X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103202000

Well Details

Well ID: 0635103202000
Loading map...
Location: 00/02-32-063-10W5/0
Location Alias: 00/02-32-63-10 W5M
Location Alias 2: 00/02-32-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 32
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 2-32-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0020543
License Date: 1961-03-09
License Status: Issued
Spud Date: 1961-04-26
Final Drill Date: 1961-05-19
Well Total Depth: 2688.60 m
Surface Hole Latitude: 54.488674
Surface Hole Longitude: -115.471977

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-09 Obtained License
1961-05-19 Finished Drilling
1961-05-19 Well Mode changed to Drilled and Cased
1961-05-22 Production Casing Operation Performed
1961-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-29 Perforation Treatment Performed - Jet Perforation
1961-05-30 Well Began Production
1961-05-30 Well Fluid changed to Crude Oil
1961-05-30 Well Mode changed to Flowing
1972-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-17 Perforation Treatment Performed - Jet Perforation
1978-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-10-01 Perforation Treatment Performed - Jet Perforation
1978-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-11 Perforation Treatment Performed - Fractured
1981-04-10 Well Fluid changed to Crude Oil
1981-04-10 Well Mode changed to Pumping
1987-11-04 Well Log Performed
1987-11-08 Perforation Treatment Performed - Jet Perforation
1992-02-15 Well Fluid changed to Crude Oil
1992-02-15 Well Mode changed to Suspended
1992-02-22 Perforation Treatment Performed - Jet Perforation
1992-02-23 Perforation Treatment Performed - Jet Perforation
1992-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-04 Well Log Performed
1992-03-25 Well Began Injection
1992-03-25 Well Fluid changed to Solvent
1992-03-25 Well Type changed to Injection
1997-09-15 Well Log Performed
2004-03-08 Well Log Performed
2004-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-10 Well Log Performed
2011-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-05-29 Perforation 2646.90 2653.00 3
1978-10-02 Acid Treatment 2605.40 2610.30 0
1980-11-11 Fracture 2605.40 2653.00 0
1987-11-08 Perforation 2612.70 2621.30 3
1987-11-08 Perforation 2625.50 2626.80 3
1987-11-08 Perforation 2629.50 2630.40 3
1987-11-08 Perforation 2632.90 2635.90 3
1987-11-08 Perforation 2646.90 2653.00 3
1992-02-22 Perforation 2612.70 2621.30 3
1992-02-22 Perforation 2625.50 2626.80 3
1992-02-22 Perforation 2632.90 2635.90 3
1961-05-29 Acid Treatment 2646.90 2653.00 0
1992-02-22 Perforation 2646.90 2653.00 3
1992-02-23 Perforation 2629.50 2630.00 3
1992-02-28 Acid Treatment 2605.80 2653.00 0
2004-03-09 Acid Treatment 2605.40 2635.90 0
2004-03-10 Packing Device Capped w/Cement 2640.00 2643.00 0
2011-03-07 Acid Treatment 2605.40 2635.90 0
2012-05-10 Acid Treatment 2605.40 2635.90 0
2014-06-13 Acid Treatment 2605.40 2635.90 0
1972-11-17 Perforation 2632.90 2635.90 3
1972-11-17 Perforation 2612.70 2621.30 3
1972-11-17 Perforation 2625.50 2626.80 3
1972-11-17 Perforation 2629.50 2630.40 3
1972-11-17 Acid Treatment 2612.70 2635.90 0
1978-10-01 Packing Device Capped w/Cement 2641.70 2644.00 0
1978-10-01 Perforation 2605.40 2610.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1967 200 0.0 0.0 0.0
1968 1371 0.0 0.0 0.0
1971 1998 0.0 0.0 0.0
1972 1770 0.0 0.0 0.0
1973 8419 0.0 0.0 0.0
1974 7302 0.0 0.0 0.0
1975 2013 0.0 0.0 0.0
1976 78 0.0 0.0 0.0
1978 1888 0.0 0.0 0.0
1979 8396 0.0 0.0 0.0
1980 8464 0.0 0.0 0.0
1981 7049 0.0 0.0 0.0
1982 8688 0.0 0.0 0.0
1983 8597 0.0 0.0 0.0
1984 8360 0.0 0.0 0.0
1985 8376 0.0 0.0 0.0
1986 8209 0.0 0.0 0.0
1987 8391 0.0 0.0 0.0
1988 8424 0.0 0.0 0.0
1989 8484 0.0 0.0 0.0
1990 8653 0.0 0.0 0.0
1991 8324 0.0 0.0 0.0
1992 1067 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-10 No Incident Encountered 0.00 0.00
2014-06-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References