If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626071706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.362197,"lon":-119.017105,"icon":""}]} |
Location: 00/06-17-062-07W6/0 | |
Location Alias: 00/06-17-62-07 W6M | |
Location Alias 2: 00/06-17-062-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 07 | |
Section: 17 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE ROUTE 6-17-62-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0356898 | |
License Date: 2006-05-08 | |
License Status: Issued | |
Spud Date: 2006-07-06 | |
Final Drill Date: 2006-07-20 | |
Well Total Depth: 1866.00 m | |
Surface Hole Latitude: 54.362197 | |
Surface Hole Longitude: -119.017105 |
Date | Event |
---|---|
2006-05-08 | Obtained License |
2006-07-07 | Surface Casing Operation Performed |
2006-07-10 | Lost Circulation Occurred |
2006-07-20 | Finished Drilling |
2006-07-20 | Well Mode changed to Drilled and Cased |
2006-07-21 | Well Log Performed |
2006-07-23 | Production Casing Operation Performed |
2006-07-23 | Rig Released |
2006-09-21 | Well Log Performed |
2006-09-23 | Perforation Treatment Performed - Jet Perforation |
2006-09-23 | Well Log Performed |
2006-09-25 | Perforation Treatment Performed - Fractured |
2006-10-04 | Perforation Treatment Performed - Jet Perforation |
2006-10-05 | Perforation Treatment Performed - Remedial Casing |
2006-10-06 | Perforation Treatment Performed - Jet Perforation |
2006-10-06 | Perforation Treatment Performed - Remedial Casing |
2006-10-07 | Perforation Treatment Performed - Jet Perforation |
2006-10-07 | Perforation Treatment Performed - Remedial Casing |
2006-10-08 | Perforation Treatment Performed - Jet Perforation |
2006-10-08 | Perforation Treatment Performed - Remedial Casing |
2006-10-09 | Perforation Treatment Performed - Jet Perforation |
2006-10-09 | Perforation Treatment Performed - Remedial Casing |
2006-10-09 | Well Log Performed |
2008-03-24 | Well Began Production |
2008-03-24 | Well Fluid changed to Gas |
2008-03-24 | Well Mode changed to Flowing |
2017-01-01 | Well Fluid changed to Gas |
2017-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-23 | Perforation | 1838.00 | 1842.00 | 17 |
2006-10-07 | Perforation | 585.00 | 585.50 | 8 |
2006-10-07 | Remedial Casing Cementing | 585.00 | 602.50 | 0 |
2006-10-08 | Perforation | 506.00 | 506.50 | 8 |
2006-10-08 | Remedial Casing Cementing | 506.00 | 506.50 | 0 |
2006-10-09 | Perforation | 379.00 | 379.50 | 8 |
2006-10-09 | Remedial Casing Cementing | 379.00 | 379.50 | 0 |
2006-09-23 | Perforation | 1835.00 | 1837.00 | 17 |
2006-09-25 | Fracture | 1835.00 | 1842.00 | 0 |
2006-10-04 | Perforation | 890.00 | 890.50 | 8 |
2006-10-05 | Remedial Casing Cementing | 890.00 | 890.50 | 0 |
2006-10-06 | Perforation | 860.00 | 860.50 | 8 |
2006-10-06 | Perforation | 850.00 | 850.50 | 8 |
2006-10-06 | Remedial Casing Cementing | 850.00 | 860.50 | 0 |
2006-10-07 | Perforation | 602.00 | 602.50 | 8 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 5708 | 0.0 | 0.0 | 0.0 |
2009 | 7587 | 0.0 | 0.0 | 0.0 |
2010 | 8041 | 0.0 | 0.0 | 0.0 |
2011 | 5963 | 0.0 | 0.0 | 0.0 |
2012 | 6292 | 0.0 | 0.0 | 0.0 |
2013 | 5722 | 0.0 | 0.0 | 0.0 |
2014 | 8155 | 0.0 | 0.0 | 0.0 |
2015 | 8725 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8427 | 0.0 | 0.0 | 0.0 |
2018 | 8701 | 0.0 | 0.0 | 0.0 |
2019 | 8275 | 0.0 | 0.0 | 0.0 |
2020 | 1709 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2006-07-10 | Lost Circulation | 668.00 | 668.00 |
For data sources see[6]