X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635112204000

Well Details

Well ID: 0635112204000
Loading map...
Location: 00/04-22-063-11W5/0
Location Alias: 00/04-22-63-11 W5M
Location Alias 2: 00/04-22-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 22
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 4-22-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0020832
License Date: 1961-06-01
License Status: Issued
Spud Date: 1961-07-16
Final Drill Date: 1961-08-06
Well Total Depth: 2770.90 m
Surface Hole Latitude: 54.459219
Surface Hole Longitude: -115.585148

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-01 Obtained License
1961-08-06 Finished Drilling
1961-08-06 Production Casing Operation Performed
1961-08-06 Well Mode changed to Drilled and Cased
1961-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-13 Perforation Treatment Performed - Jet Perforation
1961-08-15 Well Began Production
1961-08-15 Well Fluid changed to Crude Oil
1961-08-15 Well Mode changed to Flowing
1963-03-12 Lost Circulation Occurred
1963-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-26 Perforation Treatment Performed - Jet Perforation
1963-10-03 Perforation Treatment Performed - Cement Squeeze
1963-10-04 Perforation Treatment Performed - Jet Perforation
1963-10-04 Well Fluid changed to Crude Oil
1963-10-04 Well Mode changed to Flowing
1965-06-05 Perforation Treatment Performed - Cement Squeeze
1965-06-05 Well Fluid changed to Crude Oil
1965-06-05 Well Mode changed to Flowing
1974-07-23 Perforation Treatment Performed - Jet Perforation
1974-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-27 Perforation Treatment Performed - Casing Patch (Over Perfs)
1974-07-27 Well Began Injection
1974-07-27 Well Fluid changed to Water
1974-07-27 Well Type changed to Injection
1981-10-30 Well Fluid changed to Water
1981-10-30 Well Mode changed to Suspended
1981-10-30 Well Type changed to Injection
1986-12-08 Perforation Treatment Performed - Jet Perforation
1986-12-08 Well Log Performed
1986-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-20 Well Fluid changed to Crude Oil
1986-12-20 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-13 Perforation 2713.60 2717.30 3
1974-07-23 Perforation 2724.90 2729.20 3
1974-07-23 Perforation 2743.80 2745.90 3
1974-07-23 Perforation 2746.90 2748.10 3
1974-07-23 Perforation 2749.90 2752.00 3
1974-07-24 Acid Treatment 2706.60 2752.00 0
1974-07-27 Casing Patch 1519.10 1522.80 0
1986-12-08 Perforation 2706.60 2713.30 7
1986-12-08 Perforation 2713.60 2717.30 7
1986-12-08 Perforation 2718.20 2721.30 7
1986-12-08 Perforation 2724.90 2731.90 7
1961-08-13 Perforation 2718.20 2721.30 3
1986-12-09 Acid Treatment 2706.60 2752.00 0
1961-08-13 Acid Treatment 2713.60 2721.30 0
1963-09-26 Perforation 1521.00 1521.30 13
1963-09-26 Acid Treatment 1521.00 1521.30 0
1963-10-03 Cement Squeeze 1521.00 1521.30 0
1963-10-04 Perforation 1520.60 1521.30 13
1965-06-05 Cement Squeeze 1520.60 1521.30 0
1974-07-23 Perforation 2706.60 2713.30 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4008 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1986 218 0.0 0.0 0.0
1987 8064 0.0 0.0 0.0
1988 8102 0.0 0.0 0.0
1989 8541 0.0 0.0 0.0
1990 8649 0.0 0.0 0.0
1991 8453 0.0 0.0 0.0
1992 8324 0.0 0.0 0.0
1993 8112 0.0 0.0 0.0
1994 8206 0.0 0.0 0.0
1995 8670 0.0 0.0 0.0
1996 8419 0.0 0.0 0.0
1997 8655 0.0 0.0 0.0
1998 8615 0.0 0.0 0.0
1999 8739 0.0 0.0 0.0
2000 8758 0.0 0.0 0.0
2001 8694 0.0 0.0 0.0
2002 8032 0.0 0.0 0.0
2003 8690 0.0 0.0 0.0
2004 8627 0.0 0.0 0.0
2005 8617 0.0 0.0 0.0
2006 8565 0.0 0.0 0.0
2007 8702 0.0 0.0 0.0
2008 8439 0.0 0.0 0.0
2009 8649 0.0 0.0 0.0
2010 8728 0.0 0.0 0.0
2011 8455 0.0 0.0 0.0
2012 8447 0.0 0.0 0.0
2013 8466 0.0 0.0 0.0
2014 8558 0.0 0.0 0.0
2015 7788 0.0 0.0 0.0
2016 8303 0.0 0.0 0.0
2017 8634 0.0 0.0 0.0
2018 8618 0.0 0.0 0.0
2019 3166 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1963-03-12 Lost Circulation 161.50 188.90

For data sources see[6]

References