X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634140807003

Well Details

Well ID: 0634140807003
Loading map...
Location: 00/07-08-063-14W4/3
Location Alias: 00/07-08-63-14 W4M
Location Alias 2: 00/07-08-063-14 W4/03
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 14
Section: 08
County/Municipality: Kikino Metis Settlement
Well Name: SOC CRAIGND 7-8-63-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0021414
License Date: 1961-09-27
License Status: Suspension
Spud Date: 1962-02-10
Final Drill Date: 1962-02-26
Well Total Depth: 513.60 m
Surface Hole Latitude: 54.432939
Surface Hole Longitude: -112.081756

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-09-27 Obtained License
1962-02-13 Drill Stem Test Performed
1962-02-14 Blow Occurred
1962-02-17 Production Casing Operation Performed
1962-02-19 Perforation Treatment Performed - Jet Perforation
1962-02-19 Perforation Treatment Performed - Remedial Casing
1962-02-23 Drill Stem Test Performed
1962-02-24 Drill Stem Test Performed
1962-02-26 Finished Drilling
1962-02-26 Perforation Treatment Performed - Open-Hole Completion
1962-02-26 Well Mode changed to Drilled and Cased
1967-09-24 Perforation Treatment Performed - Cement Plug
1967-09-24 Perforation Treatment Performed - Open-Hole Completion
1967-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-19 Perforation Treatment Performed - Jet Perforation
1980-11-21 Perforation Treatment Performed - Jet Perforation
1980-11-23 Well Began Production
1980-11-23 Well Fluid changed to Gas
1980-11-23 Well Mode changed to Flowing
1987-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-03-04 Plug Back Performed
1987-03-06 Perforation Treatment Performed - Jet Perforation
1995-11-01 Well Fluid changed to Gas
1995-11-01 Well Mode changed to Suspended
1996-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-03 Perforation Treatment Performed - Jet Perforation
1996-02-03 Plug Back Performed
1996-02-03 Well Fluid changed to Gas
1996-02-03 Well Mode changed to Abandoned Zone
2007-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-02-19 Perforation 438.90 440.40 11
1980-11-21 Perforation 379.40 380.00 9
1987-03-04 Packing Device Capped w/Cement 399.00 407.00 0
1987-03-06 Perforation 370.60 371.90 13
1996-02-03 Packing Device Capped w/Cement 375.50 378.50 0
1996-02-03 Perforation 370.60 371.90 13
2007-09-24 Packing Device Capped w/Cement 355.00 363.00 0
1962-02-19 Remedial Casing Cementing 438.90 440.40 0
1962-02-26 Open Hole/Barefoot Completion 489.20 513.60 0
1967-09-24 Cement Plug 496.80 513.60 0
1967-09-24 Open Hole/Barefoot Completion 489.20 496.80 0
1967-09-25 Acid Treatment 489.20 496.80 0
1980-11-19 Packing Device Capped w/Cement 470.00 470.00 0
1980-11-19 Perforation 413.50 414.10 12
1980-11-19 Acid Treatment 413.50 414.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 978 0.0 0.0 0.0
1982 3854 0.0 0.0 0.0
1983 1052 0.0 0.0 0.0
1984 82 0.0 0.0 0.0
1985 819 0.0 0.0 0.0
1987 3116 0.0 0.0 0.0
1988 6453 0.0 0.0 0.0
1989 3431 0.0 0.0 0.0
1990 1052 0.0 0.0 0.0
1991 1069 0.0 0.0 0.0
1992 2366 0.0 0.0 0.0
1993 6602 0.0 0.0 0.0
1994 2716 0.0 0.0 0.0
1995 1584 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-02-14 Blow 491.60 491.60

For data sources see[6]

References