X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635260210000

Well Details

Well ID: 0635260210000
Loading map...
Location: 00/10-02-063-26W5/0
Location Alias: 00/10-02-63-26 W5M
Location Alias 2: 00/10-02-063-26 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 26
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI SIMON 10-2-63-26
Operator Name: Gain Energy Ltd.
License Number: 0019066
License Date: 1960-05-19
License Status: Suspension
Spud Date: 1960-06-03
Final Drill Date: 1960-08-02
Well Total Depth: 3534.20 m
Surface Hole Latitude: 54.423229
Surface Hole Longitude: -117.816740

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-05-19 Obtained License
1960-08-02 Finished Drilling
1960-08-02 Perforation Treatment Performed - Acid Wash - No Pressure
1960-08-02 Perforation Treatment Performed - Open-Hole Completion
1960-08-02 Production Casing Operation Performed
1960-08-02 Well Mode changed to Drilled and Cased
1960-08-19 Well Began Production
1960-08-19 Well Fluid changed to Crude Oil
1960-08-19 Well Mode changed to Flowing
1971-08-17 Perforation Treatment Performed - Jet Perforation
1980-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-04 Well Fluid changed to Crude Oil
1980-12-04 Well Mode changed to Gas Lift
1992-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-25 Perforation Treatment Performed - Jet Perforation
1992-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-13 Perforation Treatment Performed - Cement Plug
2002-02-13 Plug Back Performed
2002-02-13 Well Fluid changed to Crude Oil
2002-02-13 Well Mode changed to Abandoned Zone
2002-02-14 Well Log Performed
2002-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-15 Plug Back Performed
2002-02-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-02 Open Hole/Barefoot Completion 3528.70 3534.20 0
1992-10-08 Acid Treatment 3493.00 3506.50 0
2002-02-13 Cement Plug 2071.00 3493.00 0
2002-02-15 Packing Device Capped w/Cement 2038.00 2046.00 0
1960-08-02 Acid Wash 3528.70 3534.20 0
1971-08-17 Perforation 3498.50 3499.40 7
1971-08-17 Perforation 3501.50 3506.70 7
1971-08-17 Perforation 3509.50 3518.90 7
1980-11-15 Acid Treatment 3498.50 3518.90 0
1992-05-27 Acid Treatment 3498.50 3518.90 0
1992-09-25 Perforation 3493.00 3499.00 14
1992-09-27 Acid Treatment 3493.00 3499.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1084 0.0 0.0 0.0
1968 2541 0.0 0.0 0.0
1969 6890 0.0 0.0 0.0
1970 5457 0.0 0.0 0.0
1971 2510 0.0 0.0 0.0
1973 2843 0.0 0.0 0.0
1974 8290 0.0 0.0 0.0
1975 8218 0.0 0.0 0.0
1976 7915 0.0 0.0 0.0
1977 7875 0.0 0.0 0.0
1978 6332 0.0 0.0 0.0
1979 7429 0.0 0.0 0.0
1980 6724 0.0 0.0 0.0
1981 6917 0.0 0.0 0.0
1982 8742 0.0 0.0 0.0
1983 7464 0.0 0.0 0.0
1984 8772 0.0 0.0 0.0
1985 8153 0.0 0.0 0.0
1986 8348 0.0 0.0 0.0
1987 7858 0.0 0.0 0.0
1988 8276 0.0 0.0 0.0
1989 7586 0.0 0.0 0.0
1990 8597 0.0 0.0 0.0
1991 7191 0.0 0.0 0.0
1992 6819 0.0 0.0 0.0
1993 7570 0.0 0.0 0.0
1994 6984 0.0 0.0 0.0
1995 7879 0.0 0.0 0.0
1996 8392 0.0 0.0 0.0
1997 7540 0.0 0.0 0.0
1998 6655 0.0 0.0 0.0
1999 2328 0.0 0.0 0.0
2000 144 0.0 0.0 0.0

For data sources see[5]

References