X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103102000

Well Details

Well ID: 0635103102000
Loading map...
Location: 00/02-31-063-10W5/0
Location Alias: 00/02-31-63-10 W5M
Location Alias 2: 00/02-31-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 31
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 2-31-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0019331
License Date: 1960-07-07
License Status: Issued
Spud Date: 1960-10-31
Final Drill Date: 1960-11-22
Well Total Depth: 2644.10 m
Surface Hole Latitude: 54.488431
Surface Hole Longitude: -115.497637

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-07 Obtained License
1960-11-22 Finished Drilling
1960-11-22 Well Mode changed to Drilled and Cased
1960-11-24 Production Casing Operation Performed
1960-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-29 Perforation Treatment Performed - Jet Perforation
1960-12-01 Well Began Production
1960-12-01 Well Fluid changed to Crude Oil
1960-12-01 Well Mode changed to Flowing
1975-05-27 Well Fluid changed to Crude Oil
1975-05-27 Well Mode changed to Pumping
1976-06-14 Perforation Treatment Performed - Jet Perforation
1976-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-21 Perforation Treatment Performed - Jet Perforation
1979-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-14 Well Fluid changed to Crude Oil
1982-09-14 Well Mode changed to Gas Lift
1985-04-15 Perforation Treatment Performed - Jet Perforation
1985-04-15 Well Log Performed
1985-04-18 Perforation Treatment Performed - Fractured
1985-04-19 Well Log Performed
1989-11-26 Well Fluid changed to Crude Oil
1989-11-26 Well Mode changed to Suspended
1989-11-30 Well Log Performed
1989-12-01 Well Log Performed
1989-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-14 Well Began Injection
1989-12-14 Well Fluid changed to Water
1989-12-14 Well Type changed to Injection
1990-01-14 Well Log Performed
1990-01-17 Well Fluid changed to Solvent
1990-01-17 Well Type changed to Injection
1996-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-29 Perforation 2565.20 2566.70 3
1976-06-14 Perforation 2592.90 2596.90 3
1976-06-14 Perforation 2606.30 2607.90 3
1976-06-14 Perforation 2608.50 2609.40 3
1976-06-19 Acid Treatment 2559.10 2577.70 0
1979-06-21 Perforation 2558.90 2576.00 7
1979-06-21 Perforation 2592.80 2596.80 7
1979-06-21 Perforation 2606.20 2607.70 7
1979-06-21 Perforation 2608.30 2609.30 7
1979-06-27 Acid Treatment 2558.90 2609.40 0
1985-04-15 Perforation 2575.90 2580.10 7
1960-11-29 Perforation 2567.30 2569.20 3
1985-04-15 Perforation 2582.90 2584.10 7
1985-04-15 Perforation 2586.50 2589.00 7
1985-04-15 Perforation 2597.20 2600.30 7
1985-04-15 Perforation 2601.50 2604.50 7
1985-04-15 Perforation 2609.40 2612.40 7
1985-04-15 Perforation 2613.70 2617.90 7
1985-04-18 Fracture 2575.90 2617.90 0
1989-12-02 Acid Treatment 2558.90 2617.90 0
1996-05-01 Acid Treatment 2558.90 2617.50 0
1998-10-03 Acid Treatment 2558.90 2617.50 0
1960-11-29 Perforation 2570.40 2572.20 3
1999-04-26 Acid Treatment 2558.90 2615.50 0
2000-07-20 Acid Treatment 2558.90 2615.50 0
2001-05-31 Acid Treatment 2558.90 2617.90 0
2002-11-26 Acid Treatment 2558.90 2617.90 0
2005-03-10 Acid Treatment 2558.90 2617.90 0
1960-11-29 Acid Treatment 2565.20 2572.20 0
1976-06-14 Perforation 2559.10 2564.90 3
1976-06-14 Perforation 2567.00 2567.00 3
1976-06-14 Perforation 2569.50 2570.10 3
1976-06-14 Perforation 2572.50 2576.20 3
1976-06-14 Perforation 2577.10 2577.70 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7016 0.0 0.0 0.0
1968 7564 0.0 0.0 0.0
1969 5158 0.0 0.0 0.0
1970 5130 0.0 0.0 0.0
1971 4900 0.0 0.0 0.0
1972 7581 0.0 0.0 0.0
1973 8358 0.0 0.0 0.0
1974 7555 0.0 0.0 0.0
1975 6488 0.0 0.0 0.0
1976 6570 0.0 0.0 0.0
1977 204 0.0 0.0 0.0
1978 42 0.0 0.0 0.0
1979 4048 0.0 0.0 0.0
1980 7594 0.0 0.0 0.0
1981 7730 0.0 0.0 0.0
1982 8170 0.0 0.0 0.0
1983 8345 0.0 0.0 0.0
1984 8633 0.0 0.0 0.0
1985 6148 0.0 0.0 0.0
1986 7820 0.0 0.0 0.0
1987 8478 0.0 0.0 0.0
1988 8492 0.0 0.0 0.0
1989 6904 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References