X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635113310000

Well Details

Well ID: 0635113310000
Loading map...
Location: 00/10-33-063-11W5/0
Location Alias: 00/10-33-63-11 W5M
Location Alias 2: 00/10-33-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 33
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 10-33-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0021075
License Date: 1961-07-14
License Status: Abandoned
Spud Date: 1961-08-01
Final Drill Date: 1961-08-26
Well Total Depth: 2835.20 m
Surface Hole Latitude: 54.496088
Surface Hole Longitude: -115.598753

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-07-14 Obtained License
1961-08-26 Finished Drilling
1961-08-26 Production Casing Operation Performed
1961-08-26 Well Mode changed to Drilled and Cased
1961-09-09 Perforation Treatment Performed - Jet Perforation
1961-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-11 Well Began Production
1961-09-11 Well Fluid changed to Crude Oil
1961-09-11 Well Mode changed to Flowing
1961-11-08 Perforation Treatment Performed - Cement Squeeze
1966-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-15 Perforation Treatment Performed - Jet Perforation
1966-12-09 Well Began Injection
1966-12-09 Well Fluid changed to Water
1966-12-09 Well Type changed to Injection
1968-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-21 Perforation Treatment Performed - Jet Perforation
1972-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-30 Well Fluid changed to Water
1981-10-30 Well Mode changed to Suspended
1981-10-30 Well Type changed to Injection
1984-05-20 Well Log Performed
1984-05-31 Perforation Treatment Performed - Jet Perforation
1984-06-01 Perforation Treatment Performed - Fractured
1984-06-29 Well Fluid changed to Crude Oil
1984-06-29 Well Mode changed to Flowing
1984-11-19 Well Fluid changed to Crude Oil
1984-11-19 Well Mode changed to Suspended
1988-09-01 Well Log Performed
1988-09-08 Well Log Performed
1988-09-10 Perforation Treatment Performed - Cement Squeeze
1988-09-12 Perforation Treatment Performed - Jet Perforation
1988-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-02 Well Fluid changed to Crude Oil
1988-10-02 Well Mode changed to Pumping
1990-05-08 Well Fluid changed to Crude Oil
1990-05-08 Well Mode changed to Suspended
1995-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-24 Perforation Treatment Performed - Jet Perforation
1995-03-24 Plug Back Performed
1996-08-22 Perforation Treatment Performed - Remedial Casing
1996-08-23 Well Abandoned
1996-08-23 Well Fluid changed to Crude Oil
1996-08-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-09 Perforation 2708.50 2713.60 3
1972-06-21 Perforation 2708.50 2715.20 7
1972-06-27 Acid Treatment 2708.50 2715.20 0
1984-05-31 Perforation 2718.20 2728.70 7
1984-06-01 Fracture 2718.20 2728.70 0
1988-09-10 Cement Squeeze 2751.70 2771.20 0
1988-09-12 Perforation 2708.40 2715.80 7
1988-09-12 Perforation 2717.60 2728.60 7
1988-09-14 Acid Treatment 2708.40 2728.70 0
1995-03-24 Packing Device Capped w/Cement 2688.00 2698.00 0
1995-03-24 Perforation 325.50 326.50 7
1961-09-10 Acid Treatment 2708.50 2713.60 0
1996-08-22 Remedial Casing Cementing 325.50 326.50 0
1961-11-08 Cement Squeeze 2708.50 2713.60 0
1966-11-15 Perforation 2751.70 2753.60 3
1966-11-15 Perforation 2756.60 2766.10 3
1966-11-15 Perforation 2769.40 2771.20 3
1966-11-15 Acid Treatment 2751.70 2771.20 0
1968-07-09 Acid Treatment 2751.70 2771.20 0
1970-02-25 Acid Treatment 2751.70 2771.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1984 2515 0.0 0.0 0.0
1988 2053 0.0 0.0 0.0
1989 8416 0.0 0.0 0.0
1990 2918 0.0 0.0 0.0

For data sources see[5]

References