X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635261004002

Well Details

Well ID: 0635261004002
Loading map...
Location: 00/04-10-063-26W5/2
Location Alias: 00/04-10-63-26 W5M
Location Alias 2: 00/04-10-063-26 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 26
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI SIMON 3-10-63-26
Operator Name: Gain Energy Ltd.
License Number: 0062665
License Date: 1977-02-09
License Status: Suspension
Spud Date: 1977-03-04
Final Drill Date: 1995-02-03
Well Total Depth: 3753.50 m
Surface Hole Latitude: 54.431216
Surface Hole Longitude: -117.850731

For data sources see[1][2]

Well History

Date Event
1977-02-09 Obtained License
1977-04-22 Intermediate Casing Operation Performed
1995-01-17 Well Log Performed
1995-01-21 Direction Drilling Operation Performed - Horizontal
1995-02-03 Finished Drilling
1995-02-03 Well Log Performed
1995-02-03 Well Mode changed to Drilled and Cased
1995-02-07 Liner Casing Operation Performed
1995-02-11 Perforation Treatment Performed - Open-Hole Completion
1995-02-11 Well Log Performed
1995-02-13 Rig Released
1995-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-19 Well Began Production
1995-03-19 Well Fluid changed to Crude Oil
1995-03-19 Well Mode changed to Flowing
1996-08-29 Perforation Treatment Performed - Jet Perforation
1996-08-29 Well Log Performed
1996-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-09 Perforation Treatment Performed - Cement Squeeze
1997-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-25 Well Log Performed
1997-10-01 Perforation Treatment Performed - Jet Perforation
1997-10-02 Perforation Treatment Performed - Jet Perforation
1997-10-02 Well Log Performed
1997-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-05 Perforation Treatment Performed - Cement Squeeze
1997-10-06 Perforation Treatment Performed - Jet Perforation
1997-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-08 Perforation Treatment Performed - Cement Squeeze
1997-10-10 Well Fluid changed to Crude Oil
1997-10-10 Well Mode changed to Suspended
1997-10-14 Perforation Treatment Performed - Jet Perforation
1997-10-14 Well Log Performed
1997-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-21 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-01-21 3407.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-11 Open Hole/Barefoot Completion 3620.00 3753.50 0
1997-10-02 Perforation 2430.70 2431.00 20
1997-10-03 Acid Treatment 2459.70 2460.60 0
1997-10-03 Acid Treatment 2430.70 2431.00 0
1997-10-05 Cement Squeeze 2459.70 2460.60 0
1997-10-06 Perforation 2392.70 2393.60 20
1997-10-07 Acid Treatment 2392.70 2393.60 0
1997-10-07 Acid Treatment 2347.00 2347.90 0
1997-10-08 Cement Squeeze 2430.70 2431.00 0
1997-10-08 Cement Squeeze 2392.70 2393.60 0
1997-10-08 Cement Squeeze 2347.00 2347.90 0
1995-02-14 Acid Treatment 3620.00 3753.50 0
1997-10-14 Perforation 2435.40 2440.80 16
1997-10-14 Perforation 2364.50 2366.50 16
1997-10-14 Perforation 2358.50 2364.50 16
1997-10-17 Acid Treatment 2435.80 2440.80 0
1997-10-21 Packing Device Capped w/Cement 2339.00 2347.00 0
1996-08-29 Perforation 395.00 396.00 20
1996-09-05 Acid Treatment 395.00 396.00 0
1996-09-09 Acid Treatment 395.00 396.00 0
1996-09-09 Cement Squeeze 395.00 396.00 0
1997-09-25 Packing Device Capped w/Cement 3332.00 3340.00 0
1997-10-01 Perforation 2459.70 2460.60 20
1997-10-01 Perforation 2347.00 2347.90 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3162 0.0 0.0 0.0
1996 3198 0.0 0.0 0.0
1997 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-09-14 No Incident Encountered 0.00 0.00
1997-10-22 No Incident Encountered 0.00 0.00
2019-09-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References