If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626042907020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.365811,"lon":-118.534465,"icon":""}]} |
| Location: 02/07-29-062-04W6/0 | |
| Location Alias: 02/07-29-62-04 W6M | |
| Location Alias 2: 02/07-29-062-04 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 29 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: 7GEN HZ 102 KAKWA 7-29-62-4 | |
| Operator Name: Seven Generations Energy Ltd. | |
| License Number: 0493319 | |
| License Date: 2019-01-09 | |
| License Status: Amended | |
| Spud Date: 2019-02-04 | |
| Final Drill Date: 2019-03-05 | |
| Well Total Depth: 6260.00 m | |
| Surface Hole Latitude: 54.365811 | |
| Surface Hole Longitude: -118.534465 |
| Date | Event |
|---|---|
| 2019-01-09 | Obtained License |
| 2019-02-05 | Direction Drilling Operation Performed - Deviate |
| 2019-02-05 | Surface Casing Operation Performed |
| 2019-02-20 | Well Log Performed |
| 2019-02-21 | Intermediate Casing Operation Performed |
| 2019-02-23 | Direction Drilling Operation Performed - Horizontal |
| 2019-02-23 | Well Log Performed |
| 2019-03-05 | Finished Drilling |
| 2019-03-05 | Well Log Performed |
| 2019-03-05 | Well Mode changed to Drilled and Cased |
| 2019-03-06 | Well Log Performed |
| 2019-03-08 | Production Casing Operation Performed |
| 2019-03-08 | Rig Released |
| 2019-08-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-16 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-17 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-18 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-19 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-20 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-21 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-22 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-23 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-24 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-25 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-26 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-27 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-28 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-29 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-30 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-31 | Perforation Treatment Performed - Jet Perforation |
| 2019-08-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-09-01 | Perforation Treatment Performed - Jet Perforation |
| 2019-09-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-09-02 | Perforation Treatment Performed - Jet Perforation |
| 2019-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-09-03 | Perforation Treatment Performed - Jet Perforation |
| 2019-09-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-09-14 | Well Began Production |
| 2019-09-14 | Well Fluid changed to Gas |
| 2019-09-14 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-02-05 | 369.90 | Deviate (5 - 79 degrees) |
