X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103212000

Well Details

Well ID: 0635103212000
Loading map...
Location: 00/12-32-063-10W5/0
Location Alias: 00/12-32-63-10 W5M
Location Alias 2: 00/12-32-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 32
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 12-32-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0019328
License Date: 1960-07-07
License Status: Suspension
Spud Date: 1960-08-06
Final Drill Date: 1960-08-25
Well Total Depth: 2621.30 m
Surface Hole Latitude: 54.495890
Surface Hole Longitude: -115.485007

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-07 Obtained License
1960-08-25 Finished Drilling
1960-08-25 Well Mode changed to Drilled and Cased
1960-08-27 Production Casing Operation Performed
1960-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-30 Perforation Treatment Performed - Jet Perforation
1960-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-10 Well Began Production
1960-10-10 Well Fluid changed to Crude Oil
1960-10-10 Well Mode changed to Flowing
1968-05-15 Perforation Treatment Performed - Jet Perforation
1968-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-07 Well Fluid changed to Crude Oil
1979-10-07 Well Mode changed to Pumping
1984-12-04 Perforation Treatment Performed - Jet Perforation
1984-12-06 Perforation Treatment Performed - Fractured
1985-06-03 Well Began Injection
1985-06-03 Well Fluid changed to Solvent
1985-06-03 Well Type changed to Injection
1987-01-21 Well Log Performed
1987-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-11 Well Log Performed
1987-04-25 Well Log Performed
1987-05-23 Well Log Performed
1987-05-24 Well Log Performed
1987-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-09 Well Log Performed
1987-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-12 Well Log Performed
1987-06-13 Well Log Performed
1987-06-30 Well Log Performed
1987-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-11 Well Log Performed
1993-05-11 Well Fluid changed to Solvent
1993-05-11 Well Mode changed to Suspended
1993-05-11 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-09-30 Perforation 2585.90 2590.80 3
1984-12-04 Perforation 2538.70 2542.30 7
1984-12-04 Perforation 2543.90 2545.10 7
1984-12-04 Perforation 2546.60 2548.40 7
1984-12-04 Perforation 2550.00 2551.80 7
1984-12-04 Perforation 2561.20 2565.80 7
1984-12-04 Perforation 2572.20 2572.80 7
1984-12-04 Perforation 2574.60 2576.50 7
1984-12-04 Perforation 2581.70 2582.90 7
1984-12-04 Perforation 2583.80 2584.70 7
1984-12-04 Perforation 2585.90 2590.50 7
1960-09-30 Acid Treatment 2585.90 2590.80 0
1984-12-06 Fracture 2534.40 2590.80 0
1987-02-24 Acid Treatment 2534.40 2590.80 0
1987-06-08 Acid Treatment 2540.30 2590.80 0
1987-06-10 Acid Treatment 2572.20 2590.80 0
1987-07-20 Acid Treatment 2534.40 2590.80 0
1987-10-20 Acid Treatment 2534.40 2590.80 0
1988-02-15 Acid Treatment 2534.40 2590.80 0
1989-02-09 Acid Treatment 2534.40 2590.80 0
1989-11-09 Acid Treatment 2534.40 2590.80 0
1960-10-05 Acid Treatment 2585.90 2590.80 0
1968-05-15 Perforation 2534.10 2538.10 3
1968-05-15 Perforation 2539.30 2543.30 3
1968-05-15 Perforation 2546.90 2547.20 3
1968-05-16 Acid Treatment 2534.10 2590.80 0
1979-10-03 Acid Treatment 2534.10 2590.80 0
1984-12-04 Perforation 2534.40 2537.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1968 3195 0.0 0.0 0.0
1969 6072 0.0 0.0 0.0
1970 5451 0.0 0.0 0.0
1971 5617 0.0 0.0 0.0
1972 7525 0.0 0.0 0.0
1973 8327 0.0 0.0 0.0
1974 6852 0.0 0.0 0.0
1975 6871 0.0 0.0 0.0
1976 8352 0.0 0.0 0.0
1977 6007 0.0 0.0 0.0
1978 7291 0.0 0.0 0.0
1979 5916 0.0 0.0 0.0
1980 7431 0.0 0.0 0.0
1981 6229 0.0 0.0 0.0
1982 4061 0.0 0.0 0.0
1983 7609 0.0 0.0 0.0
1984 7362 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References