If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635102104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.459989,"lon":-115.459095,"icon":""}]} |
Location: 00/04-21-063-10W5/0 | |
Location Alias: 00/04-21-63-10 W5M | |
Location Alias 2: 00/04-21-063-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 10 | |
Section: 21 | |
County/Municipality: Woodlands County | |
Well Name: ACCEL JUDYCK 4-21-63-10 | |
Operator Name: ACCEL Energy Canada Limited | |
License Number: 0017685 | |
License Date: 1959-03-03 | |
License Status: Abandoned | |
Spud Date: 1959-09-07 | |
Final Drill Date: 1959-10-16 | |
Well Total Depth: 2925.50 m | |
Surface Hole Latitude: 54.459989 | |
Surface Hole Longitude: -115.459095 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-03-03 | Obtained License |
1959-10-16 | Finished Drilling |
1959-10-16 | Well Mode changed to Drilled and Cased |
1959-10-19 | Production Casing Operation Performed |
1959-10-26 | Perforation Treatment Performed - Jet Perforation |
1959-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-11-13 | Well Began Production |
1959-11-13 | Well Fluid changed to Crude Oil |
1959-11-13 | Well Mode changed to Flowing |
1972-02-21 | Perforation Treatment Performed - Jet Perforation |
1972-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-02-24 | Well Began Injection |
1972-02-24 | Well Fluid changed to Water |
1972-02-24 | Well Type changed to Injection |
1980-05-10 | Perforation Treatment Performed - Jet Perforation |
1985-01-16 | Well Fluid changed to Water |
1985-01-16 | Well Mode changed to Suspended |
1985-01-16 | Well Type changed to Injection |
2005-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-03-24 | Plug Back Performed |
2005-03-24 | Well Fluid changed to Water |
2005-03-24 | Well Mode changed to Abandoned Zone |
2005-03-24 | Well Type changed to Injection |
2005-03-25 | Perforation Treatment Performed - Cement Plug |
2005-03-25 | Perforation Treatment Performed - Jet Perforation |
2005-03-25 | Plug Back Performed |
2005-03-26 | Perforation Treatment Performed - Cement Plug |
2005-03-26 | Perforation Treatment Performed - Jet Perforation |
2005-03-26 | Plug Back Performed |
2005-03-27 | Perforation Treatment Performed - Cement Plug |
2005-03-27 | Perforation Treatment Performed - Jet Perforation |
2005-03-27 | Plug Back Performed |
2005-03-28 | Perforation Treatment Performed - Cement Plug |
2005-03-28 | Perforation Treatment Performed - Jet Perforation |
2005-03-28 | Plug Back Performed |
2005-05-05 | Well Abandoned |
2005-05-05 | Well Fluid changed to Water |
2005-05-05 | Well Mode changed to Abandoned |
2005-05-05 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-10-26 | Perforation | 2642.00 | 2644.70 | 3 |
2005-03-25 | Cement Plug | 569.80 | 630.00 | 0 |
2005-03-26 | Perforation | 452.00 | 453.00 | 20 |
2005-03-26 | Cement Plug | 418.00 | 466.00 | 0 |
2005-03-27 | Perforation | 351.00 | 352.00 | 20 |
2005-03-27 | Cement Plug | 285.40 | 352.00 | 0 |
2005-03-28 | Perforation | 251.00 | 252.00 | 20 |
2005-03-28 | Cement Plug | 200.00 | 252.00 | 0 |
1959-10-26 | Perforation | 2645.70 | 2646.90 | 3 |
1959-11-12 | Acid Treatment | 2642.00 | 2646.90 | 0 |
1972-02-21 | Perforation | 2634.10 | 2642.00 | 7 |
1972-02-23 | Acid Treatment | 2634.10 | 2642.00 | 0 |
1980-05-10 | Perforation | 2627.40 | 2628.90 | 7 |
1980-05-10 | Perforation | 2629.80 | 2634.10 | 7 |
2005-03-24 | Packing Device Capped w/Cement | 2607.50 | 2615.50 | 0 |
2005-03-25 | Perforation | 615.00 | 616.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]