| 2019-02-23 | 3550.50 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-08-15 | Multi-Stage Fracture | 6216.30 | 6217.20 | 0 |
| 2019-08-16 | Perforation | 6081.00 | 6081.50 | 4 |
| 2019-08-24 | Perforation | 5005.00 | 5005.50 | 5 |
| 2019-08-24 | Perforation | 4991.00 | 4991.50 | 3 |
| 2019-08-24 | Perforation | 4977.00 | 4977.50 | 3 |
| 2019-08-24 | Multi-Stage Fracture | 4977.00 | 5034.50 | 0 |
| 2019-08-25 | Perforation | 4963.00 | 4963.50 | 4 |
| 2019-08-25 | Perforation | 4949.00 | 4949.50 | 5 |
| 2019-08-25 | Perforation | 4934.00 | 4934.50 | 5 |
| 2019-08-25 | Perforation | 4920.00 | 4920.50 | 3 |
| 2019-08-25 | Perforation | 4906.00 | 4906.50 | 3 |
| 2019-08-25 | Multi-Stage Fracture | 4906.00 | 4963.50 | 0 |
| 2019-08-16 | Perforation | 6066.00 | 6066.50 | 5 |
| 2019-08-25 | Perforation | 4891.00 | 4891.50 | 5 |
| 2019-08-25 | Perforation | 4877.00 | 4877.50 | 5 |
| 2019-08-25 | Perforation | 4863.00 | 4863.50 | 4 |
| 2019-08-25 | Perforation | 4848.00 | 4848.50 | 3 |
| 2019-08-25 | Perforation | 4835.00 | 4835.50 | 3 |
| 2019-08-25 | Multi-Stage Fracture | 4835.00 | 4891.50 | 0 |
| 2019-08-25 | Perforation | 4819.00 | 4819.50 | 5 |
| 2019-08-25 | Perforation | 4805.00 | 4805.50 | 5 |
| 2019-08-25 | Perforation | 4789.00 | 4789.50 | 4 |
| 2019-08-25 | Perforation | 4775.00 | 4775.50 | 3 |
| 2019-08-16 | Perforation | 6053.00 | 6053.50 | 5 |
| 2019-08-25 | Perforation | 4761.00 | 4761.50 | 3 |
| 2019-08-25 | Multi-Stage Fracture | 4761.00 | 4819.50 | 0 |
| 2019-08-26 | Perforation | 4746.00 | 4746.50 | 5 |
| 2019-08-26 | Perforation | 4731.00 | 4731.50 | 4 |
| 2019-08-26 | Perforation | 4718.00 | 4718.50 | 4 |
| 2019-08-26 | Perforation | 4703.00 | 4703.50 | 4 |
| 2019-08-26 | Perforation | 4690.00 | 4690.50 | 3 |
| 2019-08-26 | Multi-Stage Fracture | 4690.00 | 4746.50 | 0 |
| 2019-08-27 | Perforation | 4675.00 | 4675.50 | 5 |
| 2019-08-27 | Perforation | 4660.00 | 4660.50 | 4 |
| 2019-08-16 | Multi-Stage Fracture | 6053.00 | 6110.50 | 0 |
| 2019-08-27 | Perforation | 4646.00 | 4646.50 | 4 |
| 2019-08-27 | Perforation | 4632.00 | 4632.50 | 4 |
| 2019-08-27 | Perforation | 4618.00 | 4618.50 | 3 |
| 2019-08-27 | Multi-Stage Fracture | 4618.00 | 4675.50 | 0 |
| 2019-08-27 | Perforation | 4547.00 | 4547.50 | 3 |
| 2019-08-27 | Perforation | 4560.00 | 4560.50 | 3 |
| 2019-08-27 | Perforation | 4574.00 | 4574.50 | 5 |
| 2019-08-27 | Perforation | 4589.00 | 4589.50 | 5 |
| 2019-08-27 | Perforation | 4603.00 | 4603.50 | 4 |
| 2019-08-27 | Multi-Stage Fracture | 4547.00 | 4603.50 | 0 |
| 2019-08-17 | Perforation | 6038.00 | 6038.50 | 3 |
| 2019-08-28 | Perforation | 4531.00 | 4531.50 | 5 |
| 2019-08-28 | Perforation | 4517.00 | 4517.50 | 5 |
| 2019-08-28 | Perforation | 4502.00 | 4502.50 | 4 |
| 2019-08-28 | Perforation | 4488.00 | 4488.50 | 3 |
| 2019-08-28 | Perforation | 4474.00 | 4474.50 | 3 |
| 2019-08-28 | Multi-Stage Fracture | 4474.00 | 4531.50 | 0 |
