X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103106020

Well Details

Well ID: 0635103106020
Loading map...
Location: 02/06-31-063-10W5/0
Location Alias: 02/06-31-63-10 W5M
Location Alias 2: 02/06-31-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 31
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 6-31-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0074383
License Date: 1979-02-08
License Status: Issued
Spud Date: 1979-06-24
Final Drill Date: 1979-07-25
Well Total Depth: 2763.10 m
Surface Hole Latitude: 54.496924
Surface Hole Longitude: -115.499521

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-08 Obtained License
1979-06-24 Direction Drilling Operation Performed - 98
1979-07-25 Finished Drilling
1979-07-25 Well Mode changed to Drilled and Cased
1979-07-30 Production Casing Operation Performed
1979-12-02 Perforation Treatment Performed - Jet Perforation
1979-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-19 Perforation Treatment Performed - Jet Perforation
1979-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-13 Well Began Production
1980-03-13 Well Fluid changed to Crude Oil
1980-03-13 Well Mode changed to Gas Lift
1987-09-03 Well Log Performed
1987-09-10 Perforation Treatment Performed - Open-Hole Completion
1987-09-11 Well Log Performed
1987-09-12 Perforation Treatment Performed - Jet Perforation
1987-09-12 Well Log Performed
1987-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-11 Perforation Treatment Performed - Jet Perforation
1989-02-11 Well Log Performed
1989-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-25 Perforation Treatment Performed - Cement Squeeze
2004-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-31 Perforation Treatment Performed - Jet Perforation
2011-10-31 Well Log Performed
2011-11-04 Perforation Treatment Performed - Cement Squeeze
2011-11-08 Perforation Treatment Performed - Jet Perforation
2011-11-08 Well Log Performed
2011-11-11 Well Log Performed
2011-11-12 Perforation Treatment Performed - Cement Squeeze
2011-11-16 Perforation Treatment Performed - Jet Perforation
2011-11-16 Well Log Performed
2011-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-01 Well Fluid changed to Crude Oil
2011-12-01 Well Mode changed to Pumping
2016-09-18 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-06-24 1414.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-02 Perforation 2716.00 2717.30 7
1979-12-23 Acid Treatment 2699.00 2710.00 0
1987-09-10 Open Hole/Barefoot Completion 2748.70 2763.10 0
1987-09-12 Perforation 2734.50 2736.00 7
1987-09-12 Perforation 2739.00 2740.00 7
1987-09-12 Perforation 2741.20 2742.20 7
1987-09-12 Perforation 2742.80 2748.80 7
1987-09-13 Acid Treatment 2734.50 2748.80 0
1989-02-11 Perforation 2691.00 2697.00 7
1989-02-13 Acid Treatment 2691.00 2763.10 0
2004-08-25 Acid Treatment 2699.00 2710.00 0
1979-12-02 Perforation 2718.30 2719.00 7
2004-08-25 Cement Squeeze 2691.00 2710.00 0
2004-08-31 Perforation 2702.50 2703.50 7
2004-08-31 Perforation 2703.50 2710.00 14
2004-08-31 Acid Treatment 2702.50 2710.00 0
2011-11-04 Cement Squeeze 2702.50 2710.00 0
2011-11-08 Perforation 2704.00 2710.00 7
2011-11-12 Cement Squeeze 2704.00 2710.00 0
2011-11-16 Perforation 2705.00 2710.00 7
2011-11-18 Acid Treatment 2705.00 2710.00 0
1979-12-02 Perforation 2724.30 2724.80 7
1979-12-02 Perforation 2727.80 2728.50 7
1979-12-02 Perforation 2732.00 2733.50 7
1979-12-07 Acid Treatment 2716.00 2733.50 0
1979-12-19 Perforation 2699.00 2700.30 7
1979-12-19 Perforation 2701.00 2701.80 7
1979-12-19 Perforation 2702.50 2710.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4288 0.0 0.0 0.0
1981 4768 0.0 0.0 0.0
1982 1553 0.0 0.0 0.0
1983 6931 0.0 0.0 0.0
1984 8503 0.0 0.0 0.0
1985 7542 0.0 0.0 0.0
1986 8442 0.0 0.0 0.0
1987 7489 0.0 0.0 0.0
1988 7664 0.0 0.0 0.0
1989 7348 0.0 0.0 0.0
1990 8105 0.0 0.0 0.0
1991 8465 0.0 0.0 0.0
1992 7497 0.0 0.0 0.0
1993 7363 0.0 0.0 0.0
1994 8432 0.0 0.0 0.0
1995 8581 0.0 0.0 0.0
1996 8069 0.0 0.0 0.0
1997 8521 0.0 0.0 0.0
1998 7640 0.0 0.0 0.0
1999 8428 0.0 0.0 0.0
2000 8082 0.0 0.0 0.0
2001 7687 0.0 0.0 0.0
2002 8032 0.0 0.0 0.0
2003 8345 0.0 0.0 0.0
2004 6997 0.0 0.0 0.0
2005 8683 0.0 0.0 0.0
2006 7828 0.0 0.0 0.0
2007 8633 0.0 0.0 0.0
2008 5923 0.0 0.0 0.0
2009 6924 0.0 0.0 0.0
2010 8544 0.0 0.0 0.0
2011 7680 0.0 0.0 0.0
2012 8705 0.0 0.0 0.0
2013 8385 0.0 0.0 0.0
2014 8620 0.0 0.0 0.0
2015 7237 0.0 0.0 0.0
2016 7757 0.0 0.0 0.0
2017 8606 0.0 0.0 0.0
2018 8708 0.0 0.0 0.0
2019 8723 0.0 0.0 0.0
2020 2174 0.0 0.0 0.0

For data sources see[6]

References