X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635112210000

Well Details

Well ID: 0635112210000
Loading map...
Location: 00/10-22-063-11W5/0
Location Alias: 00/10-22-63-11 W5M
Location Alias 2: 00/10-22-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 22
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 10-22-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0020128
License Date: 1960-12-08
License Status: Suspension
Spud Date: 1961-02-02
Final Drill Date: 1961-03-10
Well Total Depth: 2831.00 m
Surface Hole Latitude: 54.466618
Surface Hole Longitude: -115.573373

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-12-08 Obtained License
1961-03-04 Production Casing Operation Performed
1961-03-10 Finished Drilling
1961-03-10 Well Mode changed to Drilled and Cased
1961-03-12 Perforation Treatment Performed - Open-Hole Completion
1961-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-21 Well Began Production
1961-03-21 Well Fluid changed to Crude Oil
1961-03-21 Well Mode changed to Flowing
1972-08-20 Well Fluid changed to Crude Oil
1972-08-20 Well Mode changed to Pumping
1974-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Suspended
1985-07-30 Well Fluid changed to Crude Oil
1985-07-30 Well Mode changed to Pumping
1987-03-21 Well Log Performed
1987-03-25 Well Log Performed
1987-04-06 Well Log Performed
1987-06-25 Well Log Performed
1987-06-26 Production Casing Operation Performed
1992-12-05 Well Fluid changed to Crude Oil
1992-12-05 Well Mode changed to Suspended
1996-02-06 Well Fluid changed to Crude Oil
1996-02-06 Well Mode changed to Pumping
2003-11-18 Well Log Performed
2003-11-20 Well Log Performed
2003-12-01 Well Fluid changed to Crude Oil
2003-12-01 Well Mode changed to Suspended
2004-07-09 Well Began Injection
2004-07-09 Well Fluid changed to Water
2004-07-09 Well Type changed to Injection
2004-08-19 Well Log Performed
2004-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-10-04 Perforation Treatment Performed - Cement Squeeze
2004-10-04 Plug Back Performed
2004-10-07 Perforation Treatment Performed - Jet Perforation
2004-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-01 Well Fluid changed to Water
2010-12-01 Well Mode changed to Suspended
2010-12-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-12 Open Hole/Barefoot Completion 2766.70 2802.60 0
1961-03-19 Acid Treatment 2766.70 2802.60 0
1974-10-29 Acid Treatment 2766.70 2802.60 0
2004-10-04 Acid Treatment 2677.70 2802.60 0
2004-10-04 Cement Squeeze 2788.80 2802.60 0
2004-10-07 Perforation 2780.30 2788.20 20
2004-10-10 Acid Treatment 2780.30 2788.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8508 0.0 0.0 0.0
1968 8304 0.0 0.0 0.0
1969 7943 0.0 0.0 0.0
1970 8415 0.0 0.0 0.0
1971 5971 0.0 0.0 0.0
1972 607 0.0 0.0 0.0
1973 5046 0.0 0.0 0.0
1974 1397 0.0 0.0 0.0
1975 1892 0.0 0.0 0.0
1976 4522 0.0 0.0 0.0
1977 2260 0.0 0.0 0.0
1985 1059 0.0 0.0 0.0
1986 6107 0.0 0.0 0.0
1987 3751 0.0 0.0 0.0
1988 8425 0.0 0.0 0.0
1989 7631 0.0 0.0 0.0
1990 7715 0.0 0.0 0.0
1991 8749 0.0 0.0 0.0
1992 8056 0.0 0.0 0.0
1996 4791 0.0 0.0 0.0
1997 7530 0.0 0.0 0.0
1998 7998 0.0 0.0 0.0
1999 8263 0.0 0.0 0.0
2000 8690 0.0 0.0 0.0
2001 8294 0.0 0.0 0.0
2002 8734 0.0 0.0 0.0
2003 6875 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

References