| 2019-08-29 | Perforation | 4459.00 | 4459.50 | 5 |
| 2019-08-29 | Perforation | 4444.00 | 4444.50 | 5 |
| 2019-08-29 | Perforation | 4430.00 | 4430.50 | 4 |
| 2019-08-29 | Perforation | 4416.00 | 4416.50 | 3 |
| 2019-08-17 | Perforation | 6023.00 | 6023.50 | 4 |
| 2019-08-29 | Perforation | 4402.00 | 4402.50 | 3 |
| 2019-08-29 | Multi-Stage Fracture | 4402.00 | 4459.50 | 0 |
| 2019-08-30 | Perforation | 4387.00 | 4387.50 | 5 |
| 2019-08-30 | Perforation | 4372.00 | 4372.50 | 5 |
| 2019-08-30 | Perforation | 4358.00 | 4358.50 | 4 |
| 2019-08-30 | Perforation | 4343.00 | 4343.50 | 3 |
| 2019-08-30 | Perforation | 4330.00 | 4330.50 | 3 |
| 2019-08-30 | Multi-Stage Fracture | 4330.00 | 4387.50 | 0 |
| 2019-08-30 | Perforation | 4313.00 | 4313.50 | 5 |
| 2019-08-30 | Perforation | 4298.00 | 4298.50 | 4 |
| 2019-08-17 | Perforation | 6009.00 | 6009.50 | 4 |
| 2019-08-30 | Perforation | 4284.00 | 4284.50 | 4 |
| 2019-08-30 | Perforation | 4270.00 | 4270.50 | 4 |
| 2019-08-30 | Perforation | 4257.00 | 4257.50 | 3 |
| 2019-08-30 | Multi-Stage Fracture | 4257.00 | 4313.50 | 0 |
| 2019-08-30 | Perforation | 4241.00 | 4241.50 | 5 |
| 2019-08-30 | Perforation | 4227.00 | 4227.50 | 4 |
| 2019-08-30 | Perforation | 4212.00 | 4212.50 | 4 |
| 2019-08-30 | Perforation | 4198.00 | 4198.50 | 4 |
| 2019-08-30 | Perforation | 4185.00 | 4185.50 | 3 |
| 2019-08-30 | Multi-Stage Fracture | 4185.00 | 4241.50 | 0 |
| 2019-08-17 | Perforation | 5995.00 | 5995.50 | 4 |
| 2019-08-31 | Perforation | 4169.00 | 4169.50 | 4 |
| 2019-08-31 | Perforation | 4155.00 | 4155.50 | 5 |
| 2019-08-31 | Perforation | 4140.00 | 4140.50 | 5 |
| 2019-08-31 | Perforation | 4126.00 | 4126.50 | 3 |
| 2019-08-31 | Perforation | 4113.00 | 4113.50 | 3 |
| 2019-08-31 | Multi-Stage Fracture | 4113.00 | 4169.50 | 0 |
| 2019-08-31 | Perforation | 4097.00 | 4097.50 | 4 |
| 2019-08-31 | Perforation | 4083.00 | 4083.50 | 5 |
| 2019-08-31 | Perforation | 4069.00 | 4069.50 | 5 |
| 2019-08-31 | Perforation | 4054.00 | 4054.50 | 3 |
| 2019-08-17 | Perforation | 5981.00 | 5981.50 | 5 |
| 2019-08-31 | Perforation | 4041.00 | 4041.50 | 3 |
| 2019-08-31 | Multi-Stage Fracture | 4041.00 | 4097.50 | 0 |
| 2019-08-31 | Perforation | 4025.00 | 4025.50 | 5 |
| 2019-08-31 | Perforation | 4011.00 | 4011.50 | 5 |
| 2019-08-31 | Perforation | 3997.00 | 3997.50 | 4 |
| 2019-08-31 | Perforation | 3982.00 | 3982.50 | 3 |
| 2019-08-31 | Perforation | 3969.00 | 3969.50 | 3 |
| 2019-08-31 | Multi-Stage Fracture | 3969.00 | 4025.50 | 0 |
| 2019-09-01 | Perforation | 3925.00 | 3925.50 | 4 |
| 2019-09-01 | Perforation | 3911.00 | 3911.50 | 3 |
| 2019-08-17 | Multi-Stage Fracture | 5981.00 | 6038.50 | 0 |
| 2019-09-01 | Perforation | 3897.00 | 3897.50 | 3 |
| 2019-09-01 | Perforation | 3953.00 | 3953.50 | 5 |
| 2019-09-01 | Perforation | 3939.00 | 3939.50 | 5 |
| 2019-09-01 | Multi-Stage Fracture | 3897.00 | 3953.50 | 0 |
| 2019-09-01 | Perforation | 3882.00 | 3882.50 | 5 |
