X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103302000

Well Details

Well ID: 0635103302000
Loading map...
Location: 00/02-33-063-10W5/0
Location Alias: 00/02-33-63-10 W5M
Location Alias 2: 00/02-33-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 33
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 2-33-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0020872
License Date: 1961-06-06
License Status: Suspension
Spud Date: 1961-07-08
Final Drill Date: 1961-07-29
Well Total Depth: 2668.00 m
Surface Hole Latitude: 54.488668
Surface Hole Longitude: -115.446906

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-06 Obtained License
1961-07-29 Finished Drilling
1961-07-29 Well Mode changed to Drilled and Cased
1961-07-31 Production Casing Operation Performed
1961-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-03 Perforation Treatment Performed - Bullet Perforation
1961-08-05 Well Began Production
1961-08-05 Well Fluid changed to Crude Oil
1961-08-05 Well Mode changed to Flowing
1973-09-12 Perforation Treatment Performed - Jet Perforation
1973-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-05-27 Well Fluid changed to Crude Oil
1975-05-27 Well Mode changed to Pumping
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Suspended
1987-11-13 Well Log Performed
1989-05-19 Perforation Treatment Performed - Jet Perforation
1989-05-19 Well Log Performed
1989-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-10 Well Fluid changed to Crude Oil
1989-06-10 Well Mode changed to Pumping
1989-06-24 Well Log Performed
1992-05-30 Well Fluid changed to Crude Oil
1992-05-30 Well Mode changed to Suspended
1992-07-15 Well Fluid changed to Crude Oil
1992-07-15 Well Mode changed to Suspended
1992-09-01 Well Began Injection
1992-09-01 Well Fluid changed to Water
1992-09-01 Well Type changed to Injection
1992-10-21 Well Fluid changed to Solvent
1992-10-21 Well Type changed to Injection
2000-10-26 Perforation Treatment Performed - Cement Plug
2000-10-26 Plug Back Performed
2000-10-26 Well Fluid changed to Solvent
2000-10-26 Well Mode changed to Abandoned and Whipstocked
2000-10-26 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-03 Bullet Perforation 2604.20 2609.40 3
2000-10-26 Cement Plug 2571.00 2579.00 0
1961-08-03 Acid Treatment 2604.20 2609.40 0
1973-09-12 Perforation 2594.50 2601.20 7
1973-09-13 Acid Treatment 2594.50 2601.20 0
1989-05-19 Perforation 2594.40 2607.30 7
1989-05-19 Perforation 2608.50 2609.70 7
1989-05-19 Perforation 2615.20 2621.30 7
1989-05-19 Perforation 2622.50 2624.90 7
1989-05-25 Acid Treatment 2594.40 2624.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1967 4292 0.0 0.0 0.0
1968 7582 0.0 0.0 0.0
1969 6971 0.0 0.0 0.0
1970 5666 0.0 0.0 0.0
1971 6279 0.0 0.0 0.0
1972 7374 0.0 0.0 0.0
1973 4779 0.0 0.0 0.0
1974 2984 0.0 0.0 0.0
1975 74 0.0 0.0 0.0
1979 683 0.0 0.0 0.0
1989 4542 0.0 0.0 0.0
1990 7906 0.0 0.0 0.0
1991 8638 0.0 0.0 0.0
1992 2801 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References