If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0634173012000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/12-30-063-17W4/0 | |
Location Alias: 00/12-30-63-17 W4M | |
Location Alias 2: 00/12-30-063-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 4 | |
Range: 17 | |
Section: 30 | |
County/Municipality: Buffalo Lake Metis Settlement | |
Well Name: ACL FIGURE LAKE 12-30-63-17 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0185799 | |
License Date: 1996-02-14 | |
License Status: RecCertified | |
Spud Date: 1996-03-05 | |
Final Drill Date: 1996-03-07 | |
Well Total Depth: 658.00 m | |
Surface Hole Latitude: 54.478984 | |
Surface Hole Longitude: -112.570590 |
Date | Event |
---|---|
1996-02-14 | Obtained License |
1996-03-06 | Surface Casing Operation Performed |
1996-03-07 | Finished Drilling |
1996-03-07 | Production Casing Operation Performed |
1996-03-07 | Well Log Performed |
1996-03-07 | Well Mode changed to Drilled and Cased |
1996-03-08 | Rig Released |
1996-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-03-11 | Perforation Treatment Performed - Jet Perforation |
1996-03-11 | Perforation Treatment Performed - Open-Hole Completion |
1996-03-11 | Plug Back Performed |
1996-12-01 | Well Began Production |
1996-12-01 | Well Fluid changed to Gas |
1996-12-01 | Well Mode changed to Flowing |
1998-02-16 | Well Fluid changed to Gas |
1998-02-16 | Well Mode changed to Suspended |
1998-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-02-18 | Perforation Treatment Performed - Jet Perforation |
1998-02-18 | Plug Back Performed |
1998-02-18 | Well Fluid changed to Gas |
1998-02-18 | Well Mode changed to Abandoned Zone |
1998-02-21 | Well Abandoned |
1998-02-21 | Well Fluid changed to Gas |
1998-02-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-11 | Open Hole/Barefoot Completion | 657.00 | 658.00 | 0 |
1996-03-11 | Packing Device Capped w/Cement | 644.00 | 652.00 | 0 |
1996-03-11 | Perforation | 641.00 | 642.00 | 14 |
1998-02-18 | Packing Device Capped w/Cement | 631.00 | 639.00 | 0 |
1998-02-18 | Perforation | 477.50 | 478.00 | 13 |
1998-02-18 | Packing Device Capped w/Cement | 467.00 | 475.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 663 | 0.0 | 0.0 | 0.0 |
1997 | 3337 | 0.0 | 0.0 | 0.0 |
For data sources see[5]