| 2019-09-01 | Perforation | 3867.00 | 3867.50 | 4 |
| 2019-09-01 | Perforation | 3853.00 | 3853.50 | 4 |
| 2019-09-01 | Perforation | 3837.00 | 3837.50 | 4 |
| 2019-09-01 | Perforation | 3824.00 | 3824.50 | 3 |
| 2019-09-01 | Multi-Stage Fracture | 3824.00 | 3882.50 | 0 |
| 2019-08-16 | Perforation | 6181.00 | 6181.50 | 3 |
| 2019-08-17 | Perforation | 5966.00 | 5966.50 | 3 |
| 2019-09-01 | Perforation | 3808.00 | 3808.50 | 5 |
| 2019-09-01 | Perforation | 3794.00 | 3794.50 | 4 |
| 2019-09-01 | Perforation | 3780.00 | 3780.50 | 4 |
| 2019-09-01 | Perforation | 3765.00 | 3765.50 | 4 |
| 2019-09-01 | Perforation | 3752.00 | 3752.50 | 3 |
| 2019-09-01 | Multi-Stage Fracture | 3752.00 | 3808.50 | 0 |
| 2019-09-02 | Perforation | 3736.00 | 3736.50 | 4 |
| 2019-09-02 | Perforation | 3722.00 | 3722.50 | 5 |
| 2019-09-02 | Perforation | 3708.00 | 3708.50 | 5 |
| 2019-09-02 | Perforation | 3694.00 | 3694.50 | 3 |
| 2019-08-17 | Perforation | 5941.00 | 5941.50 | 4 |
| 2019-09-02 | Perforation | 3681.00 | 3681.50 | 3 |
| 2019-09-02 | Multi-Stage Fracture | 3681.00 | 3736.50 | 0 |
| 2019-09-02 | Perforation | 3665.00 | 3665.50 | 4 |
| 2019-09-02 | Perforation | 3651.00 | 3651.50 | 5 |
| 2019-09-02 | Perforation | 3637.00 | 3637.50 | 5 |
| 2019-09-02 | Perforation | 3623.00 | 3623.50 | 3 |
| 2019-09-02 | Perforation | 3609.00 | 3609.50 | 3 |
| 2019-09-02 | Multi-Stage Fracture | 3609.00 | 3665.50 | 0 |
| 2019-09-03 | Perforation | 3594.00 | 3594.50 | 5 |
| 2019-09-03 | Perforation | 3580.00 | 3580.50 | 5 |
| 2019-08-17 | Perforation | 5937.00 | 5937.50 | 4 |
| 2019-09-03 | Perforation | 3565.00 | 3565.50 | 4 |
| 2019-09-03 | Perforation | 3551.00 | 3551.50 | 3 |
| 2019-09-03 | Perforation | 3538.00 | 3538.50 | 3 |
| 2019-09-03 | Multi-Stage Fracture | 3538.00 | 3594.50 | 0 |
| 2019-09-03 | Perforation | 3522.00 | 3522.50 | 5 |
| 2019-09-03 | Perforation | 3508.00 | 3508.50 | 5 |
| 2019-09-03 | Perforation | 3494.00 | 3494.50 | 4 |
| 2019-09-03 | Perforation | 3480.00 | 3480.50 | 3 |
| 2019-09-03 | Perforation | 3466.00 | 3466.50 | 3 |
| 2019-09-03 | Multi-Stage Fracture | 3466.00 | 3522.50 | 0 |
| 2019-08-17 | Perforation | 5923.00 | 5923.50 | 4 |
| 2019-09-03 | Perforation | 3451.00 | 3451.50 | 5 |
| 2019-09-03 | Perforation | 3437.00 | 3437.50 | 4 |
| 2019-09-03 | Perforation | 3422.00 | 3422.50 | 3 |
| 2019-08-17 | Perforation | 5909.00 | 5909.50 | 5 |
| 2019-08-17 | Multi-Stage Fracture | 5909.00 | 5966.50 | 0 |
| 2019-08-18 | Perforation | 5894.00 | 5894.50 | 3 |
| 2019-08-18 | Perforation | 5880.00 | 5880.50 | 3 |
| 2019-08-18 | Perforation | 5866.00 | 5866.50 | 5 |
| 2019-08-18 | Perforation | 5852.00 | 5852.50 | 5 |
| 2019-08-16 | Perforation | 6167.00 | 6167.50 | 3 |
| 2019-08-18 | Perforation | 5838.00 | 5838.50 | 4 |
| 2019-08-18 | Multi-Stage Fracture | 5838.00 | 5894.50 | 0 |
| 2019-08-18 | Perforation | 5823.00 | 5823.50 | 3 |
| 2019-08-18 | Perforation | 5809.00 | 5809.50 | 3 |
