00 4479.50 20
2017-08-12 Perforation 4464.50 4465.00 20
2017-08-12 Perforation 4450.00 4450.50 20
2017-08-12 Fracture 4450.00 4523.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-08 2017-08-15 3,312 35,322 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.0054 N/A
Atlas CRC-C (30/50) Canyon Technical Services Crystalline silica. quartz 14808-60-7 100 1.0793 N/A
Hexamethylenetetramine 100-97-0 100 1.0793 N/A
Phenol formaldehyde resin 9003-35-4 100 1.0793 N/A
Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 11.0897 N/A
Crystalline silica. quartz 14808-60-7 100 11.0897 N/A
Iron Oxide 1309-37-1 100 11.0897 N/A
Titanium Oxide 13463-67-7 100 11.0896 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 0.3597 N/A
Crystalline silica. quartz 14808-60-7 100 0.3597 N/A
Iron Oxide 1309-37-1 100 0.3597 N/A
Titanium Oxide 13463-67-7 100 0.3598 N/A
HCL 15% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 0.3957 N/A
Water 7732-18-5 100 0.3957 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.0086 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.0086 N/A
CAN-1004 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0011 N/A
Alcohols. C14-15. ethoxylated 68951-67-7 100 0.0011 N/A
Formic Acid 64-18-6 100 0.0011 N/A
Isopropanol 67-63-0 100 0.0011 N/A
Methanol 67-56-1 100 0.0011 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0011 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Technical Services Demulsifier Refer to MSDS 8253 100 0.0007 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0549 N/A
CAN-1101 Iron Control Reduction Canyon Technical Services Iron Control 2-Mercaptoethanol 60-24-2 100 0.0031 N/A
Cupric Chloride 7447-39-4 100 0.0031 N/A
Monoethanolamine 141-43-5 100 0.0031 N/A
CAN-1202 Acid Wetting Agent Canyon Technical Services Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0013 N/A
Water 7732-18-5 100 0.0013 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-07-25 2017-08-17 Surface Water - River 46636

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 288 0.0 0.0 0.0
2018 6712 0.0 0.0 0.0
2019 8088 0.0 0.0 0.0
2020 2073 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-31 No Incident Encountered 0.00 0.00
2017-08-29 No Incident Encountered 0.00 0.00
2017-08-28 No Incident Encountered 0.00 0.00

For data sources see[9]

References