X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635252102000

Well Details

Well ID: 0635252102000
Loading map...
Location: 00/02-21-063-25W5/0
Location Alias: 00/02-21-63-25 W5M
Location Alias 2: 00/02-21-063-25 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 25
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI SIMON 2-21-63-25
Operator Name: Gain Energy Ltd.
License Number: 0154920
License Date: 1992-12-02
License Status: Abandoned
Spud Date: 1993-01-19
Final Drill Date: 1993-02-25
Well Total Depth: 3663.00 m
Surface Hole Latitude: 54.460492
Surface Hole Longitude: -117.722612

For data sources see[1][2]

Well History

Date Event
1992-12-02 Obtained License
1993-01-21 Surface Casing Operation Performed
1993-02-11 Direction Drilling Operation Performed - Deviate
1993-02-25 Finished Drilling
1993-02-25 Well Log Performed
1993-02-25 Well Mode changed to Drilled and Cased
1993-02-28 Production Casing Operation Performed
1993-03-01 Rig Released
1993-03-13 Well Log Performed
1993-03-16 Perforation Treatment Performed - Jet Perforation
1993-03-16 Well Log Performed
1993-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-17 Perforation Treatment Performed - Cement Squeeze
1993-03-21 Perforation Treatment Performed - Jet Perforation
1993-04-07 Well Log Performed
1993-06-01 Well Began Production
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Flowing
1994-07-31 Well Fluid changed to Crude Oil
1994-07-31 Well Mode changed to Suspended
1995-10-08 Well Fluid changed to Crude Oil
1995-10-08 Well Mode changed to Flowing
2001-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-01 Plug Back Performed
2001-04-01 Well Fluid changed to Crude Oil
2001-04-01 Well Mode changed to Abandoned Zone
2002-12-04 Well Log Performed
2003-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-07 Well Log Performed
2003-01-09 Perforation Treatment Performed - Cement Plug
2003-01-09 Plug Back Performed
2003-01-14 Well Abandoned
2003-01-14 Well Fluid changed to Crude Oil
2003-01-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-02-11 2881.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-16 Perforation 3624.00 3625.00 39
1993-03-16 Perforation 3644.00 3645.00 39
1993-03-17 Acid Treatment 3624.00 3645.00 0
1993-03-17 Cement Squeeze 3624.00 3645.00 0
1993-03-21 Perforation 3611.00 3617.00 17
2001-04-01 Packing Device Capped w/Cement 3546.00 3555.00 0
2003-01-07 Packing Device Capped w/Cement 2692.00 2700.00 0
2003-01-09 Cement Plug 1400.00 2400.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 3329 0.0 0.0 0.0
1994 3264 0.0 0.0 0.0
1995 304 0.0 0.0 0.0
1996 4777 0.0 0.0 0.0

For data sources see[6]

References