X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626050709000

Well Details

Well ID: 0626050709000
Loading map...
Location: 00/09-07-062-05W6/0
Location Alias: 00/09-07-62-05 W6M
Location Alias 2: 00/09-07-062-05 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 05
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 9-7-62-5
Operator Name: Tourmaline Oil Corp.
License Number: 0484873
License Date: 2017-08-03
License Status: Issued
Spud Date: 2018-01-02
Final Drill Date: 2018-01-22
Well Total Depth: 4572.00 m
Surface Hole Latitude: 54.353766
Surface Hole Longitude: -118.750704

For data sources see[1][2]

Well History

Date Event
2017-08-03 Obtained License
2018-01-04 Surface Casing Operation Performed
2018-01-07 Intermediate Casing Operation Performed
2018-01-11 Direction Drilling Operation Performed - Deviate
2018-01-13 Direction Drilling Operation Performed - Horizontal
2018-01-18 Well Log Performed
2018-01-22 Finished Drilling
2018-01-22 Well Log Performed
2018-01-22 Well Mode changed to Drilled and Cased
2018-01-23 Production Casing Operation Performed
2018-01-24 Rig Released
2018-02-22 Well Log Performed
2018-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-06 Well Began Production
2018-03-06 Well Fluid changed to Gas
2018-03-06 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-02 Citadel Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-11 2843.70 Deviate (5 - 79 degrees)
2018-01-13 3153.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-04 Multi-Stage Fracture 4528.80 4528.90 0
2018-03-04 Multi-Stage Fracture 4051.50 4051.60 0
2018-03-04 Multi-Stage Fracture 3998.70 3998.80 0
2018-03-04 Multi-Stage Fracture 3945.70 3945.80 0
2018-03-04 Multi-Stage Fracture 3892.70 3892.80 0
2018-03-04 Multi-Stage Fracture 3839.80 3839.90 0
2018-03-04 Multi-Stage Fracture 3786.90 3787.00 0
2018-03-04 Multi-Stage Fracture 3734.10 3734.20 0
2018-03-04 Multi-Stage Fracture 3681.20 3681.30 0
2018-03-04 Multi-Stage Fracture 3625.20 3625.30 0
2018-03-04 Multi-Stage Fracture 3575.40 3575.50 0
2018-03-04 Multi-Stage Fracture 4474.30 4474.40 0
2018-03-05 Multi-Stage Fracture 3522.40 3522.50 0
2018-03-05 Multi-Stage Fracture 3469.50 3469.60 0
2018-03-05 Multi-Stage Fracture 3416.60 3416.70 0
2018-03-05 Multi-Stage Fracture 3363.60 3363.70 0
2018-03-05 Multi-Stage Fracture 3310.70 3310.80 0
2018-03-05 Multi-Stage Fracture 3257.80 3257.90 0
2018-03-04 Multi-Stage Fracture 4421.40 4421.50 0
2018-03-04 Multi-Stage Fracture 4368.50 4368.60 0
2018-03-04 Multi-Stage Fracture 4315.60 4315.70 0
2018-03-04 Multi-Stage Fracture 4262.60 4262.70 0
2018-03-04 Multi-Stage Fracture 4210.10 4210.20 0
2018-03-04 Multi-Stage Fracture 4157.20 4157.30 0
2018-03-04 Multi-Stage Fracture 4104.40 4104.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-04 2018-03-05 3,047 6,612 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.5863 N/A
40/70 Prime Plus Calfrac Quartz 14808-60-7 100 3.1584 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.4299 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.5837 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0117 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0117 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0117 N/A
Polyethylene glycol 25322-68-3 100 0.0117 N/A
Sodium bromide 7647-15-6 100 0.0117 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0712 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0759 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0759 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0826 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-03 2018-03-03 Recycled Fracturing Water (treated at well site) 6612

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6512 0.0 0.0 0.0
2019 8643 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-22 No Incident Encountered 0.00 0.00
2018-03-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References