| 2019-08-18 | Perforation | 5795.00 | 5795.50 | 5 |
| 2019-08-18 | Perforation | 5780.00 | 5780.50 | 5 |
| 2019-08-18 | Perforation | 5767.00 | 5767.50 | 4 |
| 2019-08-18 | Multi-Stage Fracture | 5767.00 | 5823.50 | 0 |
| 2019-08-19 | Perforation | 5752.00 | 5752.50 | 3 |
| 2019-08-19 | Perforation | 5736.00 | 5736.50 | 3 |
| 2019-08-16 | Perforation | 6153.00 | 6153.50 | 4 |
| 2019-08-19 | Perforation | 5721.00 | 5721.50 | 4 |
| 2019-08-19 | Perforation | 5707.00 | 5707.50 | 5 |
| 2019-08-19 | Perforation | 5694.00 | 5694.50 | 5 |
| 2019-08-19 | Multi-Stage Fracture | 5694.00 | 5752.50 | 0 |
| 2019-08-20 | Perforation | 5679.00 | 5679.50 | 3 |
| 2019-08-20 | Perforation | 5665.00 | 5665.50 | 3 |
| 2019-08-20 | Perforation | 5651.00 | 5651.50 | 4 |
| 2019-08-20 | Perforation | 5636.00 | 5636.50 | 5 |
| 2019-08-20 | Perforation | 5623.00 | 5623.50 | 5 |
| 2019-08-20 | Multi-Stage Fracture | 5623.00 | 5679.50 | 0 |
| 2019-08-16 | Perforation | 6138.00 | 6138.50 | 5 |
| 2019-08-20 | Perforation | 5608.00 | 5608.50 | 5 |
| 2019-08-20 | Perforation | 5593.00 | 5593.50 | 4 |
| 2019-08-20 | Perforation | 5579.00 | 5579.50 | 4 |
| 2019-08-20 | Perforation | 5565.00 | 5565.50 | 4 |
| 2019-08-20 | Perforation | 5551.00 | 5551.50 | 3 |
| 2019-08-20 | Multi-Stage Fracture | 5551.00 | 5608.50 | 0 |
| 2019-08-21 | Perforation | 5536.00 | 5536.50 | 5 |
| 2019-08-21 | Perforation | 5522.00 | 5522.50 | 4 |
| 2019-08-21 | Perforation | 5508.00 | 5508.50 | 4 |
| 2019-08-21 | Perforation | 5493.00 | 5493.50 | 4 |
| 2019-08-16 | Perforation | 6125.00 | 6125.50 | 5 |
| 2019-08-21 | Perforation | 5480.00 | 5480.50 | 3 |
| 2019-08-21 | Multi-Stage Fracture | 5480.00 | 5536.50 | 0 |
| 2019-08-21 | Perforation | 5464.00 | 5464.50 | 4 |
| 2019-08-21 | Perforation | 5450.00 | 5450.50 | 5 |
| 2019-08-21 | Perforation | 5435.00 | 5435.50 | 5 |
| 2019-08-21 | Perforation | 5421.00 | 5421.50 | 3 |
| 2019-08-21 | Perforation | 5407.00 | 5407.50 | 3 |
| 2019-08-21 | Multi-Stage Fracture | 5407.00 | 5464.50 | 0 |
| 2019-08-22 | Perforation | 5393.00 | 5393.50 | 4 |
| 2019-08-22 | Perforation | 5378.00 | 5378.50 | 5 |
| 2019-08-16 | Multi-Stage Fracture | 6125.00 | 6181.50 | 0 |
| 2019-08-22 | Perforation | 5364.00 | 5364.50 | 5 |
| 2019-08-22 | Perforation | 5349.00 | 5349.50 | 3 |
| 2019-08-22 | Perforation | 5336.00 | 5336.50 | 3 |
| 2019-08-22 | Multi-Stage Fracture | 5336.00 | 5393.50 | 0 |
| 2019-08-22 | Perforation | 5321.00 | 5321.50 | 5 |
| 2019-08-22 | Perforation | 5306.00 | 5306.50 | 5 |
| 2019-08-22 | Perforation | 5292.00 | 5292.50 | 4 |
| 2019-08-22 | Perforation | 5278.00 | 5278.50 | 3 |
| 2019-08-22 | Perforation | 5263.00 | 5263.50 | 3 |
| 2019-08-22 | Multi-Stage Fracture | 5263.00 | 5321.50 | 0 |
| 2019-08-16 | Perforation | 6110.00 | 6110.50 | 3 |
| 2019-08-23 | Perforation | 5248.00 | 5248.50 | 5 |
| 2019-08-23 | Perforation | 5235.00 | 5235.50 | 5 |
| 2019-08-23 | Perforation | 5220.00 | 5220.50 | 4 |
