X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635172112002

Well Details

Well ID: 0635172112002
Loading map...
Location: 00/12-21-063-17W5/2
Location Alias: 00/12-21-63-17 W5M
Location Alias 2: 00/12-21-063-17 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 17
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOB 12-21-63-17
Operator Name: Paramount Resources Ltd.
License Number: 0478631
License Date: 2015-12-23
License Status: Amended
Spud Date: 2016-08-02
Final Drill Date: 2016-08-12
Well Total Depth: 5340.00 m
Surface Hole Latitude: 54.481851
Surface Hole Longitude: -116.549991

For data sources see[1][2]

Well History

Date Event
2015-12-23 Obtained License
2016-01-25 Direction Drilling Operation Performed - Deviate
2016-08-02 Direction Drilling Operation Performed - Horizontal
2016-08-12 Finished Drilling
2016-08-12 Well Log Performed
2016-08-12 Well Mode changed to Drilled and Cased
2016-08-13 Well Log Performed
2016-08-15 Liner Casing Operation Performed
2016-08-16 Rig Released
2016-10-14 Well Log Performed
2016-10-21 Perforation Treatment Performed - Fractured
2016-10-21 Perforation Treatment Performed - Jet Perforation
2016-10-21 Perforation Treatment Performed - Open-Hole Completion
2016-10-22 Perforation Treatment Performed - Fractured
2016-10-22 Perforation Treatment Performed - Jet Perforation
2016-10-23 Perforation Treatment Performed - Fractured
2016-10-23 Perforation Treatment Performed - Jet Perforation
2016-10-24 Perforation Treatment Performed - Fractured
2016-10-24 Perforation Treatment Performed - Jet Perforation
2016-10-25 Perforation Treatment Performed - Fractured
2016-10-25 Perforation Treatment Performed - Jet Perforation
2016-10-26 Perforation Treatment Performed - Fractured
2016-10-26 Perforation Treatment Performed - Jet Perforation
2016-10-27 Perforation Treatment Performed - Fractured
2016-10-27 Perforation Treatment Performed - Jet Perforation
2016-10-28 Perforation Treatment Performed - Fractured
2016-10-28 Perforation Treatment Performed - Jet Perforation
2016-11-07 Well Began Production
2016-11-07 Well Fluid changed to Crude Oil
2016-11-07 Well Mode changed to Flowing
2017-05-25 Well Fluid changed to Crude Oil
2017-05-25 Well Mode changed to Pumping
2017-06-02 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-02 Precision Drilling Corporation 391 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-25 757.00 Deviate (5 - 79 degrees)
2016-08-02 2655.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-21 Open Hole/Barefoot Completion 5339.00 5340.00 0
2016-10-22 Fracture 5169.00 5229.50 0
2016-10-26 Fracture 3729.00 3789.50 0
2016-10-27 Perforation 3709.00 3709.50 10
2016-10-27 Perforation 3689.00 3689.50 10
2016-10-27 Perforation 3669.00 3669.50 10
2016-10-27 Perforation 3649.00 3649.50 10
2016-10-27 Fracture 3649.00 3709.50 0
2016-10-27 Perforation 3629.00 3629.50 10
2016-10-27 Perforation 3609.00 3609.50 10
2016-10-27 Perforation 3589.00 3589.50 10
2016-10-27 Perforation 3569.00 3569.50 10
2016-10-22 Perforation 5149.00 5149.50 10
2016-10-27 Fracture 3569.00 3629.50 0
2016-10-27 Perforation 3549.00 3549.50 10
2016-10-27 Perforation 3529.00 3529.50 10
2016-10-27 Perforation 3509.00 3509.50 10
2016-10-27 Perforation 3489.00 3489.50 10
2016-10-27 Fracture 3489.00 3549.50 0
2016-10-27 Perforation 3469.00 3469.50 10
2016-10-27 Perforation 3449.00 3449.50 10
2016-10-27 Perforation 3429.00 3429.50 10
2016-10-27 Perforation 3409.00 3409.50 10
2016-10-22 Perforation 5129.00 5129.50 10
2016-10-27 Fracture 3409.00 3469.50 0
2016-10-27 Perforation 3389.00 3389.50 10
2016-10-27 Perforation 3369.00 3369.50 10
2016-10-27 Perforation 3349.00 3349.50 10
2016-10-27 Perforation 3329.00 3329.50 10
2016-10-27 Fracture 3329.00 3389.50 0
2016-10-27 Perforation 3309.00 3309.50 10
2016-10-27 Perforation 3289.00 3289.50 10
2016-10-27 Perforation 3269.00 3269.50 10
2016-10-27 Perforation 3249.00 3249.50 10
2016-10-22 Perforation 5109.00 5109.50 10
2016-10-27 Fracture 3249.00 3309.50 0
2016-10-28 Perforation 3230.00 3230.50 10
2016-10-28 Perforation 3211.00 3211.50 10
2016-10-28 Perforation 3192.00 3192.50 10
2016-10-28 Perforation 3173.00 3173.50 10
2016-10-28 Fracture 3173.00 3230.50 0
2016-10-28 Perforation 3154.00 3154.50 10
2016-10-28 Perforation 3135.00 3135.50 10
2016-10-28 Perforation 3116.00 3116.50 10
2016-10-28 Perforation 3097.00 3097.50 10
