X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635113206000

Well Details

Well ID: 0635113206000
Loading map...
Location: 00/06-32-063-11W5/0
Location Alias: 00/06-32-63-11 W5M
Location Alias 2: 00/06-32-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 32
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 6-32-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0076560
License Date: 1979-06-25
License Status: Issued
Spud Date: 1979-08-20
Final Drill Date: 1979-09-21
Well Total Depth: 2998.00 m
Surface Hole Latitude: 54.495507
Surface Hole Longitude: -115.635505

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-25 Obtained License
1979-08-20 Direction Drilling Operation Performed - 98
1979-09-21 Finished Drilling
1979-09-21 Well Mode changed to Drilled and Cased
1979-09-26 Production Casing Operation Performed
1980-02-05 Perforation Treatment Performed - Jet Perforation
1980-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-10 Well Began Production
1980-04-10 Well Fluid changed to Crude Oil
1980-04-10 Well Mode changed to Flowing
1983-01-15 Perforation Treatment Performed - Jet Perforation
1983-01-17 Perforation Treatment Performed - Fractured
1983-01-19 Well Fluid changed to Crude Oil
1983-01-19 Well Mode changed to Gas Lift
1989-12-19 Perforation Treatment Performed - Jet Perforation
1989-12-19 Well Log Performed
1989-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-02 Well Fluid changed to Crude Oil
1994-06-02 Well Mode changed to Suspended
1997-03-20 Well Log Performed
1997-03-21 Well Log Performed
1997-04-01 Well Fluid changed to Crude Oil
1997-04-01 Well Mode changed to Gas Lift
2011-04-19 Well Log Performed
2011-04-20 Well Fluid changed to Crude Oil
2011-04-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-08-20 1530.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-05 Perforation 2942.00 2943.50 6
1989-12-19 Perforation 2954.00 2956.00 13
1989-12-19 Perforation 2965.00 2970.00 13
1989-12-19 Perforation 2974.00 2975.50 13
1989-12-19 Perforation 2979.00 2986.00 13
1989-12-22 Acid Treatment 2942.00 2986.00 0
1980-02-05 Perforation 2945.00 2946.50 6
1980-02-07 Acid Treatment 2942.00 2946.50 0
1983-01-15 Perforation 2948.50 2952.80 7
1983-01-15 Perforation 2957.30 2960.80 7
1983-01-15 Perforation 2962.80 2965.00 7
1983-01-15 Perforation 2970.20 2973.80 7
1983-01-17 Fracture 2942.00 2973.80 0
1989-12-19 Perforation 2943.50 2945.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 6041 0.0 0.0 0.0
1981 7292 0.0 0.0 0.0
1982 8021 0.0 0.0 0.0
1983 7821 0.0 0.0 0.0
1984 7998 0.0 0.0 0.0
1985 8505 0.0 0.0 0.0
1986 7877 0.0 0.0 0.0
1987 5489 0.0 0.0 0.0
1988 8147 0.0 0.0 0.0
1989 7630 0.0 0.0 0.0
1990 8007 0.0 0.0 0.0
1991 8313 0.0 0.0 0.0
1992 4700 0.0 0.0 0.0
1993 4814 0.0 0.0 0.0
1994 2813 0.0 0.0 0.0
1997 4666 0.0 0.0 0.0
1998 8318 0.0 0.0 0.0
1999 8407 0.0 0.0 0.0
2000 8584 0.0 0.0 0.0
2001 8552 0.0 0.0 0.0
2002 7987 0.0 0.0 0.0
2003 8596 0.0 0.0 0.0
2004 8482 0.0 0.0 0.0
2005 8442 0.0 0.0 0.0
2006 8460 0.0 0.0 0.0
2007 8347 0.0 0.0 0.0
2008 7913 0.0 0.0 0.0
2009 8579 0.0 0.0 0.0
2010 8641 0.0 0.0 0.0
2011 8078 0.0 0.0 0.0
2012 8687 0.0 0.0 0.0
2013 8353 0.0 0.0 0.0
2014 8339 0.0 0.0 0.0
2015 6402 0.0 0.0 0.0
2016 5090 0.0 0.0 0.0
2017 8562 0.0 0.0 0.0
2018 8521 0.0 0.0 0.0

For data sources see[6]

References