X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634140910002

Well Details

Well ID: 0634140910002
Loading map...
Location: 00/10-09-063-14W4/2
Location Alias: 00/10-09-63-14 W4M
Location Alias 2: 00/10-09-063-14 W4/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 14
Section: 09
County/Municipality: Kikino Metis Settlement
Well Name: SOC CRAIGND 10-9-63-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0185094
License Date: 1996-01-26
License Status: Amended
Spud Date: 1996-02-24
Final Drill Date: 1996-02-26
Well Total Depth: 480.00 m
Surface Hole Latitude: 54.436378
Surface Hole Longitude: -112.054027

For data sources see[1][2]

Well History

Date Event
1996-01-26 Obtained License
1996-02-25 Surface Casing Operation Performed
1996-02-26 Finished Drilling
1996-02-26 Production Casing Operation Performed
1996-02-26 Well Log Performed
1996-02-26 Well Mode changed to Drilled and Cased
1996-02-27 Rig Released
1996-03-02 Perforation Treatment Performed - Open-Hole Completion
1996-03-04 Perforation Treatment Performed - Acid Wash - No Pressure
1996-03-05 Perforation Treatment Performed - Open-Hole Completion
1996-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-06 Perforation Treatment Performed - Jet Perforation
1996-10-06 Plug Back Performed
1996-10-06 Well Fluid changed to Gas
1996-10-06 Well Mode changed to Testing
1996-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-14 Perforation Treatment Performed - Jet Perforation
1996-11-14 Plug Back Performed
1996-11-14 Well Fluid changed to Gas
1996-11-14 Well Mode changed to Abandoned Zone
1997-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-05 Perforation Treatment Performed - Jet Perforation
1997-08-05 Plug Back Performed
2004-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-19 Perforation Treatment Performed - Jet Perforation
2004-07-19 Well Log Performed
2004-07-20 Well Log Performed
2004-07-21 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-02 Open Hole/Barefoot Completion 470.00 477.00 0
1997-08-05 Packing Device Capped w/Cement 363.00 366.00 0
1997-08-05 Perforation 359.00 359.50 13
2004-07-19 Perforation 367.00 368.50 26
2004-07-19 Packing Device Capped w/Cement 367.50 370.50 0
2004-07-19 Packing Device Capped w/Cement 357.00 365.00 0
2004-07-19 Packing Device Capped w/Cement 352.80 355.90 0
2004-07-21 Perforation 330.50 331.50 17
2004-07-21 Perforation 325.00 327.00 17
2004-07-21 Perforation 322.50 324.00 17
1996-03-04 Acid Wash 473.00 477.00 0
1996-03-05 Open Hole/Barefoot Completion 470.00 480.00 0
1996-10-06 Packing Device Capped w/Cement 457.00 465.00 0
1996-10-06 Perforation 417.50 420.50 13
1996-10-06 Packing Device Capped w/Cement 409.00 417.00 0
1996-10-06 Perforation 402.00 403.00 26
1996-11-14 Packing Device Capped w/Cement 392.00 400.00 0
1996-11-14 Perforation 367.00 368.50 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 348 0.0 0.0 0.0

For data sources see[5]

References