2016-10-22 Perforation 5089.00 5089.50 10
2016-10-28 Fracture 3097.00 3154.50 0
2016-10-28 Perforation 3077.00 3077.50 10
2016-10-28 Perforation 3056.00 3056.50 10
2016-10-28 Perforation 3036.00 3036.50 10
2016-10-28 Perforation 3015.00 3015.50 10
2016-10-28 Fracture 3015.00 3077.50 0
2016-10-28 Perforation 2995.00 2995.50 10
2016-10-28 Perforation 2975.00 2975.50 10
2016-10-28 Perforation 2955.00 2955.50 10
2016-10-28 Perforation 2935.00 2935.50 10
2016-10-22 Fracture 5089.00 5149.50 0
2016-10-28 Fracture 2935.00 2995.50 0
2016-10-22 Perforation 5069.00 5069.50 10
2016-10-22 Perforation 5049.00 5049.50 10
2016-10-22 Perforation 5029.00 5029.50 10
2016-10-22 Perforation 5009.00 5009.50 10
2016-10-21 Perforation 5289.00 5289.50 10
2016-10-22 Fracture 5009.00 5069.50 0
2016-10-22 Perforation 4989.00 4989.50 10
2016-10-22 Perforation 4969.00 4969.50 10
2016-10-22 Perforation 4949.00 4949.50 10
2016-10-22 Perforation 4929.00 4929.50 10
2016-10-22 Fracture 4929.00 4989.50 0
2016-10-22 Perforation 4909.00 4909.50 10
2016-10-22 Perforation 4889.00 4889.50 10
2016-10-22 Perforation 4869.00 4869.50 10
2016-10-22 Perforation 4849.00 4849.50 10
2016-10-21 Perforation 5269.00 5269.50 10
2016-10-22 Fracture 4849.00 4909.50 0
2016-10-23 Perforation 4829.00 4829.50 10
2016-10-23 Perforation 4809.00 4809.50 10
2016-10-23 Perforation 4789.00 4789.50 10
2016-10-23 Perforation 4769.00 4769.50 10
2016-10-23 Fracture 4769.00 4829.50 0
2016-10-23 Perforation 4749.00 4749.50 10
2016-10-23 Perforation 4729.00 4729.50 10
2016-10-23 Perforation 4709.00 4709.50 10
2016-10-23 Perforation 4689.00 4689.50 10
2016-10-21 Perforation 5249.00 5249.50 10
2016-10-23 Fracture 4689.00 4749.50 0
2016-10-23 Perforation 4669.00 4669.50 10
2016-10-23 Perforation 4649.00 4649.50 10
2016-10-23 Perforation 4629.00 4629.50 10
2016-10-23 Perforation 4609.00 4609.50 10
2016-10-23 Fracture 4609.00 4669.50 0
2016-10-23 Perforation 4589.00 4589.50 10
2016-10-23 Perforation 4569.00 4569.50 10
2016-10-23 Perforation 4549.00 4549.50 10
2016-10-23 Perforation 4529.00 4529.50 10
2016-10-21 Fracture 5249.00 5289.50 0
2016-10-23 Fracture 4529.00 4589.50 0
2016-10-24 Perforation 4509.00 4509.50 10
2016-10-24 Perforation 4489.00 4489.50 10
2016-10-24 Perforation 4469.00 4469.50 10
2016-10-24 Perforation 4449.00 4449.50 10
2016-10-24 Fracture 4449.00 4509.50 0
2016-10-25 Perforation 4429.00 4429.50 10
2016-10-25 Perforation 4409.00 4409.50 10
2016-10-25 Perforation 4389.00 4389.50 10
2016-10-25 Perforation 4369.00 4369.50 10
2016-10-22 Perforation 5229.00 5229.50 10
2016-10-25 Fracture 4369.00 4429.50 0
2016-10-25 Perforation 4349.00 4349.50 10
2016-10-25 Perforation 4329.00 4329.50 10
2016-10-25 Perforation 4309.00 4309.50 10
2016-10-25 Perforation 4289.00 4289.50 10
2016-10-25 Fracture 4289.00 4349.50 0
2016-10-25 Perforation 4269.00 4269.50 10
2016-10-25 Perforation 4249.00 4249.50 10
2016-10-25 Perforation 4229.00 4229.50 10
2016-10-25 Perforation 4209.00 4209.50 10
2016-10-22 Perforation 5209.00 5209.50 10
2016-10-25 Fracture 4209.00 4269.50 0
2016-10-26 Perforation 4189.00 4189.50 10
2016-10-26 Perforation 4169.00 4169.50 10
2016-10-26 Perforation 4149.00 4149.50 10
2016-10-26 Perforation 4129.00 4129.50 10
2016-10-26 Fracture 4129.00 4189.50 0
2016-10-26 Perforation 4109.00 4109.50 10
2016-10-26 Perforation 4089.00 4089.50 10
2016-10-26 Perforation 4069.00 4069.50 10
2016-10-26 Perforation 4049.00 4049.50 10
2016-10-22 Perforation 5189.00 5189.50 10
2016-10-26 Fracture 4049.00 4109.50 0
2016-10-26 Perforation 4029.00 4029.50 10
2016-10-26 Perforation 4009.00 4009.50 10
2016-10-26 Perforation 3989.00 3989.50 10
2016-10-26 Perforation 3969.00 3969.50 10
2016-10-26 Fracture 3969.00 4029.50 0
2016-10-26 Perforation 3949.00 3949.50 10
2016-10-26 Perforation 3929.00 3929.50 10
2016-10-26 Perforation 3909.00 3909.50 10
2016-10-26 Perforation 3889.00 3889.50 10
2016-10-22 Perforation 5169.00 5169.50 10
2016-10-26 Fracture 3889.00 3949.50 0
2016-10-26 Perforation 3869.00 3869.50 10
2016-10-26 Perforation 3849.00 3849.50 10
2016-10-26 Perforation 3829.00 3829.50 10
2016-10-26 Perforation 3809.00 3809.50 10
2016-10-26 Fracture 3809.00 3869.50 0
2016-10-26 Perforation 3789.00 3789.50 10
2016-10-26 Perforation 3769.00 3769.50 10
2016-10-26 Perforation 3749.00 3749.50 10
2016-10-26 Perforation 3729.00 3729.50 10

