If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0636012706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.478546,"lon":-118.067987,"icon":""}]} |
Location: 00/06-27-063-01W6/0 | |
Location Alias: 00/06-27-63-01 W6M | |
Location Alias 2: 00/06-27-063-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 6 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: OEI ET AL SIMONETTE 6-27-63-1 | |
Operator Name: Methanex Corporation | |
License Number: 0080292 | |
License Date: 1980-01-08 | |
License Status: RecCertified | |
Spud Date: 1980-01-21 | |
Final Drill Date: 1980-02-18 | |
Well Total Depth: 2567.00 m | |
Surface Hole Latitude: 54.478546 | |
Surface Hole Longitude: -118.067987 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-01-08 | Obtained License |
1980-02-02 | Drill Stem Test Performed |
1980-02-08 | Drill Stem Test Performed |
1980-02-15 | Drill Stem Test Performed |
1980-02-18 | Finished Drilling |
1980-02-18 | Well Log Performed |
1980-02-23 | Drill Stem Test Performed |
1980-02-26 | Production Casing Operation Performed |
1980-03-05 | Perforation Treatment Performed - Jet Perforation |
1980-03-09 | Perforation Treatment Performed - Fractured |
1980-11-03 | Perforation Treatment Performed - Jet Perforation |
1980-11-08 | Perforation Treatment Performed - Fractured |
1980-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-11-14 | Perforation Treatment Performed - Jet Perforation |
1980-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-11-19 | Perforation Treatment Performed - Jet Perforation |
1980-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-21 | Perforation Treatment Performed - Jet Perforation |
1980-11-23 | Perforation Treatment Performed - Cement Squeeze |
1980-11-23 | Perforation Treatment Performed - Jet Perforation |
1980-11-24 | Perforation Treatment Performed - Cement Squeeze |
1980-12-09 | Perforation Treatment Performed - Jet Perforation |
1980-12-15 | Perforation Treatment Performed - Fractured |
1981-01-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-01-07 | Perforation Treatment Performed - Jet Perforation |
1981-01-08 | Perforation Treatment Performed - Jet Perforation |
1981-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-09 | Perforation Treatment Performed - Cement Squeeze |
1981-01-10 | Perforation Treatment Performed - Cement Squeeze |
1981-01-15 | Perforation Treatment Performed - Jet Perforation |
1981-01-17 | Perforation Treatment Performed - Fractured |
1981-01-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-01-29 | Well Mode changed to Drilled and Cased |
1985-11-19 | Well Abandoned |
1985-11-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-03-05 | Perforation | 2506.00 | 2510.00 | 13 |
1980-11-19 | Perforation | 1842.00 | 1843.00 | 7 |
1980-11-21 | Acid Treatment | 1894.00 | 1895.00 | 0 |
1980-11-21 | Perforation | 1879.00 | 1880.00 | 7 |
1980-11-23 | Cement Squeeze | 1879.00 | 1895.00 | 0 |
1980-11-23 | Perforation | 1865.00 | 1866.00 | 7 |
1980-11-24 | Cement Squeeze | 1842.00 | 1866.00 | 0 |
1980-12-09 | Perforation | 1884.00 | 1887.00 | 13 |
1980-12-15 | Fracture | 1884.00 | 1887.00 | 0 |
1981-01-07 | Packing Device Capped w/Cement | 1877.00 | 1877.00 | 0 |
1981-01-07 | Perforation | 1864.00 | 1865.00 | 7 |
1980-03-09 | Fracture | 2506.00 | 2510.00 | 0 |
1981-01-08 | Perforation | 1843.00 | 1844.00 | 7 |
1981-01-09 | Acid Treatment | 1864.00 | 1865.00 | 0 |
1981-01-09 | Cement Squeeze | 1864.00 | 1865.00 | 0 |
1981-01-10 | Cement Squeeze | 1843.00 | 1844.00 | 0 |
1981-01-15 | Perforation | 1851.00 | 1855.00 | 7 |
1981-01-17 | Fracture | 1851.00 | 1855.00 | 0 |
1981-01-29 | Packing Device Capped w/Cement | 1829.00 | 1837.00 | 0 |
1980-11-03 | Perforation | 2506.00 | 2510.00 | 13 |
1980-11-08 | Fracture | 2506.00 | 2510.00 | 0 |
1980-11-13 | Packing Device Capped w/Cement | 2495.00 | 2500.00 | 0 |
1980-11-14 | Perforation | 2400.50 | 2402.50 | 13 |
1980-11-17 | Acid Treatment | 2400.50 | 2402.50 | 0 |
1980-11-19 | Packing Device Capped w/Cement | 2384.00 | 2392.00 | 0 |
1980-11-19 | Perforation | 1894.00 | 1895.00 | 7 |
For data sources see[4]