Well Details

Well ID: 0635103016000
Loading map...
Location: 00/16-30-063-10W5/0
Location Alias: 00/16-30-63-10 W5M
Location Alias 2: 00/16-30-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 30
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 16-30-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0134545
License Date: 1988-06-24
License Status: Issued
Spud Date: 1988-08-06
Final Drill Date: 1988-08-16
Well Total Depth: 2662.00 m
Surface Hole Latitude: 54.485601
Surface Hole Longitude: -115.491438

For data sources see[1][2]

Well History

Date Event
1988-06-24 Obtained License
1988-08-07 Surface Casing Operation Performed
1988-08-16 Finished Drilling
1988-08-16 Well Mode changed to Drilled and Cased
1988-08-17 Well Log Performed
1988-08-18 Kick Occurred
1988-08-19 Production Casing Operation Performed
1988-08-20 Rig Released
1988-09-26 Perforation Treatment Performed - Jet Perforation
1988-09-26 Well Log Performed
1988-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-16 Well Began Production
1988-11-16 Well Fluid changed to Crude Oil
1988-11-16 Well Mode changed to Pumping
1997-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-06 Well Log Performed
2007-02-25 Well Log Performed
2007-09-20 Well Log Performed
2007-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-21 Perforation Treatment Performed - Cement Squeeze
2008-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-05 Perforation Treatment Performed - Jet Perforation
2010-08-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-26 Perforation 2581.00 2595.00 7
2007-09-21 Acid Treatment 2581.00 2595.00 0
2007-09-21 Cement Squeeze 2581.00 2595.00 0
2008-10-31 Acid Treatment 2610.00 2628.00 0
2010-08-05 Perforation 2581.00 2587.00 3
2010-08-05 Perforation 2587.00 2595.00 8
2010-08-05 Acid Treatment 2581.00 2595.00 0
1988-09-26 Perforation 2610.00 2614.00 7
1988-09-26 Perforation 2616.00 2620.00 7
1988-09-26 Perforation 2621.00 2624.00 7
1988-09-26 Perforation 2626.00 2628.00 7
1988-09-26 Perforation 2631.00 2633.00 7
1988-09-29 Acid Treatment 2581.00 2633.00 0
1997-04-30 Acid Treatment 2626.00 2630.00 0
1997-05-06 Packing Device Capped w/Cement 2628.10 2630.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1058 0.0 0.0 0.0
1989 8339 0.0 0.0 0.0
1990 8674 0.0 0.0 0.0
1991 8049 0.0 0.0 0.0
1992 7746 0.0 0.0 0.0
1993 7690 0.0 0.0 0.0
1994 8016 0.0 0.0 0.0
1995 8613 0.0 0.0 0.0
1996 8096 0.0 0.0 0.0
1997 7585 0.0 0.0 0.0
1998 7995 0.0 0.0 0.0
1999 8487 0.0 0.0 0.0
2000 8575 0.0 0.0 0.0
2001 8510 0.0 0.0 0.0
2002 7393 0.0 0.0 0.0
2003 8520 0.0 0.0 0.0
2004 8382 0.0 0.0 0.0
2005 7615 0.0 0.0 0.0
2006 8135 0.0 0.0 0.0
2007 5630 0.0 0.0 0.0
2008 4679 0.0 0.0 0.0
2009 383 0.0 0.0 0.0
2010 3459 0.0 0.0 0.0
2011 8697 0.0 0.0 0.0
2012 8669 0.0 0.0 0.0
2013 8465 0.0 0.0 0.0
2014 8409 0.0 0.0 0.0
2015 7765 0.0 0.0 0.0
2016 8635 0.0 0.0 0.0
2017 8624 0.0 0.0 0.0
2018 8646 0.0 0.0 0.0
2019 8734 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-08-18 Kick 2662.00 2662.00

For data sources see[6]