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-21 2016-10-28 2,828 35,659 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.2417 N/A
water Not Available 100 50.2889 N/A
CRC-C 30/50 Trican phenolic resin 9003-35-4 100 1.5348 N/A
silica crystalline 14808-60-7 100 1.5348 N/A
Econo 30/50 Trican ceramic materials and wares. chemicals 66402-68-4 100 1.4852 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 8.1854 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8607 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
2-mercaptoethanol 60-24-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
Breaker SR Trican Breaker potassium persulfate 7727-21-1 100 0.0052 N/A
silica crystalline 14808-60-7 100 0.0052 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.0947 N/A
non-hazardous ingredients Not Available 100 0.0947 N/A
FE-8 Trican Conductivity Enhancer citrus terpenes 68647-72-3 100 0.0604 N/A
non-hazardous ingredients Not Available 100 0.0604 N/A
nonionic surfactant 9288 100 0.0604 N/A
propylene glycol 57-55-6 100 0.0604 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0033 N/A
potassium iodide 7681-11-0 100 0.0033 N/A
propargyl alcohol 107-19-7 100 0.0033 N/A
propargyl alcohol derivative 9393 100 0.0033 N/A
IF-85 Trican Corrosion Inhibitor formic acid 64-18-6 100 0.005 N/A
water Not Available 100 0.005 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.1115 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1115 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0021 N/A
propylene glycol 57-55-6 100 0.0021 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.063 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.063 N/A
non-hazardous ingredients Not Available 100 0.063 N/A
WG-111DA Trican Gelling Agent fumaric acid 110-17-8 100 0.0614 N/A
guar gum 9000-30-0 100 0.0614 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0021 N/A
S-8 Trican Surfactant 1.2.4-trimethylbenzene 95-63-6 100 0.0007 N/A
1.3.5-trimethylbenzene 108-67-8 100 0.0007 N/A
ethylbenzene 100-41-4 100 0.0007 N/A
methanol 67-56-1 100 0.0007 N/A
oxyalkylated alkylphenolic resin 30704-64-4 100 0.0007 N/A
polyglycol diepoxide 68036-92-0 100 0.0007 N/A
polyglycol diepoxide 68036-95-3 100 0.0007 N/A
solvent naphtha (petroleum). light aromatic 64742-95-6 100 0.0007 N/A
xylene 1330-20-7 100 0.0007 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-18 2016-10-28 Surface Water - Runoff 38907

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 503 0.0 0.0 0.0
2017 6694 0.0 0.0 0.0
2018 7652 0.0 0.0 0.0
2019 7093 0.0 0.0 0.0
2020 2001 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-18 No Incident Encountered 0.00 0.00
2016-11-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References