| 2019-08-23 | Perforation | 5206.00 | 5206.50 | 3 |
| 2019-08-23 | Perforation | 5193.00 | 5193.50 | 3 |
| 2019-08-23 | Multi-Stage Fracture | 5193.00 | 5248.50 | 0 |
| 2019-08-23 | Perforation | 5177.00 | 5177.50 | 5 |
| 2019-08-23 | Perforation | 5163.00 | 5163.50 | 4 |
| 2019-08-23 | Perforation | 5149.00 | 5149.50 | 4 |
| 2019-08-23 | Perforation | 5135.00 | 5135.50 | 4 |
| 2019-08-16 | Perforation | 6095.00 | 6095.50 | 3 |
| 2019-08-23 | Perforation | 5121.00 | 5121.50 | 3 |
| 2019-08-23 | Multi-Stage Fracture | 5121.00 | 5177.50 | 0 |
| 2019-08-23 | Perforation | 5077.00 | 5077.50 | 4 |
| 2019-08-24 | Perforation | 5106.00 | 5106.50 | 5 |
| 2019-08-24 | Perforation | 5091.00 | 5091.50 | 4 |
| 2019-08-24 | Perforation | 5063.00 | 5063.50 | 4 |
| 2019-08-24 | Perforation | 5050.00 | 5050.50 | 3 |
| 2019-08-24 | Multi-Stage Fracture | 5050.00 | 5106.50 | 0 |
| 2019-08-24 | Perforation | 5034.00 | 5034.50 | 4 |
| 2019-08-24 | Perforation | 5020.00 | 5020.50 | 5 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-08-15 | 2019-09-03 | 3,344 | 38,927 | N/A |
| 2 | 2019-08-19 | 2019-09-01 | 3,344 | 0 | N/A |
| 3 | 2019-08-16 | 2019-08-16 | 3,344 | 0 | N/A |
| 4 | 2019-08-31 | 2019-09-03 | 3,344 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 86.7125 | N/A | |||
| 40/70 Premium | Halliburton | Crystalline silica. quartz | 14808-60-7 | 100 | 13.1872 | N/A | ||
| MC B-8510 | Mutli-Chem | Bactericide/Biocide | 2.2 Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0085 | N/A | |
| 2.2-Dibromomalonamide | 73003-80-2 | 100 | 0.0085 | N/A | ||||
| 2-Monobromo-3-nitrilopropionamide | 1113-55-9 | 100 | 0.0085 | N/A | ||||
| Dibromoacetonitrile | 3252-43-5 | 100 | 0.0085 | N/A | ||||
| Inert Ingredient(s) | Not Available | 100 | 0.0085 | N/A | ||||
| FightR EC-1 | Halliburton | Friction Reducer | Inert Ingredient(s) | Not Available | 100 | 0.0841 | N/A | |
| 2 | OptiKleen WF | Halliburton | Breaker | Inert Ingredient(s) | Not Available | 100 | 0.0033 | N/A |
| Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0033 | N/A | ||||
| 3 | Excelerate LX-1 | Halliburton | Friction Reducer | Complex Amine Compound | Trade Secret | 100 | 0.0939 | N/A |
| Hydrotreated light petroleum distillate | 64742-47-8 | 100 | 0.0939 | N/A | ||||
| Inert Ingredient(s) | Not Available | 100 | 0.0939 | N/A | ||||
| 4 | FDP-S1346-18 | Halliburton | Friction Reducer | Inert Ingredient(s) | Not Available | 100 | 0.0384 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-07-16 | 2019-09-04 | Surface Water - River | 38794 |
| 2019-07-16 | 2019-09-04 | Recycled Fracturing Water (treated at independent stand-alone facility) | 133 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 2328 | 0.0 | 0.0 | 0.0 |
| 2020 | 1972 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-03-08 | No Incident Encountered | 0.00 | 0.00 |
| 2019-09-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]