X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636043208000

Well Details

Well ID: 0636043208000
Loading map...
Location: 00/08-32-063-04W6/0
Location Alias: 00/08-32-63-04 W6M
Location Alias 2: 00/08-32-063-04 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 04
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: HUNT KAKWA 8-32-63-4
Operator Name: Harvest Operations Corp.
License Number: 0432223
License Date: 2011-03-08
License Status: Suspension
Spud Date: 2011-03-22
Final Drill Date: 2011-04-02
Well Total Depth: 2830.00 m
Surface Hole Latitude: 54.493707
Surface Hole Longitude: -118.559162

For data sources see[1][2]

Well History

Date Event
2011-03-08 Obtained License
2011-03-24 Surface Casing Operation Performed
2011-03-25 Well Log Performed
2011-04-02 Finished Drilling
2011-04-02 Well Mode changed to Drilled and Cased
2011-04-03 Well Log Performed
2011-04-05 Production Casing Operation Performed
2011-04-05 Rig Released
2011-06-13 Perforation Treatment Performed - Jet Perforation
2011-06-13 Well Log Performed
2011-06-29 Perforation Treatment Performed - Jet Perforation
2011-06-29 Well Log Performed
2011-07-08 Perforation Treatment Performed - Fractured
2011-07-10 Perforation Treatment Performed - Jet Perforation
2011-07-10 Well Log Performed
2011-07-12 Perforation Treatment Performed - Fractured
2011-07-12 Perforation Treatment Performed - Jet Perforation
2011-07-12 Well Log Performed
2011-07-13 Perforation Treatment Performed - Fractured
2011-07-13 Perforation Treatment Performed - Jet Perforation
2011-07-13 Well Log Performed
2011-07-14 Perforation Treatment Performed - Fractured
2011-07-14 Perforation Treatment Performed - Jet Perforation
2011-07-14 Well Log Performed
2011-07-15 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-06-13 Perforation 2789.00 2795.00 13
2011-07-12 Perforation 2340.00 2344.00 13
2011-07-13 Fracture 2340.00 2344.00 0
2011-07-13 Perforation 2083.50 2084.50 5
2011-07-13 Perforation 2120.00 2122.00 5
2011-07-13 Perforation 2159.00 2169.00 5
2011-07-14 Fracture 2083.50 2084.50 0
2011-07-14 Fracture 2120.00 2122.00 0
2011-07-14 Fracture 2159.00 2169.00 0
2011-07-14 Perforation 1641.00 1642.00 10
2011-07-14 Perforation 1645.00 1647.00 10
2011-06-29 Perforation 2666.00 2672.00 13
2011-07-15 Fracture 1641.00 1642.00 0
2011-07-15 Fracture 1645.00 1647.00 0
2011-07-08 Fracture 2666.00 2672.00 0
2011-07-10 Perforation 2599.00 2600.00 5
2011-07-10 Perforation 2575.00 2576.00 5
2011-07-10 Perforation 2558.00 2559.00 5
2011-07-10 Perforation 2496.00 2497.00 5
2011-07-10 Perforation 2489.50 2490.50 5
2011-07-12 Fracture 2489.50 2600.00 0

For data sources see[4]



References