If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635103304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.488263,"lon":-115.459826,"icon":""}]} |
Location: 00/04-33-063-10W5/0 | |
Location Alias: 00/04-33-63-10 W5M | |
Location Alias 2: 00/04-33-063-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 10 | |
Section: 33 | |
County/Municipality: Woodlands County | |
Well Name: ACCEL JUDYCK 4-33-63-10 | |
Operator Name: ACCEL Energy Canada Limited | |
License Number: 0017684 | |
License Date: 1959-09-03 | |
License Status: Amended | |
Spud Date: 1959-09-09 | |
Final Drill Date: 1959-10-10 | |
Well Total Depth: 2688.90 m | |
Surface Hole Latitude: 54.488263 | |
Surface Hole Longitude: -115.459826 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-09-03 | Obtained License |
1959-10-10 | Finished Drilling |
1959-10-10 | Well Mode changed to Drilled and Cased |
1959-10-13 | Production Casing Operation Performed |
1959-10-27 | Perforation Treatment Performed - Jet Perforation |
1959-12-02 | Well Began Production |
1959-12-02 | Well Fluid changed to Crude Oil |
1959-12-02 | Well Mode changed to Flowing |
1972-10-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-10-03 | Perforation Treatment Performed - Jet Perforation |
1974-06-17 | Well Fluid changed to Crude Oil |
1974-06-17 | Well Mode changed to Pumping |
1980-05-23 | Perforation Treatment Performed - Fractured |
1980-06-23 | Well Began Injection |
1980-06-23 | Well Fluid changed to Water |
1980-06-23 | Well Type changed to Injection |
1987-03-06 | Well Log Performed |
1987-09-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-03 | Well Log Performed |
1987-11-28 | Well Log Performed |
1988-07-22 | Well Log Performed |
1989-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-04-22 | Well Log Performed |
1990-05-27 | Well Log Performed |
1992-01-14 | Perforation Treatment Performed - Cement Squeeze |
1992-01-17 | Perforation Treatment Performed - Jet Perforation |
1992-01-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-04-08 | Well Fluid changed to Solvent |
1992-04-08 | Well Type changed to Injection |
1992-08-10 | Well Log Performed |
1992-08-13 | Well Log Performed |
1993-08-28 | Well Log Performed |
1993-09-27 | Well Log Performed |
2002-03-31 | Well Log Performed |
2002-04-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-12 | Plug Back Performed |
2003-03-12 | Well Fluid changed to Solvent |
2003-03-12 | Well Mode changed to Abandoned and Whipstocked |
2003-03-12 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-10-27 | Perforation | 2624.60 | 2631.90 | 3 |
1972-10-03 | Perforation | 2616.40 | 2622.50 | 3 |
1972-10-03 | Acid Treatment | 2583.50 | 2631.90 | 0 |
1980-05-23 | Fracture | 2583.50 | 2631.90 | 0 |
1987-09-02 | Acid Treatment | 2583.50 | 2631.90 | 0 |
1989-04-18 | Acid Treatment | 2583.50 | 2631.90 | 0 |
1992-01-14 | Cement Squeeze | 2583.50 | 2631.90 | 0 |
1992-01-17 | Perforation | 2581.80 | 2585.40 | 13 |
1992-01-17 | Perforation | 2587.00 | 2587.60 | 13 |
1992-01-17 | Perforation | 2590.30 | 2591.20 | 13 |
1992-01-17 | Perforation | 2592.10 | 2598.20 | 13 |
1972-10-03 | Perforation | 2583.50 | 2587.10 | 3 |
1992-01-17 | Perforation | 2607.40 | 2609.50 | 13 |
1992-01-17 | Perforation | 2611.00 | 2612.90 | 13 |
1992-01-17 | Perforation | 2614.70 | 2620.80 | 13 |
1992-01-17 | Perforation | 2622.90 | 2630.20 | 13 |
1992-01-22 | Acid Treatment | 2581.80 | 2630.20 | 0 |
2002-04-01 | Acid Treatment | 2581.80 | 2598.20 | 0 |
2003-03-12 | Packing Device Capped w/Cement | 2567.00 | 2575.00 | 0 |
1972-10-03 | Perforation | 2588.70 | 2589.30 | 3 |
1972-10-03 | Perforation | 2592.00 | 2592.90 | 3 |
1972-10-03 | Perforation | 2593.80 | 2599.90 | 3 |
1972-10-03 | Perforation | 2601.80 | 2605.40 | 3 |
1972-10-03 | Perforation | 2606.30 | 2608.20 | 3 |
1972-10-03 | Perforation | 2609.10 | 2611.20 | 3 |
1972-10-03 | Perforation | 2612.70 | 2614.60 | 3 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5252 | 0.0 | 0.0 | 0.0 |
1968 | 7076 | 0.0 | 0.0 | 0.0 |
1969 | 2505 | 0.0 | 0.0 | 0.0 |
1970 | 1932 | 0.0 | 0.0 | 0.0 |
1971 | 2199 | 0.0 | 0.0 | 0.0 |
1972 | 5022 | 0.0 | 0.0 | 0.0 |
1973 | 8117 | 0.0 | 0.0 | 0.0 |
1974 | 1861 | 0.0 | 0.0 | 0.0 |
1975 | 1358 | 0.0 | 0.0 | 0.0 |
1976 | 4116 | 0.0 | 0.0 | 0.0 |
1977 | 6095 | 0.0 | 0.0 | 0.0 |
1978 | 5368 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]