X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635113410000

Well Details

Well ID: 0635113410000
Loading map...
Location: 00/10-34-063-11W5/0
Location Alias: 00/10-34-63-11 W5M
Location Alias 2: 00/10-34-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 34
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 10-34-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0018224
License Date: 1959-12-01
License Status: Issued
Spud Date: 1959-12-14
Final Drill Date: 1960-01-16
Well Total Depth: 2773.70 m
Surface Hole Latitude: 54.495911
Surface Hole Longitude: -115.573367

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-01 Obtained License
1959-12-14 Lost Circulation Occurred
1960-01-16 Finished Drilling
1960-01-16 Well Mode changed to Drilled and Cased
1960-01-19 Production Casing Operation Performed
1960-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-21 Perforation Treatment Performed - Jet Perforation
1960-02-05 Well Began Production
1960-02-05 Well Fluid changed to Crude Oil
1960-02-05 Well Mode changed to Flowing
1973-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-07 Perforation Treatment Performed - Jet Perforation
1973-03-07 Well Fluid changed to Crude Oil
1973-03-07 Well Mode changed to Pumping
1973-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-09 Well Log Performed
1987-09-10 Well Log Performed
1988-04-26 Well Fluid changed to Crude Oil
1988-04-26 Well Log Performed
1988-04-26 Well Mode changed to Suspended
1988-04-29 Well Log Performed
1988-05-04 Perforation Treatment Performed - Jet Perforation
1988-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-04 Well Began Injection
1988-08-04 Well Fluid changed to Water
1988-08-04 Well Type changed to Injection
1997-04-20 Well Log Performed
1998-02-26 Well Log Performed
1998-03-05 Perforation Treatment Performed - Jet Perforation
1998-03-05 Well Log Performed
1998-03-23 Well Log Performed
2000-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-20 Well Fluid changed to Solvent
2000-09-20 Well Type changed to Injection
2000-10-02 Well Log Performed
2002-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-12 Well Log Performed
2006-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-13 Perforation Treatment Performed - Cement Squeeze
2006-07-16 Perforation Treatment Performed - Jet Perforation
2006-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-29 Well Log Performed
2007-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-21 Perforation 2686.80 2692.60 3
1998-03-05 Perforation 2675.20 2686.50 13
2000-07-20 Acid Treatment 2674.60 2692.60 0
2002-05-02 Acid Treatment 2674.50 2692.40 0
2003-12-10 Acid Treatment 2674.50 2692.40 0
2006-07-13 Acid Treatment 2674.50 2685.80 0
2006-07-13 Cement Squeeze 2686.60 2692.40 0
2006-07-16 Perforation 2680.20 2684.60 14
2006-07-16 Perforation 2684.60 2685.80 7
2006-07-16 Perforation 2674.60 2680.20 14
2006-07-17 Acid Treatment 2674.50 2685.80 0
1960-01-21 Acid Treatment 2686.80 2692.60 0
2007-02-09 Acid Treatment 2674.60 2685.80 0
2012-03-04 Acid Treatment 2674.60 2685.80 0
2014-04-17 Acid Treatment 2674.60 2685.80 0
1973-02-07 Perforation 2674.60 2686.50 3
1973-02-07 Acid Treatment 2674.60 2686.50 0
1973-03-09 Packing Device Capped w/Cement 2685.90 2685.90 0
1973-11-06 Acid Treatment 2674.60 2686.50 0
1980-09-30 Acid Treatment 2674.60 2684.10 0
1988-05-04 Perforation 2686.80 2692.60 3
1988-05-07 Acid Treatment 2674.60 2692.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8197 0.0 0.0 0.0
1968 5182 0.0 0.0 0.0
1969 2369 0.0 0.0 0.0
1970 1383 0.0 0.0 0.0
1971 496 0.0 0.0 0.0
1973 5446 0.0 0.0 0.0
1974 5077 0.0 0.0 0.0
1975 4009 0.0 0.0 0.0
1976 7964 0.0 0.0 0.0
1977 6749 0.0 0.0 0.0
1978 4757 0.0 0.0 0.0
1979 8207 0.0 0.0 0.0
1980 5053 0.0 0.0 0.0
1981 8170 0.0 0.0 0.0
1982 8449 0.0 0.0 0.0
1983 4446 0.0 0.0 0.0
1984 8225 0.0 0.0 0.0
1985 8349 0.0 0.0 0.0
1986 8396 0.0 0.0 0.0
1987 8491 0.0 0.0 0.0
1988 2164 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1959-12-14 Lost Circulation 82.20 82.20
2014-04-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References